Category:CORRESPONDENCE-LETTERS
MONTHYEARML20236S4451998-07-20020 July 1998 Forwards Copy of Recently Approved Regulation in Fr Which Permits Colleges & Univs to self-guarantee Decommissioning Costs If Certain Criteria Are Met.Requests Provision of Criterion to Be Used If School Decides to self-guarantee ML20217H6461998-04-28028 April 1998 Forwards Insp Rept 50-225/98-201 on 980407-10.No Violations Noted ML20217H4111997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20148F0771997-05-29029 May 1997 Informs That Bs Craig Replaced Mn Galayda as Supervisor of RPI Reactor Critical Facility on 970516 ML20135C0821997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20133A4721996-12-26026 December 1996 Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl ML20133D0691996-12-26026 December 1996 Forwards Initial Exam Rept 50-225/OL-96-01 on 961119, Administered to Employee Who Applied for License to Operate Licensee Reactor,& Exam & Answer Key.W/O Encl ML18065B2651995-07-21021 July 1995 Informs of 950711 Conversation W/S Holmes Re Change & Temporary Reduction in Radiation Safety Staffing within Past Yrs ML20058E4681993-11-26026 November 1993 Forwards Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-04.No Violations Noted ML20059J1231993-11-0303 November 1993 Discusses Telcon Arrangements Made for Administration of Operator Licensing Exam.Written & Operating Exams Scheduled for Wk of 940110 ML20092C8061991-08-16016 August 1991 Advises of Licensee Plans to Double Storage Capacity of Fuel Vault ML20077R6771991-08-0808 August 1991 Submits Results of Boric Acid Experiments on Known Core,Per Discussions W/Nrc & Univ Nuclear Safety Review Board.State Point Measurements Made Before & After Boric Acid Addition Agreed within Specified Reproducibility Errors ML20077D9561991-05-30030 May 1991 Forwards Corrected Affidavit for Withholding Supporting Matl to License Amend for RCF Critical CX-22 Facility (Ref 10CFR2.790) ML20073P8341991-05-15015 May 1991 Forwards Abb Cenp Critical Experiments in Reactor Critical Facility of Rpi ML20073G8631991-04-30030 April 1991 Forwards CE Proprietary Abb Cenp Critical Experiments in Reactor Critical Facility of Rensselaer Polytechnic Inst. Encl Withheld (Ref 10CFR2.790) ML20073G8561991-04-12012 April 1991 Forwards Addendum to Which Transmitted Presentation of Technical Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Absorbers at Facility ML20070U7151991-04-0303 April 1991 Submits Decommissioning Rept,Per 10CFR50.33(k)(2),in Response to T Michaels .Assets W/Listed Market Value Deposited in Bank of New York in Mar 1991 ML20077A4371991-03-25025 March 1991 Forwards Info Re Calculation & Measurement of Tech Spec Parameters for Erbium Burnable Adsorbers at Univ Reactor Criticality Facility Developed by C-E.Info Withheld (Ref 10CFR2.790) ML20059K1611990-09-14014 September 1990 Forwards Completed Compliance Rept Re Decommissioning of Reactor,Per 900726 Request ML20059K1701990-09-13013 September 1990 Submits Decommissioning Funding Rept,Per 10CFR50.75(e)(2) ML20055H9501990-07-26026 July 1990 Advises That Submittal Re Decommissioning & Financial Assurance Will Be Sent in mid-Sept 1990 ML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20247J1971989-05-22022 May 1989 Submits Annual Rept of Operations at RPI Reactor Critical Facility Required Under Tech Spec 6.5.1 ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20235V7871989-02-17017 February 1989 Forwards Memo Describing Incident Which Occurred at Reactor Critical Facility.Understands That Incident Does Not Require Immediate Notification to NRC ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20246K9431988-09-16016 September 1988 Forwards BC Drobnicki Memo,Revising Memo Communicated to NRC on 880816.Encl Withheld (Ref 10CFR2.790(d)) ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20235F7361987-09-22022 September 1987 Ack Reciept of 870811 Comments on Changes