ML20100L904
ML20100L904 | |
Person / Time | |
---|---|
Site: | Rensselaer Polytechnic Institute |
Issue date: | 12/05/1984 |
From: | Harris D, Wicks F RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY |
To: | Thomas C Office of Nuclear Reactor Regulation |
Shared Package | |
ML20100L906 | List: |
References | |
NUDOCS 8412120131 | |
Download: ML20100L904 (1) | |
Similar Documents at Rensselaer Polytechnic Institute | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20236S4451998-07-20020 July 1998
[Table view]Forwards Copy of Recently Approved Regulation in Fr Which Permits Colleges & Univs to self-guarantee Decommissioning Costs If Certain Criteria Are Met.Requests Provision of Criterion to Be Used If School Decides to self-guarantee ML20217H6461998-04-28028 April 1998 Forwards Insp Rept 50-225/98-201 on 980407-10.No Violations Noted ML20217H4111997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20148F0771997-05-29029 May 1997 Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 ML20135C0821997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20133A4721996-12-26026 December 1996 Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl ML20133D0691996-12-26026 December 1996 Forwards Initial Exam Rept 50-225/OL-96-01 on 961119, Administered to Employee Who Applied for License to Operate Licensee Reactor,& Exam & Answer Key.W/O Encl ML18065B2651995-07-21021 July 1995 Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs ML20058E4681993-11-26026 November 1993 Forwards Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-04.No Violations Noted ML20059J1231993-11-0303 November 1993 Discusses Telcon Arrangements Made for Administration of Operator Licensing Exam.Written & Operating Exams Scheduled for Wk of 940110 ML20092C8061991-08-16016 August 1991 Advises of Licensee Plans to Double Storage Capacity of Fuel Vault ML20077R6771991-08-0808 August 1991 Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors ML20077D9561991-05-30030 May 1991 Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) ML20073P8341991-05-15015 May 1991 Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20073G8631991-04-30030 April 1991 Forwards CE Proprietary Abb Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) ML20073G8561991-04-12012 April 1991 Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility ML20070U7151991-04-0303 April 1991 Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 ML20077A4371991-03-25025 March 1991 Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) ML20059K1611990-09-14014 September 1990 Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20235F7361987-09-22022 September 1987 Ack Reciept of 870811 Comments on Changes to Reactor Staffing at Rensselaer Polytechnic Inst Critical Experiment Reactor Facility.Conversion Granted ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) ML20206Q5291987-04-15015 April 1987 Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators ML20214Q5951987-04-10010 April 1987 Forwards EGG-NTA-7660, Evaluation of Spert Fuel at Rensselaer Polytechnic Inst, Technical Evaluation Rept Submitted as Part of Task 3 ML20205T5541987-03-31031 March 1987 Advises That 870205 Rev to Security Plan Will Be Reviewed w/861223 Security Plan.Headquarters Will Respond Re Rev ML20207S2931987-03-12012 March 1987 Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code 1998-07-20 Category:EDUCATIONAL INSTITUTION TO NRC MONTHYEARML20059K1611990-09-14014 September 1990
