MONTHYEARML20236S4451998-07-20020 July 1998 Forwards Copy of Recently Approved Regulation in Fr Which Permits Colleges & Univs to self-guarantee Decommissioning Costs If Certain Criteria Are Met.Requests Provision of Criterion to Be Used If School Decides to self-guarantee ML20217H6461998-04-28028 April 1998 Forwards Insp Rept 50-225/98-201 on 980407-10.No Violations Noted ML20217H4111997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20148F0771997-05-29029 May 1997 Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 ML20135C0821997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20133D0691996-12-26026 December 1996 Forwards Initial Exam Rept 50-225/OL-96-01 on 961119, Administered to Employee Who Applied for License to Operate Licensee Reactor,& Exam & Answer Key.W/O Encl ML20133A4721996-12-26026 December 1996 Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl ML18065B2651995-07-21021 July 1995 Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs ML20058E4681993-11-26026 November 1993 Forwards Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-04.No Violations Noted ML20059J1231993-11-0303 November 1993 Discusses Telcon Arrangements Made for Administration of Operator Licensing Exam.Written & Operating Exams Scheduled for Wk of 940110 ML20044E1201993-04-16016 April 1993 Requests Clarification That NRC Requalification Exam Scheduled for 930225,will Not Be Taken,Renewing NRC License Will Not Be Requested & That License Will Expire on Expiration Date ML20044F6631992-02-0606 February 1992 Forwards SO License Certificate for Dk Hayes & Extends Congratulations.W/O Encl ML20092C8061991-08-16016 August 1991 Advises of Licensee Plans to Double Storage Capacity of Fuel Vault ML20077R6771991-08-0808 August 1991 Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors ML20077D9561991-05-30030 May 1991 Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) ML20073P8341991-05-15015 May 1991 Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20073G8631991-04-30030 April 1991 Forwards CE Proprietary ABB Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) ML20073G8561991-04-12012 April 1991 Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility ML20070U7151991-04-0303 April 1991 Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 ML20077A4371991-03-25025 March 1991 Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) ML20059K1611990-09-14014 September 1990 Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20006D6441990-01-0505 January 1990 Forwards Revised NRC Forms 398 & 396 Re Personal Qualifications Statement & Certification of Medical Exam by Facility Licensee,Respectively.All Applications for Licenses to Be Submitted on Revised Forms by 900201 ML20005E1171989-12-27027 December 1989 Forwards Exam Rept 50-225/89-01OL on 890906-07 ML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20235F7361987-09-22022 September 1987 Ack Reciept of 870811 Comments on Changes to Reactor Staffing at Rensselaer Polytechnic Inst Critical Experiment Reactor Facility.Conversion Granted ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) 1998-07-20
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236S4451998-07-20020 July 1998 Forwards Copy of Recently Approved Regulation in Fr Which Permits Colleges & Univs to self-guarantee Decommissioning Costs If Certain Criteria Are Met.Requests Provision of Criterion to Be Used If School Decides to self-guarantee ML20217H6461998-04-28028 April 1998 Forwards Insp Rept 50-225/98-201 on 980407-10.No Violations Noted ML20217H4111997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20135C0821997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20133D0691996-12-26026 December 1996 Forwards Initial Exam Rept 50-225/OL-96-01 on 961119, Administered to Employee Who Applied for License to Operate Licensee Reactor,& Exam & Answer Key.W/O Encl ML20133A4721996-12-26026 December 1996 Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl ML20058E4681993-11-26026 November 1993 Forwards Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-04.No Violations Noted ML20059J1231993-11-0303 November 1993 Discusses Telcon Arrangements Made for Administration of Operator Licensing Exam.Written & Operating Exams Scheduled for Wk of 940110 ML20044E1201993-04-16016 April 1993 Requests Clarification That NRC Requalification Exam Scheduled for 930225,will Not Be Taken,Renewing NRC License Will Not Be Requested & That License Will Expire on Expiration Date ML20044F6631992-02-0606 February 1992 Forwards SO License Certificate for Dk Hayes & Extends Congratulations.W/O