Gen Emergency Control Plan & Emergency Procedures for Subj Facil Have Been Reviewed & Are Not Acceptable.Entire Categories of Info Req by 10CFR50 App E Are Lacking,As Is Other Needed Info.A Rev Plan Is Urged
ML20147C460
Person / Time
Site: 07001113
Issue date: 11/10/1978
From: Crow W
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Kaplan A
GENERAL ELECTRIC CO.
References
NUDOCS 7812180285
Download: ML20147C460 (1)


Text

a s ~m'o o

UNITED STATES NUCLEAR REGULATORY CGMMisslON V/)

r. E WASHINGTON, D. C. 20555

~

NOV 1 0 1973 FCPF:RLS i

70-1113 SNM-1097 General Electric Company ATTN: Mr. A. L. Kaplan Consulting Engineer  ;

Licensing  :

l P. O. Box 780 Wilmington, North Carolina 28401 Gentlemen:

We have reviewed the " General Emergency Control Plan" and emergency procedures for the Wilmington fuel fabrication facility that were transmitted by your letter of August 28, 1978. We find that these I documents are lacking entire categories of information called for in Appendix E of Part 50, such as agreements reached with local, state and federal officials. Furthennore, your plan does not follow the format suggested in Annex A of Regulatory Guide 3.42 (RG 3.42),

Emergency Planning for Fuel Cycle Facilities and Plants Licensed Under 10 CFR Parts 50 and 70. The information submitted is also lacking certain specific important information identified in RG 3.42, such as the minimum frequency for inspection of emergency equipment.

The missing infonnation is needed for us to reach a conclusion on the adequacy of your arrangements for emergencies.

We request that you prepare a revised emergency plan, in the form of a document separate from your emergency procedures, following the format suggested and supplying the information identified in RG 3.42.

To permit us to meet our schedule for completion of the review of your emergency plan, you should provide us the revised emergency plan within 45 days from the date of this letter.

Sincerely, -

f f0 9 W. T. Crow, Section Leader Uranium Fuel Fabrication Section Fuel Processing & Fabrication Branch Division of Fuel Cycle and Material Safety 7 812180 2 $7 6 C