ML20209F557
ML20209F557 | |
Person / Time | |
---|---|
Site: | Rensselaer Polytechnic Institute |
Issue date: | 08/22/1986 |
From: | Harris D RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY |
To: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
References | |
NUDOCS 8609120193 | |
Download: ML20209F557 (1) | |
Similar Documents at Rensselaer Polytechnic Institute | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20236S4451998-07-20020 July 1998
[Table view]Forwards Copy of Recently Approved Regulation in Fr Which Permits Colleges & Univs to self-guarantee Decommissioning Costs If Certain Criteria Are Met.Requests Provision of Criterion to Be Used If School Decides to self-guarantee ML20217H6461998-04-28028 April 1998 Forwards Insp Rept 50-225/98-201 on 980407-10.No Violations Noted ML20217H4111997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20148F0771997-05-29029 May 1997 Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 ML20135C0821997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20133D0691996-12-26026 December 1996 Forwards Initial Exam Rept 50-225/OL-96-01 on 961119, Administered to Employee Who Applied for License to Operate Licensee Reactor,& Exam & Answer Key.W/O Encl ML20133A4721996-12-26026 December 1996 Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl ML18065B2651995-07-21021 July 1995 Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs ML20058E4681993-11-26026 November 1993 Forwards Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-04.No Violations Noted ML20059J1231993-11-0303 November 1993 Discusses Telcon Arrangements Made for Administration of Operator Licensing Exam.Written & Operating Exams Scheduled for Wk of 940110 ML20044E1201993-04-16016 April 1993 Requests Clarification That NRC Requalification Exam Scheduled for 930225,will Not Be Taken,Renewing NRC License Will Not Be Requested & That License Will Expire on Expiration Date ML20044F6631992-02-0606 February 1992 Forwards SO License Certificate for Dk Hayes & Extends Congratulations.W/O Encl ML20092C8061991-08-16016 August 1991 Advises of Licensee Plans to Double Storage Capacity of Fuel Vault ML20077R6771991-08-0808 August 1991 Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors ML20077D9561991-05-30030 May 1991 Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) ML20073P8341991-05-15015 May 1991 Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20073G8631991-04-30030 April 1991 Forwards CE Proprietary ABB Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) ML20073G8561991-04-12012 April 1991 Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility ML20070U7151991-04-0303 April 1991 Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 ML20077A4371991-03-25025 March 1991 Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) ML20059K1611990-09-14014 September 1990 Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20006D6441990-01-0505 January 1990 Forwards Revised NRC Forms 398 & 396 Re Personal Qualifications Statement & Certification of Medical Exam by Facility Licensee,Respectively.All Applications for Licenses to Be Submitted on Revised Forms by 900201 ML20005E1171989-12-27027 December 1989 Forwards Exam Rept 50-225/89-01OL on 890906-07 ML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20235F7361987-09-22022 September 1987 Ack Reciept of 870811 Comments on Changes to Reactor Staffing at Rensselaer Polytechnic Inst Critical Experiment Reactor Facility.Conversion Granted ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) 1998-07-20 Category:EDUCATIONAL INSTITUTION TO NRC MONTHYEARML20059K1611990-09-14014 September 1990