Encl ML20006D6441990-01-0505 January 1990 Forwards Revised NRC Forms 398 & 396 Re Personal Qualifications Statement & Certification of Medical Exam by Facility Licensee,Respectively.All Applications for Licenses to Be Submitted on Revised Forms by 900201 ML20005E1171989-12-27027 December 1989 Forwards Exam Rept 50-225/89-01OL on 890906-07 ML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235F7361987-09-22022 September 1987 Ack Reciept of 870811 Comments on Changes to Reactor Staffing at Rensselaer Polytechnic Inst Critical Experiment Reactor Facility.Conversion Granted ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) ML20205T5541987-03-31031 March 1987 Advises That 870205 Rev to Security Plan Will Be Reviewed w/861223 Security Plan.Headquarters Will Respond Re Rev ML20211Q9501987-02-0606 February 1987 Advises That Jan 1987 Rev to Security Plan Has Potential for Policy Implications.Rev Referred to Headquarter Staff for Review.Headquarters Staff Will Provide Response ML20207M5321987-01-0606 January 1987 Forwards Request for Addl Info Re 861003 Proposal to Convert Reactor Core to Low Enriched U Fuel.Requests Response within 30 Days of Ltr Date ML20214R9341986-12-0101 December 1986 Forwards Amend 6 to License CX-22 & Safety Evaluation.Amend Authorizes Receipt & Possession of 600 Unirradiated Spert (F-1) Fuel Pins Containing 21.12 Kg U-235 & Allows Each Storage Tube to Contain 15 Spert Fuel Pins at One Time ML20215B9321986-09-30030 September 1986 Responds to Tansmitting Info Re Proposed Changes for Further Upgrades to Physical Security Sys.Formal Submittal of Physical Security Plan Revs Required within 60 Days of Implementation of Changes.Record Copy ML20210U4491986-09-30030 September 1986 Responds to Tansmitting Info Re Proposed Changes for Further Upgrades to Physical Security Sys.Formal Submittal of Physical Security Plan Revs Required within 60 Days of Implementation of Changes ML20202F3951986-07-10010 July 1986 Forwards Safeguards Insp Repts 50-225/86-01 & 70-0920/86-01 on 860304-07 & Notice of Violation.Corrections of Violations Noted in NRC Verified.Violation E in Encl Notice of Violation Corrected ML20141A0541986-03-27027 March 1986 Advises That TC Elsasser Will Replace EC Mccabe as Section Chief for Facility,Effective on 860331,based as Realignment of Projects within Region I Ofc ML20140F3361986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20140E7811986-03-20020 March 1986 Discusses Licensee Transport of Shipment of Spent Fuel on 860127 W/Qa Program for Radiation Matl Packages Which Expired on 851231.Research & Test Reactor Licensees Should Be Aware of Expiration Dates & Take Appropriate Action ML20154M7091986-03-10010 March 1986 Confirms 860123 Discussion Re Application for Conversion of Critical Facility to Low Enriched U Fuel.Request Will Be Processed as Amend W/Significant Hazards Determination & Will Be Prenoticed in Fr ML20137L7011985-11-26026 November 1985 Forwards Safety Insp Rept 50-225/85-03 on 851008-09.No Violation Noted.Development of Guidance for Maint of Licensed Operator Qualification Required ML20137P4381985-09-0606 September 1985 Forwards Exam Rept 50-225/OL-85-02 of Exam Administered During Wk of 850722 ML20134L6471985-08-29029 August 1985 Forwards Safety Insp Rept 50-225/85-01 on 850708-09.No Violation Noted ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20032C4281981-11-0404 November 1981 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-225/81-01. Extensive Review of Current Operating Procedures to Be Performed Before 811231 Per 810922 Telcon ML20031F9101981-10-0202 October 1981 Forwards IE Insp Repts 50-225/81-04 & 70-0920/81-02 on 810908-11.No Noncompliance Noted ML20010B1981981-07-31031 July 1981 Forwards IE Insp Rept 50-225/81-03 on 810701-02.No Noncompliance Noted ML20010D0331981-07-31031 July 1981 Forwards IE Info Notice 81-22, Section 235 & 236 Amends to Atomic Energy Act of 1954. No Response Required 1998-07-20
[Table view] |
Text
F9cu E
Di i E UNITED STATES l
g%g.....,/
e E
NUCLEAR REGULATORY COMMISSION
'p' wasmuorou, o.c. mssam liOV 0 31993 Docket No. 50-225 Dr. Donald R. Harris, Director Critical Facility J
Department of Nuclear Engineering i
and Science Rensselaer Polytechnic Institute Troy, New York 12181
Dear Dr. Harris:
In a telephone conversation between Mr. Warren Eresian and Mr. Sean Bucher arrangements were made for the administration of operator licensing examinations at the Rensselaer Polytechnic Institute reactor. The written and operating examinations are scheduled for the week of January 10, 1994.
