IR 05000271/1986009

From kanterella
(Redirected from ML20210V065)
Jump to navigation Jump to search
Emergency Preparedness Insp Rept 50-271/86-09 on 860421-24. No Violations Noted.Major Areas Inspected:Emergency Preparedness Program & Previous Insp Open Items
ML20210V065
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 05/30/1986
From: Hawxhurst J, Lazarus W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20210V043 List:
References
50-271-86-09, 50-271-86-9, NUDOCS 8606100033
Download: ML20210V065 (6)


Text

_ _ _ _ _ _ _ _ _ _ __

. .

,

U.S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION I

'

Report N /86-09 i

Docket N '

License No. OPR-28 Priority -

Category C Licensee: Vermont Yankee Nuclear Power Corporation RD 5, Box 169 - Ferry Road .

Brattleboro, Vermont 05301

! Facility Name: Vermont Yankee *

4 Inspection At: Vernon, Vermont i Inspection Conducted: April 21 - 24, 1986 Inspectors: _ c28 M

' Approved by: __

7. Largods,' c ing, Chief Emergency

_p:;p --

_ff/6 i

dat4 Prepared ssSection I

Inspection Summary: Inspection on April 21-24, 1986 (Report No. 50-271/86-09)

Areas Inspected: Routine, unannounced emergency preparedness inspection of Changes to the Emergency Preparedness Program and previous inspection open

items.

l Results: No violations were identifie The licensee's emergency l' preparedness program corrective actions, discussed after the 1985 annual exercise, are consistent and progressing according to planned corrective j action. As a result 8 items have been close .

8606100033 860530 i

PDR ADOCK 05000271

O PDR

.-_ - . - - - - -

- , ..-_..,.- - ,- - _ - __. --- .-_ _ - -_. .._- - _ -_-. -_._- -.

_ - _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ . _ ._ _. . . _

. .

DETAILS 1.0. Persons Contacted P. Howard, Plant Training Instructor

  • E. Keegan, Environmental Coordinator
  • B. Leach, Chemistry /HP Supervisor J. Pelletier, Plant Manager

"D. Reid, DPS Supervisor B. Reithel, EP Supervisor (YNSD)

J. Smith, Plant Nurse

  • Denotes those present at the exit intervie .0, Previous Open Items a) 85-09-01(Closed) Licensee to more clearly define the duties, responsibilities and lines of authority of the TSC coordinator and other emergency personne The licensee has revised the duties, responsibilities and lines of authority of the TSC coordinator (Rev 11, 9/35) and modified other key manager positions (Radiological Assistant and OSC Assistant) in the emergency organization, b) 85-09-03 (Closed) Audit reports of the emergency preparedness program needed more detailed and better documented findings to substantiate result The inspector reviewed the December 1985 audit conducted by quality assurance inspectors from YAEC. The written report was more rigorous than past years. The audit generally contained findings reflective of the program secpe, deficiencies and weaknesses discovered during Itcensee drills and exercises were tracked and the program review was presented to management, c) 85-13-09(Closed) When the designated OSC coordinator left the OSC for briefings, there was no indication of who was in-charg The licensee has created a new position in the OSC. The assistant OSC, who has all the same training and experience as OSC coordinator, will remain in the OSC and be in charge when the coordinator goes to the TSC for briefings, d) 85-13-12(Closed) There did not appear to be provisions at the EOF for continuous accountability after initial accountabilit The new EOF, approximately 9 miles from the site, at the corporate training building, has procedures to address initial and continuous accountability. An access control list is used by security, staff

. .

2 l assignment boards in the facility are used to identify the i individuals and a stay area for the pool personnel (luncheon and warehouse) is established, e) 85-13-13(Closed) The licensee did not demonstrate that in the event of a prolonged emergency sufficient personnel would be available to support the emergency respons The licensee has stated that observers and controllers were not used to supplement the staffing of the emergency response organization; also, this will again be demonstrated as an objective in the next annual exercis f) 85-13-16 (Closed) There did not appear to be clear, well defined delineation of responsibility and authority in radiological assessmen The inspector noted additional training was provided to the Radiological Assessor as well as a flow chart to delineate his duties and responsi-bilities. This will be demonstrated as an objective in the next exercis g) 85-13-21 (Closed) The check source in the green monitoring kit was not of sufficient strength (radioactivity) tu verify the adequacy of response of the PIC-6 instrumen The inspector and licensee opened the green kit and found the check source (Cs 137) had been changed. The meter on the PIC 6B defiteted to 3mR/hr on contact, h) 85-13-25(Closed) Monitoring procedures for determining air sample background correction factor do not adhere to standard health physics practic The licensee has revised the monitoring procedure to direct survey team members to count air samples in low background areas (less than 2000 cpm).

