Submits Annual Rept of Tests & Experiments for 800301- 810301.Facility Was Utilized for Graduate Course on Reactor Experiments,Summer Course on Reactor Design & Project Work to Satisfy Degree Requirements
ML20003D209
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 03/01/1981
From: Nelson P
RENSSELAER POLYTECHNIC INSTITUTE, TROY, NY
To:
Office of Nuclear Reactor Regulation
References
NUDOCS 8103190572
Download: ML20003D209 (2)


Text

-. - .--

_i' r

" Dzpartmcnt of Nucletr Enginsering O%

Rensselaer Polytechnic Institute Troy, New York 12181

.lbrch 1, 1981' Director

- Division of Reactor Licensing

,,{- ,

Qf

.U.S. Nuclear Regulatory Commission

> %%%h

'.,T/ N~IQ Washington, DC 20545 j']

S\ h(Qf %" %

J.D /M

. Re: Rensselaer Polytechnic Institute Q6 Y# ,O,,

Facility License CX-22 Docket-50-225 D # '

Report of Tests and Experiments y ,

~,.

Dear Sir:

This' report of tests and experiments-is , submitted, in accordance with Title 10 of the Code of Federal Regulations Part 50.59, for the period lbrch 1,1980 to March 1, 1981.

'The fuel plates used comprised a core loading of 152 MTR type, flat, stationary j.

. plates and 24 MTR type flat, control rod plates. Ten stationary and 2 control rod plates are stored in the fuel vault.. All of the fuel plates are leased by the U.S. Department of Energy under contract DE-AC02-76ER03457.

Through periods March 1, 1980 to April 23, 1980 and July'7, 1980 to August.13,

'1980 the Facility was used to conduct a graduate level course on reactor experi-

.ments for classes of 12 and 7 students respectively. The Facility was also used-for two days as.part of the Rensselaer Polytechnic Institute's summer course-for-industry on reactor. design.. Further, three students were involved in project ,

work at the Facility to: satisfy. degree requirements. The reactor experiments course is currently being taught and three students are working on projects (two

-masters and one senior project).

.' Routine scheduled maintenance was performed in June, January and February.

~

Two projects were completed during the report period. The core was successfully.

reconfigured within the license limits and the neutron activation analysis

.. project was completed.

070 S

I O.

810.819.06 W -

k

t-The experimants, operations, and topics covered in association with the use of the facility remain the same as described in previous reports.

- All-activities and experiments have been conducted in accordance with our NRC reactor license CX-22. There have been no changes to our Technical Specifications and our activities did not involve any unreviewed safety questions.

Sincerely yours,

.I ..

\

'ji\h i $6.71 Peter R. Nelson,. Supervisor RPI Critical Experiments Facility L. David Walthousen Laboratory mam cc: 'D. R. Harris R. T. Lahey, Jr.

R. E. Scammell t

e 1