MONTHYEARML22347A2792022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 ML20015A5832020-01-15015 January 2020 Independent Spent Fuel Storage Installation Security Inspection Plan IR 05000271/20140062014-09-0202 September 2014 Mid-Cycle Assessment Letter and Inspection Plan 2014 (ROP-15) - Vermont Yankee Nuclear Power Station (Report 05000271-14-006) IR 05000271/20130012014-03-0404 March 2014 2013 Annual Assessment Letter for Vermont Yankee Nuclear Power Station (Report 05000271/2013001)(w/Inspection Plan) IR 05000271/20130062013-09-0303 September 2013 Mid-Cycle Performance Review and Inspection Plan 2013 (ROP-14) - Vermont Yankee Nuclear Power Station (Report 05000271-13-006) IR 05000271/20120012013-03-0404 March 2013 Annual Assessment Letter for Vermont Yankee Nuclear Power Station (Report 05000271/2012001) ML12244A4052012-09-0404 September 2012 Mid-Cycle Performance Review and Inspection Plan - 2013 Vermont Yankee Nuclear Power Station IR 05000271/20110012012-03-0505 March 2012 Annual Assessment Letter for Vermont Yankee Nuclear Power Station (Report 05000271-11-001) ML1124305292011-09-0101 September 2011 Mid-Cycle Performance Review and Inspection Plan 2011 - Vermont Yankee Nuclear Power Station IR 05000271/20100012011-03-0404 March 2011 Annual Assessment Letter for Vermont Yankee Nuclear Power Station (Report 05000271/2010001) ML1024405672010-09-0101 September 2010 Mid-Cycle Performance Review and Inspection Plan 2010 - Vermont Yankee Nuclear Power Station IR 05000271/20010012010-03-0303 March 2010 Annual Assessment Letter Vermont Yankee Nuclear Power Station (05000271-01-001) ML0924400442009-09-0101 September 2009 Mid-Cycle Performance Review and Inspection Plan - Vermont Yankee Nuclear Power Station, Dated 09/01/09 IR 05000271/20090012009-03-0404 March 2009 Annual Assessment Letter, Vermont Yankee (IR 05000271-09-001) ML0824700052008-09-0202 September 2008 Mid-Cycle Performance Review and Inspection Plan Vermont Yankee IR 05000271/20080012008-03-0505 March 2008 Annual Assessment Letter EOC 2007 ROP8 - Vermont Yankee Station (05000271-08-001) ML0734709582007-12-13013 December 2007 ROP8 - Vermont Yankee - Change to Inspection Plan, 12/13/07 IR 05000271/20070012007-03-0202 March 2007 Annual Assessment Letter - Vermont Yankee Nuclear Power Station (Report 05000271-07-001) IR 05000271/20060012006-03-0202 March 2006 Annual Assessment Letter - Vermont Yankee Nuclear Power Station (Report 05000271/2006001) ML0524207102005-08-30030 August 2005 Mid-Cycle Performance Review and Inspection Plan - Vermont Yankee Nuclear Power Station ML0506101212005-03-0202 March 2005 Annual Assessment Letter 2005001 Vermont Yankee ML0423607082004-08-23023 August 2004 Vermont Yankee - Notification of Conduct of a Triennial Fire Protection Baseline Inspection ML0406301922004-03-0202 March 2004 2003-04 Annual Assessment Letter - Vermont Yankee IR 05000271/20030012003-03-0303 March 2003 2003 Annual Assessment Letter - Vermont Yankee (Report 50-271/03-001) IR 05000271/20020012002-03-0404 March 2002 2002 Annual Assessment Letter - Vermont Yankee (Report 50-271/02-001) 2022-12-21
[Table view] Category:Letter
MONTHYEARBVY 24-028, Pre-Notice of Disbursement from Decommissioning Trust2024-10-31031 October 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-10-30030 October 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-026, Pre-Notice of Disbursement from Decommissioning Trust2024-10-0202 October 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status BVY 24-024, Pre-Notice of Disbursement from Decommissioning Trust2024-07-30030 July 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-023, Pre-Notice of Disbursement from Decommissioning Trust2024-07-0202 July 2024 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20240012024-06-28028 June 2024 NRC Inspection Report No. 05000271/2024001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities BVY 24-022, Pre-Notice of Disbursement from Decommissioning Trust2024-05-30030 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-020, Biennial Update of Quality Assurance Program Manual2024-05-22022 May 2024 Biennial Update of Quality Assurance Program Manual BVY 24-019, 2023 Radiological Environmental Operating Report2024-05-0909 May 2024 2023 Radiological Environmental Operating