[Table view]Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20206Q5291987-04-15015 April 1987 Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators ML20207S2931987-03-12012 March 1987 Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code ML20212N3841987-03-0303 March 1987 Forwards Response to 870106 Request for Addl Info Re 861003 Proposal to Convert Reactor Critical Facility Core to Use Low Enrichment U Fuel ML20212C5821987-02-24024 February 1987 Notifies of Application of 10CFR55.31(e) to Senior Reactor Operators Licenses During Rensselaer Polytechnic Inst Highly Enriched U/Low Enriched U Core Conversion Process,Per Telcons.Listed Tasks Underway ML20212F9701986-12-23023 December 1986 Forwards Security Plan Documenting Physical & Procedural Measures to Prevent Theft of Reactor Fuel & Sabotage to Critical Facility.Plan Withheld (Ref 10CFR2.790(d) & 73.21(a)) ML20215C1481986-10-0303 October 1986 Requests Permission for Conversion of Core to Low Enriched U Fuel & Continued Operation Per Encls.Conversion Specifics Discussed ML20210H2671986-09-22022 September 1986 Advises That Fr Vera New Supervisor of Facility ML20209F5571986-08-22022 August 1986 Forwards Description of Upgraded Physical Security Sys, Including Infrared Motion Sensors & New Control Panel.W/O Encl ML20141F9231986-04-17017 April 1986 Forwards 860317 Annual Rept Ltr to Region I,Containing Addl Info Missing from 860317 Rept Ltr to Div of Licensing,Per 860414 Telcon Request ML20138N9031985-10-18018 October 1985 Forwards Answer & Consent to Commission Order to Show Cause ML20101U3981985-01-31031 January 1985 Advises That Emergency Plan for License CX-22,submitted on 841205 & Approved by NRC ,Fully Implemented ML20100L9041984-12-0505 December 1984 Forwards Proposed Emergency Plan for License CX-22 Dtd Dec 1984,superseding Proposed Emergency Plan Dtd Sept 1984. Emergency Planning Zone in Section 6 Changed to Outside Reactor Room But Inside Bldg ML20093F7711984-09-28028 September 1984 Forwards Proposed Emergency Plan, in Response to 840730 Request for Addl Info & IE Info Notice 83-66,Suppl 1.Plan Provides Addl Info in Sections 3.5 & 3.6 Re Emergency Action Levels & Emergency Planning Zones,Respectively ML20082L5631983-11-18018 November 1983 Forwards Financial Rept for Yrs Ending June 1982 & June 1983 ML20078L0891983-10-13013 October 1983 Forwards Ltr to Replace Re Tech Specs.Original Ltr Missing Signatures ML20078L1011983-10-12012 October 1983 Forwards Amended Tech Specs.W/O Encls ML20080J3471983-09-21021 September 1983 Forwards Responses to 830726 Questions from Review of Documentation Submitted in Support of Application for License Renewal ML20023C5991983-04-26026 April 1983 Forwards Revised Physical Security Plan,Replacing 820426 Plan.Plan Withheld (Ref 10CFR2.790 & 73.21) ML20070P1561983-01-21021 January 1983 Forwards Rensselaer Polytechnic Inst Critical Facility Sar ML20028D4521983-01-13013 January 1983 Submits Public Version of Opinion That Emergency Response Plan,Already Filed,Fulfills Requirements of 10CFR50.54.If Mods Necessary,Response Will Be Provided ML20052B4161982-04-26026 April 1982 Forwards Physical Security Plan Replacing Plan Submitted on 820326.Plan Withheld (Ref 10CFR2.790) ML20050B8631982-03-26026 March 1982 Forwards Physical Security Plan,Per 810302 Ltr.Plan Withheld (Ref 10CFR2.790) ML20049K0371982-03-0101 March 1982 Submits Annual Operating Rept of Activities & Experiments for License CX-22,Mar 1981-Mar 1982 ML20040G3291982-02-0808 February 1982 Informs That RPI Critical Facility Has Less than 5,000 G U-235 on Site,In Response to 820115 Telcon.Change Represents Amended Condition for Current OL & Application for Renewal ML20040F2621982-01-12012 January 1982 Responds to NRC Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:New Critical Facility Supervisor Reviewed Operating Procedures ML20032C4301981-08-0303 August 1981 Responds to NRC Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:Procedures for Notification of Appropriate Persons of Abnormal Events & for Use on Counting Equipment Written & Approved ML20003D2091981-03-0101 March 1981 Submits Annual Rept of Tests & Experiments for 800301- 810301.Facility Was Utilized for Graduate Course on Reactor Experiments,Summer Course on Reactor Design & Project Work to Satisfy Degree Requirements ML19331D3201980-08-22022 August 1980 Forwards Critical Experiments Facility Security Plan.Plan Withheld (Ref 10CFR2.790).Telcon W/P Trimble Informed of Shipment of Excess SNM to Oak Ridge,Tn ML19309F6701980-03-28028 March 1980 Responds to NRC 800310 Ltr Re Violations Noted in IE Insp