ML20205E139

From kanterella
Jump to navigation Jump to search
Forwards NPDES Discharge Monitoring Rept for Hope Creek Generating Station for Month of Feb 1999. Rept Is Required by & Prepared Specifically for EPA & Nj Dept of Environ Protection
ML20205E139
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/22/1999
From: Bezilla M
Public Service Enterprise Group
To:
NEW JERSEY, STATE OF
Shared Package
ML20205E144 List:
References
NUDOCS 9904050070
Download: ML20205E139 (5)


Text

{{#Wiki_filter:. >O PSEG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bfidge, New Jersey 08038 Hope Creek Generating Station March 22, 1999 Department of Environmental Protection Division of Water Quality Bureau of Permit Management P.O. Box 029 Trenton, N.J. 08625-0029 RE: NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORT HOPE CREEK GENERATING STATION NJPDES PERMIT NJ0025411

Dear Sir:

Attached is the Discharge Monitoring Report for the Hope C: Pek Generating Station for the month of February 1999. This report is required by ard prep-ed specifica y for the Envi.snmental Protection Agency (epa) and the New ' 79ey r ) Department f Environmental Protection (NJDEP). It v:. d.a uu;; the observed results of measurements and analysis ra c, r2 t-s performed by the above agencies. *he choice of the mensurement devices and analytical methods are controlled by the EPA and the /j q NJDEP, not by the company, end there are limitations cn the / accuracy of such measurement devices and analytical teceniques '/ even when used and maintained as required. Accordingly, th.is report is not intended as an assertion that any instrument has measured, or that any reading analytical result represents the true value with absolute accuracy, nor is it an endorsement of -[- the suitability of any analytical or measurement procedure. af,l) If you have any questions concerning this report, please feel free to contact Mr. C. E. White. Sincerely, ,,/ Mark B. BezIlla n1003g General Manager - 9904050070 990322 Hope Creek Operations PDR ADOCK 05000354 R PDR, + inr~" 0+c0l: 954t 73 (?5Ml t pB9

~ NJPDES 2 03/22/99 Attachments C Executive Director, DRBC USNRC - Docket number 50-354 i I i I i I

,NJPDES 03/22/99 Explanation of Conditions February 1999 The following explanations are included to clarify possible deviation from permit conditions. General - The columns labeled "No. Ex", on the enclosed DMR, tabulate the number of daily discharge values outside-the indicated limits. Data reporting and accuracy reflect the working envircnment, the design capabilities and reliability of the monitoring instruments and operating equipment. Analytical values performed by the following NJDEP certified laboratories: ' Hope Creek Generating Station (17451) Raytheon Env. Services Laboratory (77343) South Jersey Testing, Inc. (06431) s Deviations from required sampling, analysis monitoring and reporting methods and periodicities are noted on the respective transmittal sheet. { Results reported on the Discharge Monitoring Report forms are consistent with permit limits, data supplied from contract laboratories,.the December 1993 revision of the NJDEP DMR Instruction manual and specific guidance from DEP personnel. 1 The industrial license holder's (N-2) signature is signifying the review for DSN's 461A and 461C. The S-4 license holder's signature signifies review for DSN-462B.

NJPDES 03/22/99 ) Explanation of Exceedances February 1999 ( l The following exceedances are included in the attached report and explained below.- DSN No. EXPLANATION No Exceedances l l l i i l

COUNTY OF SALEM ~ ~ , STATE OF NEW JERSEY I, Mark B. Bezilla, of full age, being duly sworn according to law, upon my oath depose and say: 1. I am the General Manager of the Hope Creek Generating Station, and as such am authorized to sign Discharge Monitoring Reports submitted to the New Jersey j Department of Environmental Protection pursuant to the j Station's New Jersey Pollutant Discharge Elimination System permit. 2. I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment. 3. The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this affidavit in satisfaction of the requirement that my signature be notarized. l, / l Mark B. Bezilla General Manager - Hope Creek Operations Sworn and subscribed before me this j?3Ad day of NM199 7 C 1~ ba N ) 'A DI D JENNIFER M. TURNER NOTARY PUBUC 0F NEW JERSEY My Commission Enkes Ji4 25,20M i

ADDENDA TO MONITORING REPORT - TRANSMITTAL SHEET February 1999 03/22/99 DISCHARGE NUMBER PAGE PARAMETER CODE COMMENTS 461A 2 of 3 00680 2 0 NET Values are =lculated utilizing results from grou samples.}}