Report BVY 24-017, Pre-Notice of Disbursement from Decommissioning Trust2024-05-0606 May 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-018, 2023 Radiological Effluent Release Report2024-05-0505 May 2024 2023 Radiological Effluent Release Report BVY 24-016, 2023 Individual Monitoring NRC Form 5 Report2024-04-18018 April 2024 2023 Individual Monitoring NRC Form 5 Report BVY 24-015, Pre-Notice of Disbursement from Decommissioning Trust2024-04-0101 April 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-014, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-04-0101 April 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-013, Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 20232024-03-27027 March 2024 Status of Decommissioning and Spent Fuel Management Fund for the Year Ending 2023 BVY 24-012, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-14014 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-011, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-03-0606 March 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-010, Pre-Notice of Disbursement from Decommissioning Trust2024-03-0505 March 2024 Pre-Notice of Disbursement from Decommissioning Trust ML24053A2572024-03-0101 March 2024 Withdrawal of Requested Licensing Action for a License Amendment Submitted for Approval of the License Termination Plan BVY 24-009, Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 3172024-02-27027 February 2024 Withdrawal of License Amendment Request to Add License Condition 3.K, License Termination Plan; Proposed Change No. 317 BVY 24-007, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-02-26026 February 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-008, ISFSI, Annual Radioactive Effluent Release Report2024-02-26026 February 2024 ISFSI, Annual Radioactive Effluent Release Report IR 05000271/20230022024-02-20020 February 2024 NRC Inspection Report Nos. 05000271/2023002 and 07200059/2023001, Northstar Nuclear Decommissioning Company, LLC, Vermont Yankee Nuclear Power Station, Vernon, Vermont BVY 24-006, Pre-Notice of Disbursement from Decommissioning Trust2024-02-0606 February 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 24-005, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-30030 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-004, Report of Investigation Pursuant to 10 CFR 20, Appendix G2024-01-23023 January 2024 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 24-003, Nuclear Onsite Property Damage Insurance2024-01-0404 January 2024 Nuclear Onsite Property Damage Insurance BVY 24-001, Pre-Notice of Disbursement from Decommissioning Trust2024-01-0202 January 2024 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-030, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-12-20020 December 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-029, Proof of Financial Protection2023-12-12012 December 2023 Proof of Financial Protection BVY 23-028, Pre-Notice of Disbursement from Decommissioning Trust2023-11-28028 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-027, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-21021 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-026, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-11-13013 November 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-025, Pre-Notice of Disbursement from Decommissioning Trust2023-11-0202 November 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-023, License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 3172023-10-10010 October 2023 License Amendment Request – Addition of License Condition 3.K, License Termination Plan; Proposed Change No. 317 IR 07200059/20234012023-10-0505 October 2023 Independent Spent Fuel Storage Installation Security Inspection Report 07200059/2023401 BVY 23-022, Pre-Notice of Disbursement from Decommissioning Trust2023-08-23023 August 2023 Pre-Notice of Disbursement from Decommissioning Trust IR 05000271/20230012023-08-15015 August 2023 Northstar Nuclear Decommissioning Company, Llc., Vermont Yankee Nuclear Power Station, - NRC Inspection Report 05000271/2023001 BVY 23-021, Report of Investigation Pursuant to 10 CFR 20, Appendix G2023-08-0202 August 2023 Report of Investigation Pursuant to 10 CFR 20, Appendix G BVY 23-020, Pre-Notice