Rept 50-225/80-01.Corrective Actions:Personnel Monitoring Procedure Revised & TLD Records Now Computerized ML19323B3791980-03-27027 March 1980 Responds to NRC 800307 Ltr Re Violations Noted in IE Insp Rept 50-225/80-02.Corrective Actions:Telephone Extension Installed in Control Room.Students Instructed to Work in Pairs When Practicable ML19294C1931980-02-29029 February 1980 Submits Operating Rept of Tests & Experiments Conducted Mar 1979 - Mar 1980 ML19253B0261979-09-12012 September 1979 Submits Application for Renewal of License CX-22.Forwards Fsar,Eia,Revised Section 6 of Tech Specs,Emergency Plan & 790615 & 0707 Ltrs Re Emergency Procedures ML19263E3181979-06-0101 June 1979 Forwards Executed Amend 9 to Indemnity Agreement E-42 ML19270F7301979-03-0101 March 1979 Submits Rept of Tests & Experiments Conducted from 780301 to 790301.No Changes to Tech Specs & No Unreviewed Safety Questions ML20062B7501978-10-26026 October 1978 Advises That Insurance Broker Sending Advance Premium Endorsement.Indemnity Agreement Was Forwarded Earlier 1990-09-14 Category:INCOMING CORRESPONDENCE MONTHYEARML20148F0771997-05-29029 May 1997
[Table view]Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 ML18065B2651995-07-21021 July 1995 Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs ML20077R6771991-08-0808 August 1991 Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors ML20077D9561991-05-30030 May 1991 Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) ML20073P8341991-05-15015 May 1991 Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20073G8631991-04-30030 April 1991 Forwards CE Proprietary ABB Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) ML20073G8561991-04-12012 April 1991 Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility ML20070U7151991-04-0303 April 1991 Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 ML20077A4371991-03-25025 March 1991 Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) ML20059K1611990-09-14014 September 1990 Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20206Q5291987-04-15015 April 1987 Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators ML20214Q5951987-04-10010 April 1987 Forwards EGG-NTA-7660, Evaluation of Spert Fuel at Rensselaer Polytechnic Inst, Technical Evaluation Rept Submitted as Part of Task 3 ML20207S2931987-03-12012 March 1987 Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code ML20212N3841987-03-0303 March 1987 Forwards Response to 870106 Request for Addl Info Re 861003 Proposal to Convert Reactor Critical Facility Core to Use Low Enrichment U Fuel ML20212C5821987-02-24024 February 1987 Notifies of Application of 10CFR55.31(e) to Senior Reactor Operators Licenses During Rensselaer Polytechnic Inst Highly Enriched U/Low Enriched U Core Conversion Process,Per Telcons.Listed Tasks Underway ML20212F9701986-12-23023 December 1986 Forwards Security Plan Documenting Physical & Procedural Measures to Prevent Theft of Reactor Fuel & Sabotage to Critical Facility.Plan Withheld (Ref 10CFR2.790(d) & 73.21(a)) ML20215C1481986-10-0303 October 1986 Requests Permission for Conversion of Core to Low Enriched U Fuel & Continued Operation Per Encls.Conversion Specifics Discussed ML20210H2671986-09-22022 September 1986 Advises That Fr Vera New Supervisor of Facility ML20209F5571986-08-22022 August 1986 Forwards Description of Upgraded Physical Security Sys, Including Infrared Motion Sensors & New Control Panel.W/O Encl ML20141F9231986-04-17017 April 1986 Forwards 860317 Annual Rept Ltr to Region I,Containing Addl Info Missing from 860317 Rept Ltr to Div of Licensing,Per 860414 Telcon Request ML20138N9031985-10-18018 October 1985 Forwards Answer & Consent to Commission Order to Show Cause ML20101U3981985-01-31031 January 1985 Advises That Emergency Plan for License CX-22,submitted on 841205 & Approved by NRC ,Fully Implemented ML20100L9041984-12-0505 December 1984 Forwards Proposed Emergency Plan for License CX-22 Dtd Dec 1984,superseding Proposed Emergency Plan Dtd Sept 1984. Emergency Planning Zone in Section 6 Changed to Outside Reactor Room But Inside Bldg ML20093F7711984-09-28028 