Forwards NPDES Discharge Monitoring Rept for Apr 1991 for Hope Creek Generating Station. Frequency for Discharge Point 461A,cooling Tower Blowdown & River Done at Approx 5 H Intervals to Provide Cycles of Concentration in Sys
ML20077E152
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 05/24/1991
From: Hagan J
Public Service Enterprise Group
To: Corporale G
NEW JERSEY, STATE OF
Shared Package
ML20077E157 List:
References
NUDOCS 9106060199
Download: ML20077E152 (5)


Text

-

a

. O PSEG Pubhc Service Electric and Gas Company P O. Box 236 Hancocks Bridge. New Jersey 08038 Hope Creek Generating Station May 24, 1991 Chief George Corporale 1

Bureau of Information Systems j

P.

O.

Box CN-029 Trenton, N. J.

08625 RE:

NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORT HOPE CREEK GENERATING STATION NJPDES PERMIT NJ0025411

Dear Sir:

Attached is the Discharge Monitoring Renort for the Hope Creek Generating Station for the month of April 1991.

This report is required by and prepared ~specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP). It presents only the observed results of measurements and analysis required to be performed by the above agencies. The choice of the measurement devices and analytical methods are controlled by the EPA and the NJDEP, not by the company, and there are limitations on the accuracy of such measurement devices and analytical techni@es even when used and maintained as required. Accordingly, this report is not intended as an assertion that any instrument has measured, or that any reading analytical result represents the true value with absolute accuracy, nor is it an endorsement of the suitability of any analytical or measurement procedure.

If you have any questions concerning this report, please feel free to conM Mr.

C.. E. Whita.

Sincerely, J

gan' i

ene 1

anager -

{

Hope c Operations l

The Energy People lJ j

9106060199 910524 0

eDR ADock OsoOoas4 R

PDR

=

NJPDES 2

5/24/91 CW:eaj Attachments C

Executive Director, DRBC 1

USEPA - Dr. Richard Baker lUSNRC';

i i

e 1

i 1

NJPDES 5/24/91 Explanation of conditions April 1991 I

The following explanations are included to clarify possible deviation from permit conditions.

General - The columns labeled "No.

Ex", on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits.

Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments and operating equipment.

Analytical values performed by the following NJDEP certified laboratories:

NET Atlantic, Inc.

08153)

Hope Creek Generatin(g Station (17451)

Talbot Laboratorykng,c.

In (77535)

South Jersey Test Inc. (06431)

Deviations from required sampling, a.lalysis monitoring and reporting methods and periodicities are noted on the respective DMR.

e Frequency for discharge point 461A, the Cooling Tower Blowdown, and the River were done at approximately 5 hour5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> intervals to provide-for the cycles of concentration in the system.

As per the Administratitre Consent Order the TSS limit for discharge points 462A, 163A and 464 have been lifted and the interim themsel limits for discharge point 461A have been changed te;4d3 MBTU/hr (June - September) and 731 MBTU/hr-(October

-Mky).

l v

L..

NJPDES

-5/24/91 Explanation of Exceedances April 1991 The following exceedances are included ~in the attached report and explained below. Exclusions have-not endangered nor significantly impacted public health or the environment.

DSN No.

EXPLANATION No Exceedances i

I

+?

J _ _-_ - _---_'. _ _ _ _

COUNTY OF SALEM STATE OF NEW JERSEY I, Joseph J.

Hagan, of full age, being duly sworn according to law, upon my oath depose and say:

1.

I am the General Manager of the Hope Creek Generating Station, and as such am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination System permit.

2.

I have reviewed the attached Discharge Monitoring Reports. Pursuant to N.J.A.C.

7:14A-2.5, I cartify under penalty of law that the information provided in the attached document is true accurate and complete. I am aware that there are significant penalties for submitting false, inaccurate or incomplete information, including fines and/or imprisonment.

3.

The signature on the the attached Discharge Monitoring Reports is my signature and I am submitting this.

affidavit in satisfaction of the requirement that my signature be notarized.

9-agan ner M

ager -

Hope Operations Sworn and i

efore me this y of 199/,

(

j

,