of Disbursement from Decommissioning Trust2023-08-0202 August 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-019, Update to 2022 Radiological Effluent Release Report2023-07-24024 July 2023 Update to 2022 Radiological Effluent Release Report BVY 23-018, Update to Nuclear Onsite Property Damage Insurance2023-07-12012 July 2023 Update to Nuclear Onsite Property Damage Insurance BVY 23-017, Pre-Notice of Disbursement from Decommissioning Trust2023-06-29029 June 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-016, 10 CFR 72.48 Report2023-06-0505 June 2023 10 CFR 72.48 Report BVY 23-015, Report of Investigation Pursuant to 1O CFR 20, Appendix G2023-06-0505 June 2023 Report of Investigation Pursuant to 1O CFR 20, Appendix G BVY 23-014, Pre-Notice of Disbursement from Decommissioning Trust2023-05-31031 May 2023 Pre-Notice of Disbursement from Decommissioning Trust BVY 23-013, 2022 Radiological Environmental Operating Report2023-05-10010 May 2023 2022 Radiological Environmental Operating Report BVY 23-011, 2022 Radiological Effluent Release Report2023-05-10010 May 2023 2022 Radiological Effluent Release Report 2024-09-18
[Table view] |
Text
UNITED STATES rch 5, 2012
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR VERMONT YANKEE NUCLEAR POWER STATION (REPORT 05000271/2011001)
Dear Mr. Wamser:
On February 14, 2012, the U. S. Nuclear Regulatory Commission (NRC) staff completed its end-of-cycle performance review of the Vermont Yankee Nuclear Power Station (Vermont Yankee). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2011 through December 31, 2011. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. This performance review and enclosed inspection plan do not include security information. A separate letter will include the NRCs assessment of your performance in the Security Cornerstone and its security-related inspection plan.
The NRC determined that overall, Vermont Yankee operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined the performance at Vermont Yankee during the most recent quarter was within the Licensee Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix because all inspection findings had very low (i.e., green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., green). Therefore, the NRC plans to conduct ROP baseline inspections at Vermont Yankee.
Last year, given the uncertainty regarding plant operations beyond March 2012 due to ongoing reviews and legal proceedings, the NRC staff conducted performance reviews for Vermont Yankee at the end of the first and third calendar year quarters of 2011. The purpose of these interim performance reviews was to perform an overall review and assessment of Vermont Yankee performance during the previous four calendar year quarters. Accordingly, the NRC conducted quarterly performance reviews of Vermont Yankee in May and November and determined that there were no issues associated with the plants safety performance that warranted additional attention by the NRC. As a result, the NRC concluded that ROP baseline inspections would continue at your facility. These reviews were conducted using guidance contained in NRC Inspection Manual Chapter 0305, Operating Reactor Assessment Program.
Through this quarterly assessment process, the NRC has not observed any change in focus or commitment by Entergy related to assuring safe operations of Vermont Yankee that would indicate additional NRC oversight or assessment in 2012 is currently needed. However, the NRC will continue to monitor the legal proceedings and ongoing reviews associated with Vermont Yankee and will reinstitute a similar assessment process if such an approach is warranted. The NRC will return to its normal oversight with mid- and end-of-cycle performance reviews for calendar year 2012.
The enclosed inspection plan details the inspections, less those related to physical protection, scheduled through June 30, 2013. Routine inspections performed by resident inspectors are not included in the inspection plan. In addition to the baseline inspections, the NRC will perform Temporary Instruction 2515/182, Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping, in July 2012. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 610-337-5200 with any questions you have regarding this letter.