September 1984 Forwards Proposed Emergency Plan, in Response to 840730 Request for Addl Info & IE Info Notice 83-66,Suppl 1.Plan Provides Addl Info in Sections 3.5 & 3.6 Re Emergency Action Levels & Emergency Planning Zones,Respectively ML20082L5631983-11-18018 November 1983 Forwards Financial Rept for Yrs Ending June 1982 & June 1983 ML20078L0891983-10-13013 October 1983 Forwards Ltr to Replace Re Tech Specs.Original Ltr Missing Signatures ML20078L1011983-10-12012 October 1983 Forwards Amended Tech Specs.W/O Encls ML20080J3471983-09-21021 September 1983 Forwards Responses to 830726 Questions from Review of Documentation Submitted in Support of Application for License Renewal ML20023C5991983-04-26026 April 1983 Forwards Revised Physical Security Plan,Replacing 820426 Plan.Plan Withheld (Ref 10CFR2.790 & 73.21) ML20070P1561983-01-21021 January 1983 Forwards Rensselaer Polytechnic Inst Critical Facility Sar ML20028D4521983-01-13013 January 1983 Submits Public Version of Opinion That Emergency Response Plan,Already Filed,Fulfills Requirements of 10CFR50.54.If Mods Necessary,Response Will Be Provided ML20052B4161982-04-26026 April 1982 Forwards Physical Security Plan Replacing Plan Submitted on 820326.Plan Withheld (Ref 10CFR2.790) ML20050B8631982-03-26026 March 1982 Forwards Physical Security Plan,Per 810302 Ltr.Plan Withheld (Ref 10CFR2.790) ML20049K0371982-03-0101 March 1982 Submits Annual Operating Rept of Activities & Experiments for License CX-22,Mar 1981-Mar 1982 ML20040G3291982-02-0808 February 1982 Informs That RPI Critical Facility Has Less than 5,000 G U-235 on Site,In Response to 820115 Telcon.Change Represents Amended Condition for Current OL & Application for Renewal ML20040F2621982-01-12012 January 1982 Responds to NRC Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:New Critical Facility Supervisor Reviewed Operating Procedures ML20032C4301981-08-0303 August 1981 Responds to NRC Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:Procedures for Notification of Appropriate Persons of Abnormal Events & for Use on Counting Equipment Written & Approved ML20003D2091981-03-0101 March 1981 Submits Annual Rept of Tests & Experiments for 800301- 810301.Facility Was Utilized for Graduate Course on Reactor Experiments,Summer Course on Reactor Design & Project Work to Satisfy Degree Requirements ML19331D3201980-08-22022 August 1980 Forwards Critical Experiments Facility Security Plan.Plan Withheld (Ref 10CFR2.790).Telcon W/P Trimble Informed of Shipment of Excess SNM to Oak Ridge,Tn ML19309F6701980-03-28028 March 1980 Responds to NRC 800310 Ltr Re Violations Noted in IE Insp Rept 50-225/80-01.Corrective Actions:Personnel Monitoring Procedure Revised & TLD Records Now Computerized ML19323B3791980-03-27027 March 1980 Responds to NRC 800307 Ltr Re Violations Noted in IE Insp Rept 50-225/80-02.Corrective Actions:Telephone Extension Installed in Control Room.Students Instructed to Work in Pairs When Practicable ML19294C1931980-02-29029 February 1980 Submits Operating Rept of Tests & Experiments Conducted Mar 1979 - Mar 1980 1997-05-29 |
Text
_.
Departri1ent of Nuclear Engineering f%
,b
,L 'h ?+V6 Rensselaer Polytechnic Institute Troy, New York 12180-3590 August 22, 198 6 Thomas T. Martin, Director Division of Radiation Safety and Safeguards U.S. Nuclear Regulatory Commission - Region I 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Str:
Approval was obtained recently (R. Lahey to D. Harris 15 Aug 86) for a further upgrade of the physical security system at the RPI Reactor Critical Facility. This upgrade, which will require several monthe for completion, is described here for your information and approval. The upgrade consists of (a) new infrared motion sensors, (b) a new control panel, (c) an 8 zone alarm system to RPI secruity, (d) new relay modules to GE security, and (e) Medico high security key station together with new cores. Details of the upgrade are given in the attachments.
Sincerely, A
Dr. Donald R. Harris, Director RPI Reactor Critical Facility DRH/evh Attachments C/ R. Lahey b '
\\\\
8609120193 860822 PDR ADOCK 05000225 g