Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20148F077 | 29 May 1997 | Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 | |
ML18065B265 | 21 July 1995 | Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs | |
ML20077R677 | 8 August 1991 | Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors | Boric Acid |
ML20077D956 | 30 May 1991 | Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) | |
ML20073P834 | 15 May 1991 | Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi | |
ML20073G863 | 30 April 1991 | Forwards CE Proprietary Abb Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) | |
ML20073G856 | 12 April 1991 | Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility | Shutdown Margin |
ML20070U715 | 3 April 1991 | Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 | |
ML20077A437 | 25 March 1991 | Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) | |
ML20059K161 | 14 September 1990 | Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request | |
ML20059K170 | 13 September 1990 | Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) | |
ML20055H950 | 26 July 1990 | Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 | |
ML20247J197 | 22 May 1989 | Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 | |
ML20235V787 | 17 February 1989 | Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC | |
ML20246K943 | 16 September 1988 | Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) | |
ML20234C004 | 10 September 1987 | Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus | |
ML20215E041 | 12 June 1987 | Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan | |
ML20215E111 | 9 June 1987 | Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl | |
ML20206Q529 | 15 April 1987 | Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators | |
ML20214Q595 | 10 April 1987 | Forwards EGG-NTA-7660, Evaluation of Spert Fuel at Rensselaer Polytechnic Inst, Technical Evaluation Rept Submitted as Part of Task 3 | |
ML20207S293 | 12 March 1987 | Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code | |
ML20212N384 | 3 March 1987 | Forwards Response to 870106 Request for Addl Info Re 861003 Proposal to Convert Reactor Critical Facility Core to Use Low Enrichment U Fuel | Shutdown Margin |
ML20212C582 | 24 February 1987 | Notifies of Application of 10CFR55.31(e) to Senior Reactor Operators Licenses During Rensselaer Polytechnic Inst Highly Enriched U/Low Enriched U Core Conversion Process,Per Telcons.Listed Tasks Underway | |
ML20212F970 | 23 December 1986 | Forwards Security Plan Documenting Physical & Procedural Measures to Prevent Theft of Reactor Fuel & Sabotage to Critical Facility.Plan Withheld (Ref 10CFR2.790(d) & 73.21(a)) | |
ML20215C148 | 3 October 1986 | Requests Permission for Conversion of Core to Low Enriched U Fuel & Continued Operation Per Encls.Conversion Specifics Discussed | |
ML20210H267 | 22 September 1986 | Advises That Fr Vera New Supervisor of Facility | |
ML20209F557 | 22 August 1986 | Forwards Description of Upgraded Physical Security Sys, Including Infrared Motion Sensors & New Control Panel.W/O Encl | |
ML20141F923 | 17 April 1986 | Forwards 860317 Annual Rept Ltr to Region I,Containing Addl Info Missing from 860317 Rept Ltr to Div of Licensing,Per 860414 Telcon Request | |
ML20138N903 | 18 October 1985 | Forwards Answer & Consent to Commission Order to Show Cause | |
ML20101U398 | 31 January 1985 | Advises That Emergency Plan for License CX-22,submitted on 841205 & Approved by NRC ,Fully Implemented | |
ML20100L904 | 5 December 1984 | Forwards Proposed Emergency Plan for License CX-22 Dtd Dec 1984,superseding Proposed Emergency Plan Dtd Sept 1984. Emergency Planning Zone in Section 6 Changed to Outside Reactor Room But Inside Bldg | |
ML20093F771 | 28 September 1984 | Forwards Proposed Emergency Plan, in Response to 840730 Request for Addl Info & IE Info Notice 83-66,Suppl 1.Plan Provides Addl Info in Sections 3.5 & 3.6 Re Emergency Action Levels & Emergency Planning Zones,Respectively | |
ML20082L563 | 18 November 1983 | Forwards Financial Rept for Yrs Ending June 1982 & June 1983 | |
ML20078L089 | 13 October 1983 | Forwards Ltr to Replace Re Tech Specs.Original Ltr Missing Signatures | |
ML20078L101 | 12 October 1983 | Forwards Amended Tech Specs.W/O Encls | |
ML20080J347 | 21 September 1983 | Forwards Responses to 830726 Questions from Review of Documentation Submitted in Support of Application for License Renewal | License Renewal |
ML20023C599 | 26 April 1983 | Forwards Revised Physical Security Plan,Replacing 820426 Plan.Plan Withheld (Ref 10CFR2.790 & 73.21) | |
ML20070P156 | 21 January 1983 | Forwards Rensselaer Polytechnic Inst Critical Facility Sar | |
ML20028D452 | 13 January 1983 | Submits Public Version of Opinion That Emergency Response Plan,Already Filed,Fulfills Requirements of 10CFR50.54.If Mods Necessary,Response Will Be Provided | |
ML20052B416 | 26 April 1982 | Forwards Physical Security Plan Replacing Plan Submitted on 820326.Plan Withheld (Ref 10CFR2.790) | |
ML20050B863 | 26 March 1982 | Forwards Physical Security Plan,Per 810302 Ltr.Plan Withheld (Ref 10CFR2.790) | |
ML20049K037 | 1 March 1982 | Submits Annual Operating Rept of Activities & Experiments for License CX-22,Mar 1981-Mar 1982 | |
ML20040G329 | 8 February 1982 | Informs That RPI Critical Facility Has Less than 5,000 G U-235 on Site,In Response to 820115 Telcon.Change Represents Amended Condition for Current OL & Application for Renewal | |
ML20040F262 | 12 January 1982 | Responds to NRC 811104 Ltr Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:New Critical Facility Supervisor Reviewed Operating Procedures | |
ML20003D209 | 1 March 1981 | Submits Annual Rept of Tests & Experiments for 800301- 810301.Facility Was Utilized for Graduate Course on Reactor Experiments,Summer Course on Reactor Design & Project Work to Satisfy Degree Requirements | |
ML19331D320 | 22 August 1980 | Forwards Critical Experiments Facility Security Plan.Plan Withheld (Ref 10CFR2.790).Telcon W/P Trimble Informed of Shipment of Excess SNM to Oak Ridge,Tn | |
ML19309F670 | 28 March 1980 | Responds to NRC 800310 Ltr Re Violations Noted in IE Insp Rept 50-225/80-01.Corrective Actions:Personnel Monitoring Procedure Revised & TLD Records Now Computerized | |
ML19323B379 | 27 March 1980 | Responds to NRC 800307 Ltr Re Violations Noted in IE Insp Rept 50-225/80-02.Corrective Actions:Telephone Extension Installed in Control Room.Students Instructed to Work in Pairs When Practicable | |
ML19294C193 | 29 February 1980 | Submits Operating Rept of Tests & Experiments Conducted Mar 1979 - Mar 1980 | |
ML19253B026 | 12 September 1979 | Submits Application for Renewal of License CX-22.Forwards Fsar,Eia,Revised Section 6 of Tech Specs,Emergency Plan & 790615 & 0707 Ltrs Re Emergency Procedures |