Monthly Operating Repts for Apr 1997 for McGuire Nuclear Station Units 1 & 2
ML20141F560
Person / Time
Site: McGuire  Duke Energy icon.png
Issue date: 04/30/1997
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20141F542 List:
References
NUDOCS 9705210356
Download: ML20141F560 (10)


Text

"

0FERATING DATA REPORT l

l DOCKET NO 50-369 DATE May 15. 1997

' DPERATIN6 STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Nase: McGuire 1
2. Reporting Period: April 1, 1997-April 30, 1997
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Bross NWe): 1305e Notes eNameplate Rating
5. Design Electrict.1 Rating (Net MWe):  !!B0 (Gross MWe) calculated as
6. Marisus Dependable Capacity (Gross MWe): 1171 1450.000 MVA .90 pcuer
7. Marisas Dependable Capacity (Net MWe): 1129 factor per Page iii,
9. If Changes Occur in Capacity Ratings (! tees Nusber 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, if Any (Net MWe):
10. Reason for Restrictions, If any:

This Month Yr.-to-Date Cusulative

11. Hours in Reporting Period 719.0 2879.0 135119.0
12. Nust,er Of Hours Reactor Was Critical 0.0 1066.5 97458.4
13. Reactor Reserve Shutdown Hours --0-- --0-- --0--
14. Hours Generator On-Line C.0 1059.7 ?6451.1
13. Unit Reserve Shutdcun Hcurs - --0-- --0--
16. Stess Thersal Energy Generated (MWH) 0 3487712 304307774
17. Gross Electrical Energy Generated (HWH) 0 1210732 104500851
18. Het Electrical Energy Generated (MWH) -4006  !!55220 99881076
19. Unit Service Factor 0.0 36.8 71.4
20. Unit Availability Factor 0.0 36.8 71.4
21. Unit Cipacity Factor (Using MDC Net) 0.0 35.5 64.6
22. Unit Capacity Factor (Using DER Net) 0.0 34.0 62.6
20. Unit Forced Outage Rate 0.0 0.0 12.7
20. Shutdown Scheduled over Next 6 Months (Type, Date, and Duration of Each):
25. If Shut Down At End Of Report Period. Estimated Date of 3tartups,
26. Units In Test Status (Prior to Ceasercial Operation): Forecast Achirved i

INITIAL CRITICALITY l INITIAL ELECTRICITY l COMERCIAL OPERAT!DN l l

9705210356 970515 PDR ADOCK 05000369 R PDR

. l o

  • CPERATING DATA REPORT b

DOCKET N0 50-369 UNii McGuire i DATE May 15. 1997 COMPLETED BY R.A. Willians TELEPHONE 704-382-5346 EONTH Anril. 1997 M1 AVERASE DA!LY PDWER LEVEL M1 AVERAGE DAILY POWER LEVEL (MWe-NetI (MWe-Neti 1 0 17 0 2 0 1B 0 3 0 19 0 4 0 20 0 3 0 21 0 6 0 22 0 1 0 23 0 8 0 24 0 9 0 25 0 10 0 2h 0

!! 0 27 0 12 0 20 0 13 0 29 0 14 0 30 0 ,

i 15 ' 0 )

l l

16 0 1

s. - .m . . .. ._ _ _ . ~ .- -- . . . . _ _

UNIT SHUTDOWNS AND POWER REDUCTIONS- DOCKET NO. 50-369 UNIT NAME m yvaxts 1 DATE ud/ Ad/ y i <

REPCRT MONTH April 1997 COMPLETED BY x. A. williams TELEPHONE ( f ue) -Juz-dase (1) (2) (3) (4) (5) -

R MET-E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM- COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE

.1 97 1 S 719.00 C --

RC FUELXX END-OF-CYCLE 11 REFUELING OUTAGE  ;

i i

(1) (2) (3) (4) -

F Forced Reason- Method: Exhibit G - Instructions  !

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data  :

B-Maintenance or test 2-Manual Scram Entry Sneets For Licensee :

C-Refueling 3-Automatic Scram Event Reoort (LER D-Regulatory R9striction , ,

4-Other (Explain) File (NUREG-0161))

E-@erator Training & License Examination ,

F-Administrative G-Operator Error (5) i Exhibit I - Same Source H-Other (Explain) (Explain) t l

i

.m - - ,

. _ , , 4 , _ _ _ _ . . _ ._. -

,_ . . . , , , , . , __ . . _ , ~ ,, , , _

. . . . -. - ~ . . . --. - - . - . . - . .

.j i

-l r

DOCKET: 50 369 i

UNIT: McGuire 1 i Date: 05/15/97 [,

i

-l' NARRATIVE

SUMMARY

i I

MONTH: April,1997 l

McGuire Unit I began the month' of April in end -of-cycle 1 I refueling and steam generator replacement outage. The unitwas in the refueling outage the remainder of the month. ,

)

P F

l

)

l t  ;

i l

4 i

Prepared by: R. A. Williams "

Telephone:(704)- 382-5346 1

4 1

l L

k

b

+

. l i

MONTHLY REFUELING INFORMATION REOUEST

.1. Facility name: McGuire. Unit 1 ,

. i

2. Scheduled next refueling shutdown: Currently Refueling .
3. Scheduled restart following refueling: May 1997 ,

i THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 .;

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. .