to Reactor Staffing at Rensselaer Polytechnic Inst Critical Experiment Reactor Facility.Conversion Granted ML20234C0041987-09-10010 September 1987 Summarizes 870909 Discussion Re F Wicks Intervention Document Which Alleges That Fj Rodriguez-Vera Inappropriate Reactor Supervisor Due to Status as Student.Student Visa Permits Employment on Campus ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20215E0411987-06-12012 June 1987 Informs That Fence Mods Around Civil Protection & Security Zones of Facility Completed on 870611.Changes Return Facility to Spirit of Situation Prior to 861230 & of New Security Plan ML20215E1111987-06-0909 June 1987 Forwards Response to Comments Re Rensselear Polytechnic Inst Reactor Critical Facility Security Plan Dtd Jan 1987. W/O Encl ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) ML20206Q5291987-04-15015 April 1987 Forwards Reactor Operator Requalification (Ror) Program for Rensselaer Polytechnic Inst Reactor Critical Facility (Rcf). Rept Includes Section Re Requalification of Currently Licensed Senior Reactor Operators ML20214Q5951987-04-10010 April 1987 Forwards EGG-NTA-7660, Evaluation of Spert Fuel at Rensselaer Polytechnic Inst, Technical Evaluation Rept Submitted as Part of Task 3 ML20205T5541987-03-31031 March 1987 Advises That 870205 Rev to Security Plan Will Be Reviewed w/861223 Security Plan.Headquarters Will Respond Re Rev ML20207S2931987-03-12012 March 1987 Forwards Missing Pages from App 3 to Ref 5 in Addendum to 870303 Answer to Question 16 Re Difxy Computer Code 1998-07-20
[Table view] Category:NRC TO EDUCATIONAL INSTITUTION
MONTHYEARML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) ML20205T5541987-03-31031 March 1987 Advises That 870205 Rev to Security Plan Will Be Reviewed w/861223 Security Plan.Headquarters Will Respond Re Rev ML20211Q9501987-02-0606 February 1987 Advises That Jan 1987 Rev to Security Plan Has Potential for Policy Implications.Rev Referred to Headquarter Staff for Review.Headquarters Staff Will Provide Response ML20207M5321987-01-0606 January 1987 Forwards Request for Addl Info Re 861003 Proposal to Convert Reactor Core to Low Enriched U Fuel.Requests Response within 30 Days of Ltr Date ML20214R9341986-12-0101 December 1986 Forwards Amend 6 to License CX-22 & Safety Evaluation.Amend Authorizes Receipt & Possession of 600 Unirradiated Spert (F-1) Fuel Pins Containing 21.12 Kg U-235 & Allows Each Storage Tube to Contain 15 Spert Fuel Pins at One Time ML20210U4491986-09-30030 September 1986 Responds to Tansmitting Info Re Proposed Changes for Further Upgrades to Physical Security Sys.Formal Submittal of Physical Security Plan Revs Required within 60 Days of Implementation of Changes ML20202F3951986-07-10010 July 1986 Forwards Safeguards Insp Repts 50-225/86-01 & 70-0920/86-01 on 860304-07 & Notice of Violation.Corrections of Violations Noted in NRC Verified.Violation E in Encl Notice of Violation Corrected ML20141A0541986-03-27027 March 1986 Advises That TC Elsasser Will Replace EC Mccabe as Section Chief for Facility,Effective on 860331,based as Realignment of Projects within Region I Ofc ML20140F3361986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20140E7811986-03-20020 March 1986 Discusses Licensee Transport of Shipment of Spent Fuel on 860127 W/Qa Program for Radiation Matl Packages Which Expired on 851231.Research & Test Reactor Licensees Should Be Aware of Expiration Dates & Take Appropriate Action ML20154M7091986-03-10010 March 1986 Confirms 860123 Discussion Re Application for Conversion of Critical Facility to Low Enriched U Fuel.Request Will Be Processed as Amend W/Significant Hazards Determination & Will Be Prenoticed in Fr ML20137L7011985-11-26026 November 1985 Forwards Safety Insp Rept 50-225/85-03 on 851008-09.No Violation Noted.Development of Guidance for Maint of Licensed Operator Qualification Required ML20137P4381985-09-0606 September 1985 Forwards Exam Rept 50-225/OL-85-02 of Exam Administered During Wk of 850722 ML20134L6471985-08-29029 August 1985 Forwards Safety Insp Rept 50-225/85-01 on 850708-09.No Violation Noted ML20062H2861979-06-22022 June 1979 Forwards IE Info Notice 79-16, Nuclear Incident at Tmi. No Action Required 1989-07-19