[Table view]Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20206Q5291987-04-15015 April 1987 Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators ML20207S2931987-03-12012 March 1987 Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code ML20212N3841987-03-0303 March 1987 Forwards Response to 870106 Request for Addl Info Re 861003 Proposal to Convert Reactor Critical Facility Core to Use Low Enrichment U Fuel ML20212C5821987-02-24024 February 1987 Notifies of Application of 10CFR55.31(e) to Senior Reactor Operators Licenses During Rensselaer Polytechnic Inst Highly Enriched U/Low Enriched U Core Conversion Process,Per Telcons.Listed Tasks Underway ML20212F9701986-12-23023 December 1986 Forwards Security Plan Documenting Physical & Procedural Measures to Prevent Theft of Reactor Fuel & Sabotage to Critical Facility.Plan Withheld (Ref 10CFR2.790(d) & 73.21(a)) ML20215C1481986-10-0303 October 1986 Requests Permission for Conversion of Core to Low Enriched U Fuel & Continued Operation Per Encls.Conversion Specifics Discussed ML20210H2671986-09-22022 September 1986 Advises That Fr Vera New Supervisor of Facility ML20209F5571986-08-22022 August 1986 Forwards Description of Upgraded Physical Security Sys, Including Infrared Motion Sensors & New Control Panel.W/O Encl ML20141F9231986-04-17017 April 1986 Forwards 860317 Annual Rept Ltr to Region I,Containing Addl Info Missing from 860317 Rept Ltr to Div of Licensing,Per 860414 Telcon Request ML20138N9031985-10-18018 October 1985 Forwards Answer & Consent to Commission Order to Show Cause ML20101U3981985-01-31031 January 1985 Advises That Emergency Plan for License CX-22,submitted on 841205 & Approved by NRC ,Fully Implemented ML20100L9041984-12-0505 December 1984 Forwards Proposed Emergency Plan for License CX-22 Dtd Dec 1984,superseding Proposed Emergency Plan Dtd Sept 1984. Emergency Planning Zone in Section 6 Changed to Outside Reactor Room But Inside Bldg ML20093F7711984-09-28028 September 1984 Forwards Proposed Emergency Plan, in Response to 840730 Request for Addl Info & IE Info Notice 83-66,Suppl 1.Plan Provides Addl Info in Sections 3.5 & 3.6 Re Emergency Action Levels & Emergency Planning Zones,Respectively ML20082L5631983-11-18018 November 1983 Forwards Financial Rept for Yrs Ending June 1982 & June 1983 ML20078L0891983-10-13013 October 1983 Forwards Ltr to Replace Re Tech Specs.Original Ltr Missing Signatures ML20078L1011983-10-12012 October 1983 Forwards Amended Tech Specs.W/O Encls ML20080J3471983-09-21021 September 1983 Forwards Responses to 830726 Questions from Review of Documentation Submitted in Support of Application for License Renewal ML20023C5991983-04-26026 April 1983 Forwards Revised Physical Security Plan,Replacing 820426 Plan.Plan Withheld (Ref 10CFR2.790 & 73.21) ML20070P1561983-01-21021 January 1983 Forwards Rensselaer Polytechnic Inst Critical Facility Sar ML20028D4521983-01-13013 January 1983 Submits Public Version of Opinion That Emergency Response Plan,Already Filed,Fulfills Requirements of 10CFR50.54.If Mods Necessary,Response Will Be Provided ML20052B4161982-04-26026 April 1982 Forwards Physical Security Plan Replacing Plan Submitted on 820326.Plan Withheld (Ref 10CFR2.790) ML20050B8631982-03-26026 March 1982 Forwards Physical Security Plan,Per 810302 Ltr.Plan Withheld (Ref 10CFR2.790) ML20049K0371982-03-0101 March 1982 Submits Annual Operating Rept of Activities & Experiments for License CX-22,Mar 1981-Mar 1982 ML20040G3291982-02-0808 February 1982 Informs That RPI Critical Facility Has Less than 5,000 G U-235 on Site,In Response to 820115 Telcon.Change Represents Amended Condition for Current OL & Application for Renewal ML20040F2621982-01-12012 January 1982 Responds to NRC 811104 Ltr Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:New Critical Facility Supervisor Reviewed Operating Procedures ML20003D2091981-03-0101 March 1981 Submits Annual Rept of Tests & Experiments for 800301- 810301.Facility Was Utilized for Graduate Course on Reactor Experiments,Summer Course on Reactor Design & Project Work to Satisfy Degree Requirements ML19331D3201980-08-22022 August 1980 Forwards Critical Experiments Facility Security Plan.Plan Withheld (Ref 10CFR2.790).Telcon W/P Trimble Informed of Shipment of Excess SNM to Oak Ridge,Tn ML19309F6701980-03-28028 March 1980 Responds to NRC 800310 Ltr Re Violations Noted in IE Insp Rept 50-225/80-01.Corrective Actions:Personnel Monitoring Procedure Revised & TLD Records Now Computerized ML19323B3791980-03-27027 March 1980 Responds to NRC 