ML20196G773

From kanterella
Jump to navigation Jump to search
Forwards NPDES Discharge Monitoring Rept for HCGS for Month of Oct 1998. Rept Is Required by & Prepared for EPA & Nj Dept of Environ Protection.Explanations Included to Clarify Possible Deviation from Permit Conditions,Encl
ML20196G773
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/23/1998
From: Bezilla M
Public Service Enterprise Group
To:
NEW JERSEY, STATE OF
Shared Package
ML20196G782 List:
References
NUDOCS 9812080080
Download: ML20196G773 (5)


Text

l r.

'O PSEG Pub lic Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038 Hope Creek Generating Station November 23, 1998 Department of Environmental Protection Division of Water Quality Bureau of Permit Management P.O.

Box 029

Trenton, N.J.

08625-0029 RE:

NEW JERSEY POLLUTANT DISCHARGE ELIMINATION SYSTEM DISCHARGE MONITORING REPORT HOPE CREEK GENERATING STATION NJPDES PERMIT NJ0025411

Dear Sir:

Attached is the Discharge Monitoring Report for the Hope Creek Generating Station for the month of October 1998.

This report is required by and prepared specifically for the Environmental Protection Agency (EPA) and the New Jersey Department of Environmental Protection (NJDEP). It presents only the observed results of measurements and analysis required to be perforrned by the above agencies. The choice of the meacurement devices and analytical methods are controlled by the EPA and the NJDEP, not by the company, and there are limitations on the accuracy of such measur>! ment devices and analytical techniques even when used and maintained as required. Accordingly, this report is not intended as an assertion that any instrument has measured, or that any reading analytical result represents the i

true value with absolute accuracy, nor is it an endorsement of l

the suitability of any analytical or measurement procedure.

If you have any questions concerning this report, please feel k

free to contact Mr.

C. E. White.

\\

Sincerely, eud Mark B.

Bezil D

General Manager -

<I i

9812000080 981123 Hope Creek Operations h

I PDR ADOCK 05000354.

/

R PDR _

The Energy People DEP173 pW112 89

i NJPDES.

2 11/23/98 Attachments 1

C Executive Director, DRBC ii USNRCi- : Docket, number 150-354 i

NJPDES, 11/23/98 Explanation of Conditions October 1998 The following explanations are included to clarify possible deviation from permit conditions.

General - The columns labeled "No. Ex", on the enclosed DMR, tabulate the number of daily discharge values outside the indicated limits.

Data reporting and accuracy reflect the working environment, the design capabilities and reliability of the monitoring instruments and operating equipment.

Analytical values performed by the following NJDEP certified laboratories:

(

Hope Creek Generating Station (17451)

Raytheon Env. Services Laboratory (77343)

South Jersey Testing, Inc. (06431)

Deviations from required sampling, analysis monitoring and i

reporting methods and periodicities are noted on the respective transmittal sheet.

Results reported on the Discharge Monitoring Report forms are consistent with permit limits, data supplied from contract l

lchoratories, the December 1993 revision of the NJDEP DMR Instruction manual and specific guidance from DEP personnel.

The industrial license holder's (N-2) signature is signifying the review for DSN's 461A and 461C. The S-4 license holder's signature signifies review for DSN-462B.

l l

i I

e

^

4

-. - - - - = - - - - - -

- = - - - - - - - - -

l.

l l

t

NJPDES, 11/23/98 Esplanation of Exceedances i

October 1998 l

The following exceedances are included in the attached report and explained below.

DSN No.

EXPLANATION No Exceedances

t COUNTY OF SALEM STATE OF NEW JERSEY I,

Mark B. Bezilla, of full' age, being duly sworn according l

to law, upon my oath depose and say:

1.

I am the General Manager of the Hope Creet Generating Station, and as such am authorized to sign Discharge Monitoring Reports submitted to the New Jersey Department of Environmental Protection pursuant to the Station's New Jersey Pollutant Discharge Elimination l

System permit.

1 2.

I certify under penalty of law that I have personally l

examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible l

for obtaining the information, I believe the submitted information is true, accurate and complete. I am aware j

that there are significant penalties for submitting false information including the possibility of fine and imprisonment.

3.

The signature on the attached Discharge Monitoring Reports is my signature and I am submitting this l

affidavit in satisfaction of the requirement that my l

signature be notarized.

t I

~

Mark B.

Bezill I

General Manager -

i 1: ope Creek Operations Sworn and subscribed before me this g28,1d day of ) ev 199%.

I

?ChalK H I uAW h

b JENNIFER M. TURNER NOMRY PUBUC OF NEW JERSEY j

My Commission Expires July 25,2000 i

4 l

--