In order for us to meet this schedule, please furnish two sets of the reference material listed in Enclosure 1, as applicable, " Reference Material for Reactor / Senior Reactor Operator Licensing Examinations" at least 60 days prior to the examination date to the following address:
1 U. S. Nuclear Regulatory Commission Washington, D.C.
20555 ATTN: James L. Caldwell, Mail Stop 10/D/22 l
You are responsible for providing adequate space and accommodations in order to prope-ly conduct the written examinations., " Administration of Written Examinations," describes our process for conducting these examinations.
i contains the Rules and Guidelines that will be in effect during i
the administration of the written examination. Please ensure that all i
applicants are aware of these rules.
1 Your review of the written examination will be conducted in accordance with the procedures specified in Enclosure 4, " Facility Review of Written Examinations."
Preliminary reactor operator and senior reactor operator license applications should be submitted at least 30 days before the first examination dates so that we will be able to review the training and experience of the candidates, process the medical certifications, and prepare final examiner assignments after applicant eligibility has been determined. Final signed applications certifying that all training has been completed must be submitted at least 14 days before the examination date in order to process the license application.
If our review cannot be completed in time to make a determination of applicant eligibility, the candidate may not be permitted to sit for the examination.
Therefore, it is recommended that license applications be provided as soon as possible to ensure an appropriate level of review.
%h 5
y i
i i
1,.
NOV 0 3 1993
)
i Dr. Harris,
This request is covered by Office of Management and Budget (OMB) Clearance j
Number 3150-0101, which expires October 31, 1995. This estimatcd average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Information and Records Management Branch, MNBB-i 7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555; and to the Paperwork Reduction Project (3150-0101), Office of i
Information and Regulatory Affairs, NE0B-3019, Office of Management and Budget, Washington, D.C. 20503.
If you have any questions regarding the examination procedures and requirements, please contact Mr. James L. Caldwell at (301) 504-1042.
J Sincerely, l
lSl t
James L. Caldwell, Chief Nonpower Reactor Section Operator Licensing Branch Division of Reactor Controls and Human Factors i
Office of Nuclear Reactor Regulation
Enclosures:
1.
Reference Material for i
Reactor / Senior Reactor Operator Licensing Examinations 2.
Administration of Written Examinations i
3.
Procedures for Administration of Written Examinations 4.
Facility Review of Written Examinations cc w/encls:
l Sean Bucher, Reactor Supervisor DISTRIBUTION:
RGallo JCaldwell TCentral Filesi PDR/LPDR Docket Files Facility File (DMcCain)
WEresian, OLB Examiner i
TMichaels, PM f
OL CH OLB. R WEre n
7 dwell
// /3 3
' / /93 l
NOV 0 31993 I
Dr. Harris,
This request is covered by Office of Management and Budget (OMB) Clearance Number 3150-0101, which expires October 31, 1995. This estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per response, including gathering, xeroxing and mailing the required material. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for i
reducing this burden, to the Information and Records Management Branch, MNBB-7714, Division of Information Support Services, Office of Information Resources Management, U.S. Nuclear Regulatory Commission, Washington, D.C.
20555; and to the Paperwork Reduction Project (3150-0101), Office of Information and Regulatory Affairs, NE08-3019, Office of Management and i
Budget, Washington, D.C. 20503.
If you have any questions regarding the examination procedures and j
requirements, please contact Mr. James L. Caldwell at (301) 504-1042.
Sincerely,
)
I ISl James L. Caldwell, Chief Nonpower Reactor Section Operator Licensing Branch Division of Reactor Controls and Human Factors l
Office of Nuclear Reactor Regulation
Enclosures:
1.
Reference Material for Reactor / Senior Reactor Operator Licensing Examinations 2.
Administration of Written Examinations 3.
Procedures for Administration of Written Examinations 4.