800307 Ltr Re Violations Noted in IE Insp Rept 50-225/80-02.Corrective Actions:Telephone Extension Installed in Control Room.Students Instructed to Work in Pairs When Practicable ML19294C1931980-02-29029 February 1980 Submits Operating Rept of Tests & Experiments Conducted Mar 1979 - Mar 1980 ML19253B0261979-09-12012 September 1979 Submits Application for Renewal of License CX-22.Forwards Fsar,Eia,Revised Section 6 of Tech Specs,Emergency Plan & 790615 & 0707 Ltrs Re Emergency Procedures ML19263E3181979-06-0101 June 1979 Forwards Executed Amend 9 to Indemnity Agreement E-42 ML19270F7301979-03-0101 March 1979 Submits Rept of Tests & Experiments Conducted from 780301 to 790301.No Changes to Tech Specs & No Unreviewed Safety Questions ML20062B7501978-10-26026 October 1978 Advises That Insurance Broker Sending Advance Premium Endorsement.Indemnity Agreement Was Forwarded Earlier 1990-09-14 Category:INCOMING CORRESPONDENCE MONTHYEARML20148F0771997-05-29029 May 1997
[Table view]Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 ML18065B2651995-07-21021 July 1995 Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs ML20077R6771991-08-0808 August 1991 Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors ML20077D9561991-05-30030 May 1991 Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) ML20073P8341991-05-15015 May 1991 Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20073G8631991-04-30030 April 1991 Forwards CE Proprietary Abb Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) ML20073G8561991-04-12012 April 1991 Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility ML20070U7151991-04-0303 April 1991 Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 ML20077A4371991-03-25025 March 1991 Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) ML20059K1611990-09-14014 September 1990 Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20206Q5291987-04-15015 April 1987 Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators ML20214Q5951987-04-10010 April 1987 Forwards EGG-NTA-7660, Evaluation of Spert Fuel at Rensselaer Polytechnic Inst, Technical Evaluation Rept Submitted as Part of Task 3 ML20207S2931987-03-12012 March 1987 Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code ML20212N3841987-03-0303 March 1987 Forwards Response to 870106 Request for Addl Info Re 861003 Proposal to Convert Reactor Critical Facility Core to Use Low Enrichment U Fuel ML20212C5821987-02-24024 February 1987 Notifies of Application of 10CFR55.31(e) to Senior Reactor Operators Licenses During Rensselaer Polytechnic Inst Highly Enriched U/Low Enriched U Core Conversion Process,Per Telcons.Listed Tasks Underway ML20212F9701986-12-23023 December 1986 Forwards Security Plan Documenting Physical & Procedural Measures to Prevent Theft of Reactor Fuel & Sabotage to Critical Facility.Plan Withheld (Ref 10CFR2.790(d) & 73.21(a)) ML20215C1481986-10-0303 October 1986 Requests Permission for Conversion of Core to Low Enriched U Fuel & Continued Operation Per Encls.Conversion Specifics Discussed ML20210H2671986-09-22022 September 1986 Advises That Fr Vera New Supervisor of Facility ML20209F5571986-08-22022 August 1986 Forwards Description of Upgraded Physical Security Sys, Including Infrared Motion Sensors & New Control Panel.W/O Encl ML20141F9231986-04-17017 April 1986 Forwards 860317 Annual Rept Ltr to Region I,Containing Addl Info Missing from 860317 Rept Ltr to Div of Licensing,Per 860414 Telcon Request ML20138N9031985-10-18018 October 1985 Forwards Answer & Consent to Commission Order to Show Cause ML20101U3981985-01-31031 January 1985 Advises That Emergency Plan for License CX-22,submitted on 841205 & Approved by NRC ,Fully Implemented ML20100L9041984-12-0505 December 1984 Forwards Proposed Emergency Plan for License CX-22 Dtd Dec 1984,superseding Proposed Emergency Plan Dtd Sept 1984. Emergency Planning Zone in Section 6 Changed to Outside Reactor Room But Inside Bldg ML20093F7711984-09-28028 September 1984 Forwards Proposed Emergency