[Table view] Category:OUTGOING CORRESPONDENCE
MONTHYEARML20236S4451998-07-20020 July 1998 Forwards Copy of Recently Approved Regulation in Fr Which Permits Colleges & Univs to self-guarantee Decommissioning Costs If Certain Criteria Are Met.Requests Provision of Criterion to Be Used If School Decides to self-guarantee ML20217H6461998-04-28028 April 1998 Forwards Insp Rept 50-225/98-201 on 980407-10.No Violations Noted ML20217H4111997-08-0505 August 1997 Informs That Responsibility for Non-Power Reactor Insp Program Has Been Transferred from Regional Ofc to Nrr. Addresses Listed ML20135C0821997-02-24024 February 1997 Forwards Certificate for Listed Newly Licensed Individual. W/O Encl ML20133D0691996-12-26026 December 1996 Forwards Initial Exam Rept 50-225/OL-96-01 on 961119, Administered to Employee Who Applied for License to Operate Licensee Reactor,& Exam & Answer Key.W/O Encl ML20133A4721996-12-26026 December 1996 Forwards Results of Operator Initial Exam Conducted at Rensselaer Polytech Institute on 961119.W/o Encl ML20058E4681993-11-26026 November 1993 Forwards Insp Repts 50-225/93-01 & 70-0920/93-01 on 931102-04.No Violations Noted ML20059J1231993-11-0303 November 1993 Discusses Telcon Arrangements Made for Administration of Operator Licensing Exam.Written & Operating Exams Scheduled for Wk of 940110 ML20247B2291989-07-19019 July 1989 Forwards Safety Insp Rept 50-225/89-01 on 890518-19.No Violations Noted ML20246A1571989-06-27027 June 1989 Advises That 881017 & 890309 & 0413 Changes to Physical Security Plan Consistent w/10CFR50.54(p) & Acceptable ML20246P3331989-03-22022 March 1989 Forwards Agenda for 890418-19 Research & Test Reactor Seminars in King of Prussia,Pa Per .Updated Agenda Soon to Follow.Map of Local Area Also Encl ML20247E1771989-03-21021 March 1989 Forwards Request for Ref Matl Requirements for Reactor/ Senior Reactor Operator Licensing Exams,Scheduled for 890614-15 ML20206F8061988-11-0909 November 1988 Forwards Safety Insp Rept 50-225/88-04 on 880817-18 & Notice of Violation.Violations Indicate Need for Greater Mgt Oversight of & Attention to Licensed Activities ML20154R8881988-09-28028 September 1988 Forwards Safety Insp Rept 50-225/88-03 on 880812.No Violations Noted ML20151G9851988-07-19019 July 1988 Forwards Safeguards Insp Repts 50-225/88-02 & 70-0920/88-01 on 880607-10 & Partially Withheld Notice of Violation ML20196L0361988-06-28028 June 1988 Forwards Exam Rept 50-225/88-01OL of Exam Administered During Wk of 880523.Licensee Should Describe,Within 30 Days, What Steps Will Be Taken to Assure Future License Applicants Will Possess Adequate Experience ML20150D8641988-03-18018 March 1988 Informs of Relocation of NRR to Rockville,Md.Official Mailing Address Still Remains Same & Project Managers Have New Locations & Phone Numbers.Ts Michaels Still Lead Project Manager for Facility & a Adams Will Serve as Backup IA-87-825, Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively1988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20196K1521988-03-0808 March 1988 Final Response to FOIA Request.Forwards App E Document.App E Document Also Available in Pdr.App F Document Partially Withheld & App G Document Completely Withheld (Ref FOIA Exemptions 4 & 5),respectively ML20149M6751988-02-19019 February 1988 Forwards Exam Rept 50-225/87-02(OL) of Exams Administered on 871201-02 ML20235G7921987-09-22022 September 1987 Confirms 870917 Telcon Authorizing Licensee to Proceed W/ Conversion of High to Low Enriched U ML20235F7361987-09-22022 September 1987 Ack Reciept of 870811 Comments on Changes to Reactor Staffing at Rensselaer Polytechnic