ML20215E041
| ML20215E041 | |
| Person / Time | |
|---|---|
| Site: | Rensselaer Polytechnic Institute |
| Issue date: | 06/12/1987 |
| From: | Harris D, Rodriguezvera RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY |
| To: | Berkow H Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8706190233 | |
| Download: ML20215E041 (2) | |
Text
-
c-.-....-.-.
f
,t 4
Engineenng PHYSICS
, ewe L _ ?,;.T__
- k Rensselaer Polytechnic Institute Troy, New York 12180-3590 June 12, 1987 Herbert N. Berkow, Director Standardization and Non-Power Reactor Project Directorate Division of Reactor Projects - III, IV, V and Special Projects, NRR US Nuclear Regulatory Commission Washington, DC 20555
SUBJECT:
RPI REACTOR CRITICAL FACILITY FENCE MODIFICATIONS, LICENSE CX-22, DOCKET NO. 50-215.
Dear Mr. Berkow:
Fence modifications around the Civil Protection and Security Zones of the RPI Reactor Critical Facility were completed on June 11, 1987 (figure enclosed).
These changes return the Facility Security to the " spirit" of the past situation (before 30 December 1986) and to that of the new Security Plan submitted to the US Nuclear Regulatory Commission.
Sincerely, l
Cy Mr. Fya cis Rodriguez-Vera, Dr. Don ld R. Harris Super isor Director RPI Reactor Critical Facility RPI Reactor Critical Facility Enclosure ec:
R. Block B. Drobnicki G. Dahl C. Judd D. Sangrey j
A. Macica O
8706190233 870612 r
j PDR ADOCK 05000225 l'
I F
PDR j
t
4
,6
+
l l
l J
i l
l i
f j
I,l 1
g i
1a C-lI I]
1E mi j
?,
u ejm j
j i
i Ej 2
e i
{d
~N
- 5 :
il g
j r.{
3
=
i 3
T s
3
~R.
~
.l 1
1 N
wk-A
~~~
.)
4 : \\;
i i
e
^
N%
v5 g
R ome 1
E 1
J