Plan, in Response to 840730 Request for Addl Info & IE Info Notice 83-66,Suppl 1.Plan Provides Addl Info in Sections 3.5 & 3.6 Re Emergency Action Levels & Emergency Planning Zones,Respectively ML20082L5631983-11-18018 November 1983 Forwards Financial Rept for Yrs Ending June 1982 & June 1983 ML20078L0891983-10-13013 October 1983 Forwards Ltr to Replace Re Tech Specs.Original Ltr Missing Signatures ML20078L1011983-10-12012 October 1983 Forwards Amended Tech Specs.W/O Encls ML20080J3471983-09-21021 September 1983 Forwards Responses to 830726 Questions from Review of Documentation Submitted in Support of Application for License Renewal ML20023C5991983-04-26026 April 1983 Forwards Revised Physical Security Plan,Replacing 820426 Plan.Plan Withheld (Ref 10CFR2.790 & 73.21) ML20070P1561983-01-21021 January 1983 Forwards Rensselaer Polytechnic Inst Critical Facility Sar ML20028D4521983-01-13013 January 1983 Submits Public Version of Opinion That Emergency Response Plan,Already Filed,Fulfills Requirements of 10CFR50.54.If Mods Necessary,Response Will Be Provided ML20052B4161982-04-26026 April 1982 Forwards Physical Security Plan Replacing Plan Submitted on 820326.Plan Withheld (Ref 10CFR2.790) ML20050B8631982-03-26026 March 1982 Forwards Physical Security Plan,Per 810302 Ltr.Plan Withheld (Ref 10CFR2.790) ML20049K0371982-03-0101 March 1982 Submits Annual Operating Rept of Activities & Experiments for License CX-22,Mar 1981-Mar 1982 ML20040G3291982-02-0808 February 1982 Informs That RPI Critical Facility Has Less than 5,000 G U-235 on Site,In Response to 820115 Telcon.Change Represents Amended Condition for Current OL & Application for Renewal ML20040F2621982-01-12012 January 1982 Responds to NRC 811104 Ltr Re Violations Noted in IE Insp Rept 50-225/81-01.Corrective Actions:New Critical Facility Supervisor Reviewed Operating Procedures ML20003D2091981-03-0101 March 1981 Submits Annual Rept of Tests & Experiments for 800301- 810301.Facility Was Utilized for Graduate Course on Reactor Experiments,Summer Course on Reactor Design & Project Work to Satisfy Degree Requirements ML19331D3201980-08-22022 August 1980 Forwards Critical Experiments Facility Security Plan.Plan Withheld (Ref 10CFR2.790).Telcon W/P Trimble Informed of Shipment of Excess SNM to Oak Ridge,Tn ML19309F6701980-03-28028 March 1980 Responds to NRC 800310 Ltr Re Violations Noted in IE Insp Rept 50-225/80-01.Corrective Actions:Personnel Monitoring Procedure Revised & TLD Records Now Computerized ML19323B3791980-03-27027 March 1980 Responds to NRC 800307 Ltr Re Violations Noted in IE Insp Rept 50-225/80-02.Corrective Actions:Telephone Extension Installed in Control Room.Students Instructed to Work in Pairs When Practicable ML19294C1931980-02-29029 February 1980 Submits Operating Rept of Tests & Experiments Conducted Mar 1979 - Mar 1980 ML19253B0261979-09-12012 September 1979 Submits Application for Renewal of License CX-22.Forwards Fsar,Eia,Revised Section 6 of Tech Specs,Emergency Plan & 790615 & 0707 Ltrs Re Emergency Procedures 1997-05-29 |
Text
"
' Department of Nuclear Engineer r%
s i t Rensselaer Polytechnic Institute Troy, New York 12180-3590 i
December 5,1984 Mr. Cecil 0. Thomas, Chief Standardization and Special Projects Branch Division of Licensing United States Nuclear Regulatory Commission Washington, D. C. 20555
Subject:
Emergency Plan License No. CX-22
Dear Mr. Thomas:
The enclosed Proposed Emergency Plan CX-22 dated December 1984 supersedes the Proposed Emergency Plan CX-22 dated September and which was transmitted to you by a September 28 letter.
The enclosed responds to review comments by Ms. Rosemary Hogan that were com-municated by a December 3,1984 phone conversation with Wicks. Specifically the emergency planning in zone in Section 6 and Figure A-1 has been changed to "outside the reactor room but inside building".
Sincerely, M TM Dr. F:ank Wicks, Supervisor Dr. Donald R. Harris, Director R.P.I. Critical Reactor 3 i
FW:mb '
Enclosure b
r A
04h '
1 A h o h g5 k
.