Inst Critical Experiment Reactor Facility.Conversion Granted ML20238A6071987-08-31031 August 1987 Forwards Amend 8 to License CX-22 & Safety Evaluation.Amend Changes License Conditions to Reflect Approval of Revised Security Plan Submitted on 870609.Rev to Plan Reflects New Measures Used to Protect SNM of Low Strategic Significance ML20235N7951987-07-0707 July 1987 Forwards Order Modifying License CX-22 to Convert from High to Low Enriched U,Safety Evaluation,Environ Assessment & Replacement Pages for Tech Specs,In Response to 861003 Request ML20214U6461987-05-27027 May 1987 Informs of Recent Realignment within NRC Region I,Div of Reactor Projects That Affects Responsibility for Insp of Research & Test Reactor Facilities.Div Organization Chart & 10CFR50 Re Communications Procedures Amends Encl for Review ML20214K5511987-05-18018 May 1987 Forwards Insp Rept 50-225/87-01.Licenses of Two of Three Currently Licensed Operators Will Be Reactivated Upon Proper Application & Subsequently Renewed for Use W/New Core Configuration ML20213G5191987-05-13013 May 1987 Forwards Request for Addl Info Re Security Plan on Protection of SNM of Low Strategic Significance Submitted by .Encl Withheld (Ref 10CFR2.790(d)) ML20205T5541987-03-31031 March 1987 Advises That 870205 Rev to Security Plan Will Be Reviewed w/861223 Security Plan.Headquarters Will Respond Re Rev ML20211Q9501987-02-0606 February 1987 Advises That Jan 1987 Rev to Security Plan Has Potential for Policy Implications.Rev Referred to Headquarter Staff for Review.Headquarters Staff Will Provide Response ML20207M5321987-01-0606 January 1987 Forwards Request for Addl Info Re 861003 Proposal to Convert Reactor Core to Low Enriched U Fuel.Requests Response within 30 Days of Ltr Date ML20214R9341986-12-0101 December 1986 Forwards Amend 6 to License CX-22 & Safety Evaluation.Amend Authorizes Receipt & Possession of 600 Unirradiated Spert (F-1) Fuel Pins Containing 21.12 Kg U-235 & Allows Each Storage Tube to Contain 15 Spert Fuel Pins at One Time ML20215B9321986-09-30030 September 1986 Responds to Tansmitting Info Re Proposed Changes for Further Upgrades to Physical Security Sys.Formal Submittal of Physical Security Plan Revs Required within 60 Days of Implementation of Changes.Record Copy ML20210U4491986-09-30030 September 1986 Responds to Tansmitting Info Re Proposed Changes for Further Upgrades to Physical Security Sys.Formal Submittal of Physical Security Plan Revs Required within 60 Days of Implementation of Changes ML20202F3951986-07-10010 July 1986 Forwards Safeguards Insp Repts 50-225/86-01 & 70-0920/86-01 on 860304-07 & Notice of Violation.Corrections of Violations Noted in NRC Verified.Violation E in Encl Notice of Violation Corrected ML20141A0541986-03-27027 March 1986 Advises That TC Elsasser Will Replace EC Mccabe as Section Chief for Facility,Effective on 860331,based as Realignment of Projects within Region I Ofc ML20140F3361986-03-26026 March 1986 Advises of NRR Reorganization.Telephone Number of J Dosa Changed.D Tondi New Section Leader for Nonpower Reactors & Safeguards Licensing Section.Correspondence Should Be Addressed to Nrc,Attention Document Control Desk ML20140E7811986-03-20020 March 1986 Discusses Licensee Transport of Shipment of Spent Fuel on 860127 W/Qa Program for Radiation Matl Packages Which Expired on 851231.Research & Test Reactor Licensees Should Be Aware of Expiration Dates & Take Appropriate Action ML20154M7091986-03-10010 March 1986 Confirms 860123 Discussion Re Application for Conversion of Critical Facility to Low Enriched U Fuel.Request Will Be Processed as Amend W/Significant Hazards Determination & Will Be Prenoticed in Fr ML20137L7011985-11-26026 November 1985 Forwards Safety Insp Rept 50-225/85-03 on 851008-09.No Violation Noted.Development of Guidance for Maint of Licensed Operator Qualification Required ML20137P4381985-09-0606 September 1985 Forwards Exam