Facility Review of Written Examinations cc w/encls:
Sean Bucher, Reactor Supervisor DISTRIBUTION:
RGallo JCaldwell
+ Central ~ Files '
PDR/LPDR Docket Files Facility File (DMcCain)
WEresian, OLB Examiner TMichaels, PM f
OL fCH OLB. R WEre n
Well t[/3 3
/ /93 e
s,-
n-e a-
,ar--
ENCLOSURE 1 l
REFERENCE VTERIAL FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS (NON-POWER) i 1.
Existing learning objectives, students handouts and lesson plans (including training manuals, plant orientation manual, system l
l descriptions, reactor theory, thermodynamics, etc.)
i Training materials should include all substantive written material used for preparing applicants for initial R0 and SRO licensing. The written l
material should include learning objectives if available and the details presented during lectures, rather than outlines. Training materials i
should be identified, bound, and indexed. Training materials which include the following should be provided:
l System descriptions including descriptions of all operationally l
relevant flow paths, components, controls and instrumentation.
i System training material should draw parallels to the actual procedures used for operating and applicable system.
Complete and operationally useful descriptions of all safety-system interactions, secondary interactions under emergency and i
l abnormal conditions, including consequences of anticipated j
l operator error, maintenance error, and equipment failure.
i Training material used to clarify and strengthen understanding of emergency operating procedures.
2.
Complete procedure Index (including temporary procedures).
l 3.
All administrative procedures as applicable to reactor operation or i
safety.
4.
All integrated plant procedures, normal or general operating procedures and procedures for experiments.
5.
All emergency procedures, emergency instructions, abnormal or special l
procedures.
6.
Standing orders or procedures changed by reactor supervision and important orders or changes that are safety related and may supersede the regular procedures.
7.
Applicable procedures (procedures that are run frequently).
8.
Fuel-handling and core-loading procedures and initial core-loading procedure, when appropriate.
9.
Any annunciator / alarm procedures, as applicable.
j 10.
Radiation protection manual, radiation control manual or procedures.
11.
Emergency plan implementing procedures.
l
f k (Continued) '
12.
Safety Analysis Report, Technical Specifications and interpretations, if available.
13.
System operating procedures, including experiments.
1 I
14.
Piping and instrumentation diagrams, electrical single-line diagrams, or i
flow diagrams, as applicable.
15.
Technical Data Book, and/or plant curve information as used by operators and facility precautions, limitations, and set points for the facility.
16.
Questions and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by I
1 facility licensee).
i 1
17.
Additional material as requested by the examiners to develop i
examinations that meet the requirements of the Non-power Reactor Examiner Standards and Regulations.
The above reference material should be approved final issues and so marked.
t If a facility has not finalized some of the material, the Chief Examiner-should verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for limiting changes before the administration of the examination.
ii I
J
b i
t ENCLOSURE 2 l
ADMINISTRATION OF WRITTEN EXAMINATIONS 1.
A single room must be provided for administration of the written examination. The location of this room and supporting restroom facilities should be such as to prevent contact with all other facility personnel during the written examination.
j 2.
Minimum spacing is necessary to ensure examination integrity as determined by the Chief Examiner (i.e., one applicant per table, with a three-foot space between tables).
j 3.
Acceptable arrangements should be made by the facility if the applicants are to have lunch, coffee or other refreshments. These arrangements shall comply with Item I above and must be reviewed by the examiner and/or proctor, j
4.
The facility licensee provides pads of 81/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the r
examination. The examiner distributes these pads to the applicants as needed.
j 5.
Applicants may bring pens, pencils, calculators or slide rules into the examination room. Only black ink or dark pencils should be used for l
writing answers to questions.
6.
No wall charts, models, and/or other training materials can be present l
in the examination room. No other equipment or reference material will be allowed unless provided by the examiner.
j 7.
The facility staff is provided with a copy of the written examination and answer key after the last candidate has handed in his written examination. The facility staff will then have five (5) working days to provide formal written comments with supporting documentation regarding written examination questions and answers to the Chief Examiner.
i
1 ENCLOSURE 3 PROCEDURES FOR THE ADMINISTRATION OF WRITTEN EXAMINATIONS l
f 1.
Verify candidate identity.
I 2.
Pass out examinations and all handouts. Remind applicants not to review examination until instructed to do so.
+
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
i 1.
Cheating on the examination means an automatic denial of your application and could result in more severe penalties.
