ML20086B671

From kanterella
Jump to navigation Jump to search
Forwards Discharge Monitoring Rept for Hope Creek Generating Station for May 1995
ML20086B671
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 06/22/1995
From: Reddemann M
Public Service Enterprise Group
To: Corporale G
NEW JERSEY, STATE OF
Shared Package
ML20086B672 List:
References
NUDOCS 9507060038
Download: ML20086B671 (5)


Text

, -

D- ~. 4

. O PSEG Public Service Electric and Gas Cornpany P.O. Box 236 Hancocks Bridge, New Jersey 08038

. Hope Creek Generating Station June 22, 1995

{

i Chief George Corporale Bureau of Information Systems P. O. Box CN-029 Trenton, N. J. 08625 RE: NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORT HOPE CREEK GENERATING STATION NJPDES PERMIT NJ0025411

Dear Sir:

Attached is the Discharge Monitoring Report for the Hope Creek Generating Station for the month of May 1905.

This report is required by and prepared specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP). It presents only the observed results of measurements and analysis required to be performed by the above agencies. The choice of the measurement devices and analytical methods are controlled by the EPA and the NJDEP, not by the company, and there are limitations on the accuracy of such measurement devices and analytical techniques even when used and maintained as required. Accordingly, this report is not intended as an assertion that any instrument has measured, or that any reading analytical result represents the true value with absolute accuracy, nor is it an endorsement of the suitability of any analytical or measurement procedure.

If you have any questions concerning this report, please feel i free to contact Mr. C. E. White.  !

Sincerely, [

' I _

rk Reddemann General Manager -

Hope Creek Operations p ,q p 7 ,

9507060038 950622 PDR ADOCK 05000354 R PDR The Energy People

q

&; a,.. "

. , . .l I

.y--

\

N3PDES 2 g,gg,y5 M:eajI ..

Attachments C- Executive DiracLor, DRBC USNRC - Docket number 50-354 i

I' 1

.. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ . _ _ _ _ _ _ _ . _ _ _ _ . - _ _ . . _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ . _ . _ _ . _ _ _ _ ____m

i

{r . .

NJPDES- 6/22/95 Explanation of conditions  !

May 1995 The following explanations are included to clarify possible deviation from permit conditions.

General - The columns labeled "No.'Ex", on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits.

Data-reporting and accuracy reflect the working environment, the design capabilities _and reliability of the monitoring instruments and operating equipment.

' Analytical values performed by the following NJDEP certified laboratories:

NET Atlantic, Inc. (08153)

Hope Creek Generating Station (17451)

Talbot Laboratory, Inc. (77535)-

South Jersey Testing, Inc. (06431) '

Princeton Testing Laboratory, Inc. (11118)

Deviations from required sampling, analysis monitoring and reporting methods and periodicities are noted on the respective transmittal sheet.

Frequency for discharge point 461A, the Cooling Tower Blowdown, and the River were done at approximately 5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> intervals to provide for the cycles of concentration in the i system.

As per the Administrative Consent Order the TSS limit for discharge points 462A, 463A and 464 have been lifted and the interim thermal limits for discharge point 461A have been changed to 443 MBTU/hr (June - September) and 731 MBTU/hr (October - May).

Results reported on the Discharge Monitoring Report forms are consistent with permit limits, data supplied from contract laboratories, the December 1993 revision of the NJDEP DMR Instruction manual and specific guidance from DEP personnel.

6

F l NJPDES 6/22/95

. Explanation of Exceedances May 1995 ,

The following, exceec*ances' are included in the attached report '

and explained below. Exclusions have not-endangered nor significantly impacted public health or the environment.

DSN No. EXPLANATION ,

No Exceedances I

P t

?

L 3

i l

i l

l l

e -

COUNTY OF SALEM STATE OF NEW JERSEY I, Mark E. Reddemann, of full age, being duly sworn according to law, upon my oath depose and say:

1. I am the General Manager of the Hope Creek Generating Station, and as such am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of' Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit.
2. I certify under penalty of law that I have personally examined and am familiar with the information submitted-in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware ,

that there are significant penalties for submitting  !

false information including the possibility of fine and imprisonment.

3. The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this affidavit in satisfaction of the requirement that my signature be notarized.

\M //

M k E. cddeman G nera Manager -

Hope Creek Operations Sworn and subscrib before me this Q $ r)d day of 1995 IV Y l k.

I

\J 'ETTY B LOU McKEICH \

NOTARY PUBLIC OF NEW JERSEY IAY COMMISSION EXPIRES DEC. 6i.1996 ,

l l

l