Rept 50-225/OL-85-02 of Exam Administered During Wk of 850722 ML20134L6471985-08-29029 August 1985 Forwards Safety Insp Rept 50-225/85-01 on 850708-09.No Violation Noted ML20129E9971985-05-0909 May 1985 Responds to FOIA Request for Compilations of Results of Operator Licensing & Requalification Exams.App a Documents Placed in Pdr.App B Documents Already in PDR ML20149K1911980-05-0707 May 1980 Generic Ltr 80-38 to All Nonpower Reactor Licensees Re NPR Physical Protection Requirements.Summary of Certain NPR Physical Protection Requirements Encl & Should Aid in Determining Safeguards Requirements Applicable to Facility ML20062H2861979-06-22022 June 1979 Forwards IE Info Notice 79-16, Nuclear Incident at Tmi. No Action Required 1998-07-20
[Table view] |
Text
. _-_ __
March 21, 1989 Docket No. 50-225 Rensselaer Polytechnic Institute ATTN: Dr. Robert C. Block, Chairman Dept. Nuclear Engineering and Physics NES 1-9 Troy, New York 12180 Gentlemen:
SUBJECT:
SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Dr. D. Harris, Director, and Mr. D. Silk, Examiner, arrangements were made for the administration of licensing examinations at the Rensselaer Polytechnic Institute.
The written examinations are scheduled for June 13, 1989. The operating examinations are scheduled for June 14-15, 1989.
To meet the' above schedule, it will be neces sa ry for you to furnish the 1 reference material listed in Enclosure 1, " Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations," by the week of April 10, 1989. Any delay in receiving approved, properly bound and indexed reference material, or the submittal of inadequate or incomplete reference material may result in the examination being rescheduled. Dr. Harris has been advised of our reference ~ material requirements, and the address where each set is to be mailed.
You are responsible for providing adequate space and accommodations for administration of the written examinations. Enclosure 2, " Requirements for Administration of Written Examination," describes our requirements for conducting these examinations.
Enclosure 3 contains the Rules and Guidelines that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all applicants are aware of these rules.
The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 4, " Requirements for Facility Review of Written Examinations."
,/ /
,V Ik 0FFICIAL RECORD COPY RENSSELACR POLYTECHNIC - 0001.0.0I 03/13/89 8903310320 PDR 890321 ADOCK 05000225 PDC __ c
Rensselaer Polytechnic Institute All completed- reactor ~ operater- and senior reactor operato r. license applications should be submitted at least 30 days before the first examination
-dates so that we will be able to review the training and experience of the candidates, process .the medical certifications, and prepare. final examiner
-assignments after applicant eligibility has- been. determined.
If .the applications are not. received at least 30 days before the examination dates, it is likely. that a postponement will be necessary.
Dr. Harris has been informed of the above requirements.
This request 'is covered by Office of Management an'd Budget Clearance Number 3150-0101' which expires May 31, 1989. .The estimated average burden is 7.7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> per . response, including gathering, xeroxing and mailing the required material. Comments on.the accuracy of this estimate and suggestions to reduce the~ burden may be directed. to the Office Of Management and Budget, Paperwork
. Reduction Project 3150-0101), Room ~ 3208, New Executive Office Building, Washington' D.C. -20503, and the U.S. Nuclear Regulatory Commission, Records and Reports Management Branch, Office of Information Resources- Management, Washington, D.C. 20555.
Thank you for your consideration in this matter.. If you have any questions-regarding the examination procedures and requirements, please contact me at (215) 337-5211.