Sincerely,
/RA/
Dr. Ronald R. Bellamy, Branch Chief Division of Reactor Projects Docket Nos. 50-271 License No. DPR-28 Enclosure: Vermont Yankee Inspection/Activity Plan cc w/encl: Distribution via ListServ
ML12061A247 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer RBellamy DATE 02/29/12 03/01/12
Page 1 of 2 Vermont Yankee 02/28/2012 14:15:49 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71003 - LR COMMITMENTS INSP 6 1 01/09/2012 01/13/2012 IP 71003 Post-Approval Site Inspection for License Renewal 1 01/23/2012 01/27/2012 IP 71003 Post-Approval Site Inspection for License Renewal 71124 - RAD HAZARD ACCESS/ALARA 1 1 04/09/2012 04/12/2012 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/09/2012 04/12/2012 IP 71124.02 Occupational ALARA Planning and Controls 9/24EXM - VY INITIAL OL EXAM 5 1 07/30/2012 08/03/2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 1 08/27/2012 08/31/2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 1 09/24/2012 10/05/2012 U01851 FY12-VERMONT YANKEE INITIAL OPERATOR LICENSING EXAM 7111107T - TRIENNIAL HEAT SINK 1 1 05/21/2012 05/25/2012 IP 7111107T Heat Sink Performance MODS - PERMANENT PLANT MODIFICATIONS 4 1 06/04/2012 06/08/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 1 06/18/2012 06/22/2012 IP 7111117T Evaluations of Changes, Tests, or Experiments and Permanent Plant Modifications 7111111B - VY ON-SITE REQUAL INSP W/ P/F RESULTS 2 1 07/23/2012 07/27/2012 IP 7111111B Licensed Operator Requalification Program 71124 - RAD AIRBORNE & DOSE ASSESSMENT & ISFSI 1 1 07/09/2012 07/13/2012 IP 60855 Operation Of An ISFSI 1 07/09/2012 07/13/2012 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 07/09/2012 07/13/2012 IP 71124.04 Occupational Dose Assessment TI 182 - DEGRADATION OF UNDERGROUND PIPING 1 1 07/16/2012 07/20/2012 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping EP PROGR - EP PROGRAM INSPECTION 1 1 09/10/2012 09/21/2012 IP 7111402 Alert and Notification System Testing 1 09/10/2012 09/21/2012 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 09/10/2012 09/21/2012 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124.05 - RAD MONT INSTRUMENT 1 1 09/10/2012 09/13/2012 IP 71124.05 Radiation Monitoring Instrumentation 92702 - FOLLOWUP TO CONFIRMATORY ORDER (QA/QC) 1 1 10/01/2012 12/31/2012 IP 92702 Followup On Corrective Actions For Violations And Deviations 71152 - QUARTERLY PI&R SAMPLE -TAGGING 1 1 10/15/2012 10/19/2012 IP 71152 Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Page 2 of 2 Vermont Yankee 02/28/2012 14:15:49 Inspection / Activity Plan Report 22 01/01/2012 - 06/30/2013 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RADIOACTIVE EFFLUENT MONITORTREATMENT PI 1 1 11/05/2012 11/08/2012 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 1 11/05/2012 11/08/2012 IP 71151-OR01 Occupational Exposure Control Effectiveness 1 11/05/2012 11/08/2012 IP 71151-PR01 RETS/ODCM Radiological Effluent INSP - OPERATION OF AN ISFSI 1 1 03/01/2013 06/30/2013 IP 60855 Operation Of An ISFSI 7111108G - INSERVICE INSPECTION 1 1 03/11/2013 03/15/2013 IP 7111108G Inservice Inspection Activities - BWR 71124 - HP INSPECTION 01 02 03 & 04 1 1 03/11/2013 03/15/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/11/2013 03/15/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 03/11/2013 03/15/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 03/11/2013 03/15/2013 IP 71124.04 Occupational Dose Assessment 71124.07 - RAD ENVIRONMENTAL MONITORING PROGRAM 1 1 04/14/2013 04/19/2013 IP 71124.07 Radiological Environmental Monitoring Program 71124.08 - RADWASTE 1 1 05/13/2013 05/17/2013 IP 71124.08 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation EP EX - EP EXERCISE EVALUATION 5 1 06/03/2013 06/07/2013 IP 7111401 Exercise Evaluation 1 06/03/2013 06/07/2013 IP 7111404 Emergency Action Level and Emergency Plan Changes PI&R - PI&R 4 1 06/03/2013 06/07/2013 IP 71152B Problem Identification and Resolution 1 06/17/2013 06/21/2013 IP 71152B Problem Identification and Resolution This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.