2.
After the examination has been completed, you must sign the statement on the cover sheet indicating that the work is your own and you have not received or given assistance in completing the examination. This must be done after you complete the examination.
l READ THE FOLLOWING INSTRUCTIONS:
1.
Restroom trips are to be limited and only one applicant at a time may i
leave. You must avoid all contact with anyone (_tside the examination room to avoid even the appearance or possibility of cheating.
2.
Use black ink or dark pencil 2nly to facilitate legible reproductions.
3.
Print your name in the blank provided in the upper right-hand corner of the examination cover sheet and each answer sheet.
4.
Mark your answers on the answer sheet provided.
USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
5.
Before you turn in your examination, consecutively number each answer sheet.
6.
The point value for each question is indicated in [ brackets] after the question.
7.
If the intent of a question is unclear, ask questions of the examiner only.
8.
When turning in your examination, assemble the completed examination with examination questions, examination aids and answer sheets.
In addition, turn in all scrap paper.
9.
Ensure all information you wish to have evaluated as part of your answer is on your answer sheet. Scrap paper will be disposed of immediately following the examination.
i
' ~
t i
_q' (Continued) l l
l 1
10.
To pass the examination, you must achieve a grade of 70 percent or greater in each category.
11.
There is a time limit of three (3) hours for completion of the examination.
i 12.
When you have completed and turned _in your examination, leave the examination area (DEFINE THE AREA).
If you are observed in this area while the examination is still in progress, your license may be denied or revoked.
l I
f t
1 l
j 4
fl i
d j
1 i
e 4
i t
_, _. _ _... _.. - -. _ _ _ _ _. _. -. ~ _..
9 c
I ENCLOSURE 4 i
FACILITY REVIEW OF WRITTEN EXAMINATIONS 1.
At the option of the Chief, Non-Power Reactor (NPR) Section, Operator Licensing Branch (OLB), the facility may review the written examination up to two weeks prior to its administration. This review may take place at the facility or in the OLB office. The Chief Examiner will coordinate the details of the review with the faci ~.ity.
An NRC examiner l
will always be present during the review. The examination or written notes will HQI be retained by the facility.
l Whenever this option of examination review is utilized, the facility reviewers will sign the following statement prior to being allowed access to the examination.
a.
Pre-Examination Security Agreement I
acknowledge that I have acquired specialized knowledge concerning the examination scheduled for at as of the date of my signature below.
I agree that I will not knowingly divulge any information concerning this examination to any unauthorized persons.
I understand that I am not to participate in any instruction involving those applicants scheduled to be i
administered the above examination from this date until after the examination has been administered.
I further understand that violation of the conditions of this agreement may result in the examinations being cancelled and/or enforcement action against myself or the facility licensee by whom I am employed or represent.
I f
i Signature /Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered.
b.
Post-Examination Security Agreement I
did not, to the best of my knowledge, divulge any information concerning the examinations administered during the week of at or any instruction to those applicants who were administered the examination from the date I entered into this security agreement until the completion of examination administration.
4 1
Signature /Date 2
4 l
i
~..
l 1 (Continued) l 2.
Regardless of whether the above examination review option is exercised, imediately following the administration of the written examination, the facility staff is provided a marked-up copy of the examination and the answer key. The copy of the written examination includes pen and ink changes made to questions during the examination administration.
If the facility did not review the examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal comments.
If the facility reviewed the examination prior to its administration, any additional coments i
must be given to an examiner prior to his/her leaving the facility.
l These coments will be addressed to the OLB by the Reactor Supervisor.
l A copy of the submittal will be forwarded to the Chief Examiner, as appropriate. Coments not submitted within the required time frame will be considered for inclusion in the grading process on a case-by-case l
basis by the NPR Section Chief. This may cause delays in grading the examinations.
3.
The following format should be used for submittal of specific comments:
a.
Listing of NRC question, answer and reference b.
Facility coment/recomendation c.
Reference (to support facility coment)
NOTES:
1.
No change to the examination will be made without submittal of a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.
l 2.
Coments made without a concise facility recommendation will not be addres:;ed.
4.
A two-hour post examination review may be held at the discretion of the Chief Examiner.
If this review is held, the facility staff should be informed that only written coments that are properly supported will be considered in the grading of the examination.