Sincerely, l
PETER W. ESELGROTH Peter W. Eselgroth, Chief PWR Section
' Operations Branch Division of Reactor Safety
Enclosures:
- 1. ' Reference Material Requirements for Reactor / Senior Reactor Operator Licensing Examinations
- 2. Requirements for Administration of Written Examinations
- 3. NRC Rules and Guidelines for Written Examinations
- 4. Requirements for Facility Review of Written Examinations
- - - - , _ _ -x__a_------- _ _ - . _ _ - _ - - - - _ - - _ - - _ _ - - - - - _ - - . - -
. Ren'sselaer Polytechnic Insti;ute cc w/ enclosures:
Dr. Harris, Facility Director P. Angelo, Supervisor bec w/ enclosures:
D. Haverkamp, DRP Section Chief
- 0. Silk, Chief Examiner OL Facility File l RI:DRS Sig RJ.[th 3/ZD/89 3/20/89 l
OFFICIAL RECORD COPY I
f
)
M _..
l
' ENCLOSURE 1 j
.i
' REFERENCE MATERIAL REQUIREMENTS'FOR REACTOR / SENIOR REACTOR I OPERATOR LICENSING EXAMINATIONS- d
- 1. Existing; learning objectives, Job Performance Measures' and: lesson plans
. (including training - manuals, plant orientation manual, system descrip-tions, reactor theory, thermodynamics, etc.)
]
Training materials shall include all substantive written material used 1 for preparing applicants for . initial R0 ' and SRO licensing. The written
' material shall include learning. objectives ' and .the details presented during lectures, rather than outlines. Training _ materials shall be identified by plant and. unit, bound, tabbed', and indexed. FAILURE TO
. PROVIDE COMPLETE, PROPERLY BOUND AND. INDEXED PLANT REFERENCE MATERIAL MAY RESULT IN THE RETURN OF THE , MATERIAL TO THE' PERSON WHO IS THE. HIGHEST-LEVEL OF MANAGEMENT- WH0 IS RESPONSIBLE FOR FACILITY OPERATIONS.
ACCOMPANYING ' THE- MATERIAL - WILL BE : A r0VER LETTER. EXPLAINING THE DEFICIENCIES- IN THE REFERENCE MATERIAL AND THE FACT THAT THIS WAS THE REASON THE EXAMINATIONS WERE CANCELLED' OR POSTPONED. Training. material s which include:the following shall be provided:
System'. descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.
System training material should draw parallels to' the- actual procedures used for operating the. applicable system.
Complete . and operationally useful- descriptions of all safety-system interactions under emergency and abnormal conditions, including consequences of anticipated operator error, maintenance error, and equipment failure.
Training material used to clarify and strengthen . understanding of emergency operating procedures.
1 g
L.
. Comprehensive theory material that includes fundamentals in the area of theory of reactor operation, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in plant components. For example, mechanical theory material on pumps shall include pump theory as well as descriptions of how these principles actually apply to major plant pumps and the systems in which they are installed. Reactor Theory material shall include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed 'in the plant (i.e., reactor theory material should contain explanations how principles relate to 'the actual curves used by operators to verify shutdown margin or calculate an ECP).
- 2. Complete Procedure Index (including surveillance procedures, etc.)
- 3. All Administrative Procedures (as applicable to reactor operation or safety)
- 4. All integrated plant procedures (normal or general operating procedures)
- 5. All emergency procedures (emergency instructions, abnormal or special procedures)
- 6. Standing- orders (important orders that are safety related and may super-sede the regular procedures)_
- 7. Surveillance procedures (procedures that are run frequently, i .e. weekly or that can be run on the simulator)
- 8. Fuel-handling and cure-loading procedures, (initial core-loading procedure, when appropriate)
- 9. All annunciator / alarm procedures
- 10. Radiation protection manual (radiation control manual or procedures)
- 11. Emergency plan implementing procedures
- 12. Technical Specifications (and interpretations, if available) for all units for which licenses are sought.
- 13. System Operating Procedures
- 14. Piping and Instrumentation diagrams, electrical single-line diagrams, or flow d'.agrams i
- 15. Technica'l Data Sook, and/or Plant curve information as used by operators and facility precautions, limitations, and set points (PLS) for the facility l
I i
7 V
- p. ,
+ .
- 16. Questions' and answers specific to the facility training program which may be used in the written or operating examinations (voluntary by facility licensee)-
- 17. Additional material required by the examiners to develop examinations that meet the requirements of these standards'and the regulations.
The above reference material shall be approved, final issues and shall be so narked. If a piant haf not finalized some of the material, the Chief Examiner shall verify with the facility that the most complete, up-to-date material is available and that agreement has been reached with the licensee for ' limiting changes before the administration of the examination. All procedures and reference material shall be bound with appropriate indices or tables of-contents so that they can be used efficiently. Failure to provide complete, properly- bound- and indexed plant reference material could result -in cancellation or rescheduling of the examinations es discussed 'in Paragraph 1 of this enclosure.