3.0. 1985 Emergency Preparedness Exercise Follow-up 3.1. B_ackground On April 17, 1985 the licensee held the annual emergency preparedness exercise. This was a full-scale exercise with offsite participation and observation. The NRC and FEMA identified areas of concern during the exercise that needed improvement. On June 6, 1985 a successful remedial  !

drill was held to resolve offsite concerns. Following that, a meeting was I held on July 3,1985 at the NRC Region I of fice to discuss the major areas of concern identified during the exercise and the schedule for '

implementation of corrective action .

l On September 12, 1985 a letter from Vermont Yankee reaffirmed the j

.

m___._ _ . _ . _ _ ___ . _ _ _ . _ _ __ . _ _ _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____ _ _ _ ___

,

. .

corrective actions to be implemented along with estimated completion date .2. Scope The inspector held discussions with the licensee and licensee contractor personnel, examined selective procedures and representative records and inspected various equipment and emergency response facilities. The purpose of this review was to determine if the licensee has completed the corrective actions previously discusse .3. Findings 3. Evaluate the authority and functional responsibility of key managers in the Emergency Pla The VY evaluation will be completed in June 1986. Changes to the E Plan and Procedures preceded by the appropriate training will be completed before the 1986 annual exercise on October 29, 198 The licensee has already revised the duties, responsibilities and lines of authority of the TSC cocrdinator and modified other key manager positions such as Radiological Assistant and OSC Assistant. These had been identified as the most significant changes. The inspector determined that progress in this area is consistent with planned actio .3.2, Modify the training of key managers in any changes or revisions noted in item 2. The inspector verified through selected records that training was ongoing and generally adhered to the schedule submitted in the September 12, 198 5 letter from the Itcensee. The training records for Chemistry and HP Radiological Assistants were checked. All the designated persons had received training in July 1985 and a new flow chart of responsibilities had been incorporated into their procedure in September 198 The licensee plans to provide all key managers with training on changes to the plan prior to the next annual exercis . Assess the overall system of data collection and dissemination of information between emergency response facilitie The licensee has developed several new status forms. A plant status form is used to transfer information via telecopier from the TSC to the EOF. This form though not presently controlled by procedure, was used effectively during the September dril _ _ _ _ _ _ _ _ _ - _ _ ..

, o

The inspector discussed the draft status " boards" (sheets) at the EOF, with the licensee and noted that status sheets appear to still be in draft. Also, they are not permanently mounted and presently don't address some areas. For example, the current emergency classification and significant event information was not include *

The inspector noted commuricators are assigned from the TSC to collect pertinent dat In the control room, for example, a communicator is used to collect radiological / meteorological data for the EOF dose assessment group. Other improvements were the addition of telecopters which speed the flow of informatio This area will be fully reviewed during the 1986 annual exercise.

3. Review the frequency of conducting drills in the functional areas of communication, dose assessment, health physics, i medical and practice exercise The inspector held discussions with licensee personnel, reviewed training records and noted the frequancy of drilis over the past year. The inspector found testing is conducted monthly; however, no formal communications drills were held other than the mini-drill on September 11, 1985. A drill is tentatively planned for October 1, 1986, 4 weeks prior to i the October 29, 1986 exercise. No dose assessment drills are held although table-top discussions are included as part of

'

,

training. The last Health Physics drill was held coincident with the annual exercise, frequency should be semi-annually as stated in the Plan (VY Emergency Plan Section 12. Howey the next drill may be after the current outage accord)ing to $

,

!

Chem /HP supervisor, and another is tentatively scheduled for early July 1986. The last medical drill was also coincident with the exercise in April 1935; the next medical drill is also tentatively scheduled for July 1986. A mini-drill was conducted on September 11, 1985 which included licensee and State players in the EOF. This drill tested the readiness and operations of the new Emergency Operations Facility and by letter FVY 85-82 dated September 12, 1985, the licensee notified NRC Region 1 that the new EOF was ready for operation.

, The inspector concluded that the frequency of drills, other than

'

table-top training, discussed above and also Fire drills appears to meet the 1icensee's commitments.

l 3.L Conduct a drill to evaluate the changes made from the items

identified abov !

The inspector noted a drill was held on September 11, 1985 at l

<

- - , _ _ , _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , _ _ , _ - . _ _ _ _ _ , _ . , _ . _ , , , . _ _ _ _ _ _ _ _ _ _ , , , _

_ _ , _ _ _ . - , _ . _ - . _ _ _ _ . _

. .

the EOF located at the corporate offices in Brattlebor The drill was observed by the NRC Resident Inspectors and addressed in NRC Inspection Report No. 50-271/85-2 In addition, the inspector noted that the draft objectives for the October 29, 1986 exercise will address the outstanding concerns identified during the 1985 exercis .0. Exit Meeting The NRC Inspector met with licensee representatives indicated in Section 1 to discuss the scope and findings of the inspection as detailed in this report. Atno time during this inspection was any written material provided to the license .

!

!

!