ML20217P469

From kanterella
Jump to navigation Jump to search
Forwards Discharge Monitoring Rept for Month of Mar 1998, for Hope Creek Generating Station
ML20217P469
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/20/1998
From: Bezilla M
Public Service Enterprise Group
To:
NEW JERSEY, STATE OF
Shared Package
ML20217P473 List:
References
NUDOCS 9805060306
Download: ML20217P469 (5)


Text

l O PsEG Public, Service Electric and Gas Cornpany P.O. Box 236 Hancocks Bndge, New Jersey 08038 Hope Creek Generating Station

)

i April 20, 1998 I

I Department of Environmental Protection Division of Water Quality Bureau of Permit Management P.O.

Box 029 Trenton, N.J.

08625-0029 RE:

NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORT j

HOPE CREEK GENERATING STATION

)

NJPDES PERMIT NJ0025411

]

Dear Sir:

1 Attached is the Discharge Monitoring Report for the Hope Creek 1

Generating Station for the month of March 1998.

This report is required by and prepared specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP). It presents only i

the observed results of measurements and analysis required to be performed by the above agencies. The choice of the measurement devices and analytical methods are controlled by the EPA and the NJDEP, not by the company, and there are limitations on the l

accuracy of such measurement devices and analytical techniques j

even when used and maintained as required. Accordingly, this 1

report is not intended as an assertion that any instrument has measured, or that any reading analytical result represents the j

true value with absolute accuracy, nor is it an endorsement of i

the suitability of any analytical or measurement procedure.

If you have any questions concerning this report, please feel free to contact Mr.

C.

E. White.

Sincerely, 6

Mark B.

Bezil

{h General Manager -

Hope Creek Operations 9805060306 980420 PDR ADOCK 05000354

. f' R

PDR

' 2 The Energy People 95 2173 (2su) 12 89

)

i

(

2 04/20/98 NJPDES Attachments C

Executive Director, DRBC USNRC - Docket number 50 -354 l

NJPDES 04/20/98 Explanation of Conditions March 1998 The following explanations are included to clarify possible deviation from permit conditions.

General - The columns labeled "No. Ex", on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits.

Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments and operating equipment.

Analytical values performed by the following NJDEP certified laboratories:

Hope Creek Generating Station (17451)

Raytheon Env. Services Laboratory (77343)

South Jersey Testing, Inc. (06431)

Deviations from required sampling, analysic monitoring and reporting methods and periodicities are noted on the respective transmittal sheet.

Results reported on the Discharge Monitoring Report forms are consistent with permit limits, data supplied from contrac'c laboratories, the December 1993 revision of the NJDEP DMR Instruction manual and specific guidance from DEP personnel.

The industrial license holder's (N-2) signature is signifying the review for DSN's 461A and 461C. The S-4 license holder's signature signifies review for DSN-462B.

s

NJPDES 04 L'/98 Explanotic;. of Exceedances March 1998 The following exceedances are included in the attached report and explained below.

DSN No.

EXPLANATION No Exceedances l

1 l

COUNTY OF SALEM STATE OF.NEW JERSEY I, Mark B.

Bezilla, of full age, being duly sworn according to law, upon my oath depose and say:

1.

I am the General Manager of the Hope Creek Generating l

Station, and as such am authorized to sign Discharge Monitoring Reports subreitted to the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination j

System permit.

l 2.

I certify under penalty of law that I have personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible j

for obtaining the information, I believe the submitted l

information is true, accurate and complete. I am aware that there are significant penalties for submitting l

false information including the possibility of fine and imprisonment.

l 3.

The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this affidavit in satisfaction of the requirement that my signature be notarized.

l Mark B.

Bezills l

General' Manager -

Hope Creek Operations l

Sworn and subscribed before me this c2O

' day of % 199 3.

l b W sYkA. N.

G D

JENNIFER M. TURNER NOTARY PUBUC 0F NEW JERSEY My Commission Expires July 25,2000 l

L