ENCLOSURE 2 REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS
- 1. A single room shall be provided for administration of the written examination. The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor ~ personnel during the written examination. If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building. Obtaining this room is the responsibility of the licensee.
- 2. Minimum spacing is required to ensure examination integrity as determined by the Chief Examiner. Minimum spacing should be one applicant per table, with a three foot space between tables.
- 3. Suitable arrangements shall be made by the facility if the applicants are to have lunch, coffee, or other refreshments. These arrangements shall comply with Item 1 above and shall be reviewed by the examiner and/or proctor.
- 4. The facility licensee shall provide pads of 8-1/2 by 11 inch lined paper in unopened packages for each applicant's use in completing the examination. The examiner shall distribute these pads to the applicants.
- 5. Applicants may bring pens, pencils, calculators or slide rules into the 4 examination room. Only black ink or dark pencils should be used for writing answers to questions. ,
1
- 6. The licensee shall provide one set of steam tables for each applicant.
The examiner shall distribute the steam tables to the applicants. No wall charts, models, and/or other training materials shall be present in the examination room. No other equipment or referent e material shall be allowed unless provided by the examiner.
I J
l l
ly;
'C .
r r
~
E '
ENCLOSURE 3 PROCEDURES FOR THE ADMINISTRATION'0F WRITTEN EXAMINATIONS
- 1. Check identification' badges.
- 2. Pass out examinations and all: handouts. _ Remind applicants not to review examination until instructed to do so.
READ THE FOLLOWING INSTRUCTIONS VERBATIM:
During the administration of this examination.the following rules apply:
- 1. Cheating on the examination means an automatic denial of your application:
and could resulttin more. severe penalties.
- 2. . After. the examination has been completed, you must sign the statement on the cover sheet : indicating that .the work is your-_own and you have not received or given. assistance in completing the examination. This must be-done after.you complete the examination.
READ THE-FOLLOWING INSTRUCTIONS
- 1. Restroom trips are to be limited and only one applicant at a time may
. leave. You must avoid all contacts' with anyone outside the examination room to avoid even the appearance or possibility of cheating.
- 2. Use black ink- or dark pencil only to facilitate legible. reproductions.
- 3. Print your name in the blank provided in the upper right-hand corner of the examination cover sheet.
- 4. Fill in the date on the cover sheet of the examination (if necessary).
- 5. You may write your answers on the examination question page or on a separate sheet of paper. USE ONLY THE PAPER PROVIDED AND DO NOT WRITE ON THE BACK SIDE OF THE PAGE.
- 6. If you write your answers on the examination question page and you need more space to answer a specific question, use a separate sheet of the paper proyhied and insert it directly after the specific question. DO NOT WRITE ON THE BACK SIDE Of THE EXAMINATION QUESTION PAGE.
-7. Print your nace in the upper right hand corner of the first page of each section of your answer sheets whether you use the examination question
.pages or separate sheets of paper. Initial each page.
- 8. Before ycu turn in your examination, consecutively number each answer sheet, including any additional pages inserted when wr' ting your arawers ,4 on the examination giestion page.
--___---____---___-__-___-______--_______-____-________-____-____-_____-____-_--__--___a
g .
-9. If you are_ using separate sheets, number each-answer as to category' and number ~ (i .e. H.02, J.05 - ) and skip at 'least 3 ' lines 'between answers to allow space'for grading.
I 10. Write "End of Category " at . the end 'of your answers to a category.
l 11. Star _t each category on a new page.
12 .' Write "Last Page" on the last answer' sheet.
-13. Use abbreviations only if they are commonly used in' ~ facility literature.
Avoid using symbols .such as <. or > signs to avoid a simple transposition
. error resulting'in an incorrect answer. Write it.out.
14' . The point value for' each- question is indicated:in parentheses after the question. The amount of blank space on1an examination question page is NOT an indication.of the depth of answer required.
- 15. Show all calculations, methods,- or assumptions used to obtain an answer.
- 16. Partial. credit may be given. Therefore, ANSWER ALL PARTS'0F.THE QUESTION AND;D0 NOT LEAVE'ANY ANSWER BLANK.
17-. Proportional grading will be - applied. ' Any additional wrong information that is provided may count against you. For example, if a question is worth 'one point and asks for four responses, each of which is worth 0.25 points, and you give five responses, each of your responses will be worth.
0.20. points. If one of your five responses is incorrect, 0.20 will be deducted and your total credit for that question will be 0.80 instead of 1.00 even though you got the four correct answers.
- 18. If the intent of a question is unclear, ask questions of the examiner only.
- 19. When turning in your . examination, assemble the completed examin? tion with examination questions, examination aids and answer sheets. In addition, turn in all scrap paper. .
- 20. To -pass the examination, you must achieve a grade of at least 70% in each !
category. j
- 21. There is a tine limit of (6) hours for completion of the examination.
l j
. (or some other time if less than the full examination is taten.) J
- 22. When you are done and have turned in your examination, leave the examination area (DEFINE THE AREA). If you are found in this area while i the examination is still in progress, your license may be denied or revoked. ,
i 1
i
g :, mm F r f ..
&. x s(*- ..
y ...e
) L 1
Enclosure 4 1
j ' REQUIREMENTS'FOR' FACILITY REVIEW OF' WRITTEN EXAMINATIONS:
p 1. ' At' the option of. the Chief Examiner, the facility may review the written L - examination' up to: two. weeks prior to its administration. This review may take place at~ the_ facility or in the Regional office. The Chief Examiner will . coordinate the. details of the review with the facility. An . NRC p ' examiner;will always be present during the review.
When. this option of ' examination review- is ' utilized, the facility reviewers will- sign the following statement prior to being allowed access to the examination. The examination or writwen notes will not be.
retained by the-facility.
- a. Pre-Examination ~ Security-Agreement I agree 'that' I 'will' not -knowingly divulge any information concerning ther replacement (or initial) examination-scheduled for- . to any4 unauthorized : persons. I understand, that I am not to participate in any: instruction ' involving--
those reactor _' operator or ' senior reactor Loperator applicants scheduled to be administered the above replacement (or Linitial).
examination from now- until after the examination has- been administered. I understand that violation of this security
-agreement could result in the examination being voided.
Signature /Date In addition, the facility staff reviewers will sign the following statement after the written examination has been administered,
- b. Post-Examination Security Agreement I did not, to the best of knowledge, divulge any information conce .ing the written examination administered on _ to any. unauthorized persons. I did not participate in providing any instruction to those reactor operator and senior reactor ope:ator applicants who were administered the examination from the time that I was allowed access to the examination.
Signature /Date
= - _ _ _ _ _ _ _ _ _ _ - - - _ - _ _ _ _ _ - _ _ _ - _ _
a , ..
- 2. Regardless of. whether the above examination review option is exercised, '
immediately following the ~ administration of the written ' examination, the facility staff shall be provided a marked up copy of 'the examination and '
the answer key. The copy of' the written examination shall include pen and. ink changes made to questions during the examination administration.
If the facility did not review the- examination prior to its administration, they will have five (5) working days from the day of the written examination to submit formal ' comments. If the facility. reviewed the examination prior to .its administration, any additional comments must be given to an examiner prior to his/her leaving the site at the end of
.the week of the written examination administration. In either case, the comments will be addressed to the responsible Regional Office by the highest level cf management responsible for facility operations. A copy of the submittal will be forwarded to the Chief Examiner, as appropriate.
Comments not submitted within the required time frame will be considered for inclusion in the. grading process on a case-by-case basis by the Regional Office Section Chief. Should the comment submittal deadline not be met, a long delay in grading the examination may occur.
- 3. The following format should be adhered to for submittal of specific comments:
- a. Listing of NRC Question, answer and reference b .' Facility comment / recommendation
- c. Reference (to support facility comment)
NOTES: 1. No change to the examination will be made without submittal of of a reference to support the facility comment. Any supporting documentation that was not previously supplied, should be provided.
- 2. Comments made without a concise facility recommendation will not be addressed, i- 4. A two hour post examination review may be held at the discretion of the Chief Examiner. If this review is held, the facility staff should be informed that only written comments that are properly supported will be l considered in the grading of the examination.
I L
rv
---_------x------r---a-----