4. Will refueling or resumption of operation thereaRer require a technical specification change or l otherlicense amendment?

If yes, what will these be?  :[

If no, has reload design and core configuration ben reviewed by Safety Review Committee regarding unreviewed safety questions? ,

5. Scheduled date(s) for submitting proposed licensing action and supposting information.

-6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

c 7. Number of Fuel assemblies (a) in the core: 191 i (b) in the spent fuel pool: 291  :

L  ;

8. Present licensed fuel pool capacity: Bfl Size of requested or planned increase: =
9. Projected date of last refueling which can be accommodated by present license capacity:

November 2005

. DUKE POWER COMPANY DATE: May 15.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382 5346 1

f s

5 a-+ , . . , ,. - -

.s a b OPERATING CATA R'EPORT DOCKET NO 50-370 DATEDy 15. 1997 CPERATINGSTATUS COMPLETED BY R.A. Williams TELEPh0NE 704-382-5346

1. Unit Names McGuire 2 2.ReportingPerited: April 1,1997-April 30,1997
3. Licensed Thereal Power (MWt): 3411
4. Nameplate Rating (Broes Me): 13059 Notes iMaseplate Rating
9. Design Electrical Rating (Net MWe):  !!B0 (Bross We) calculated as
6. Maxinus Dependable Capacity (Gross We): 1171 1450.000 W A .90 power
7. Maxinus Dependable Capacity (Net W el:  !!29 factor per Page lii,
9. If Changes Occur in capacity Ratings (Itees Number 3 Through 7) Since Last NURE6-0020.

RCart.GiveReasons:-

9. Power Level To Which Restricted, If Any (Net NWe):
10. Reason for Restrictions, If any: .

ThisPonth Yr.-to-Date Cusulative

't. H m s In Reporting Period 719.0 2879.0 115415.0

12. Number Of Heurs Reactor Was Critical 719.0 2879.0 91221.6
13. Reactor Reserve Shutdown Hours - --0-- -
14. Haurs Generator On-Line 719.0 2879.0 90155.0
15. Unit Reserve Shutdown Hours --0-- --0-- --0--

16.GrossThersalEnergyGenerated(MH) 2356756 9235961 296338871 17, 6tess Electrical Energy Sentrated (WHI  !!2265 3215401 103288436

18. Het Electrical Energy Benerated (NH) 790631 3092426 99060671
19. Unit Service Facter 100.0 100.0 78.1
20. Unit Availability Facter 100.0 100.0 78.1 L 21. Unit Capacity Factor (Using MDC Net) 97.4 95.1 75.3
22. Unit Capacity factor (Using DER Net) 93.2 91.0 72.8

! 23. Unit Forced Outage Rate 0.0 0.0 7.0

24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

( .

25. If Shut Down At End Of Report Period. Estimated Date of Startup: l
26. Units In Test Status (Prior to Consercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY CC M E9CIAL OPERATION

)

l CPERATINS DATA REPORT DOCKET NO 50-370 llNIT McGuire 2 DATE May 15. 1997 COMPLETED BY ' R. A. Williaes TELEPHONE 704-382-5346 MONTH hril,1997 SfAl AVERAGE DAILY FCWER LEVEL RA1

_ AVERAGE DA!LY POWER LEVEL (MWe-Net) (MWe-Net) i 1146 17  !!48 2  !!45 18 1110 3 1147 19 239 4 1147 20 733 5  !!49 21 1094 6  !!50 22 1145 7 1147 23  !!45 E. 1146 24 1147 9  !!46 25 1147 10 1l46 26 1140

!! 1149 27 1146 12 1149 20  !!46 13  !!40 29  !!45 14  !!46 30 1147 15 _,

1147 16  !!47 L

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mwulgs z DATE ud/id/ve REPORT MONTH April 1997 COMPLETED BY 4 A _. williams TELEPHONE t>ue;-aes-d3e6 (1) (2) (3) (4) (5)

R MET- .

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 4-P 97- 4-19 F --

A --

HH VALVEX FEEDWATER ISOLATION VALVE MODIFICATION 5-P 97- 4-20 F --

A --

HH VALVEX FEEDWATER ISOLATION VALVE MODIFICATION (1) (2) (3) (4)

F Forced Reason: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) Method:l 1-Manua for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction , , 4-Other (Explain) File (NUREG-0161))

E-Ocerator Training & License Examination F-ABministrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

. . - . . - . . . _ . - .~ _ . .

4 DOCKET: 50 - 370 UNIT: McGuire 2 Date: 05/15/97 i

NARRATIVE

SUMMARY

MONTil: April,1997 i

McGuire Unit 2 began the month of April operating at 100% full power. The unit operated at or near 100%

power until 04/18/97 at 2000 when the unit began decreasing power, and held at 28% power on 04/19/97 from 0330 to 04/20/97 at 0234 and the unit increased power and held at 79% power from 0920 to 04/21/97 l at 0308 due to feedwater isolation valve modification and waterbox repair. The unit returned to 100% full power on 04/21/97 at 0757 and operated at or near 100% full power the remainder of the month.

Prepared by: R. A. Williams Telephone: (704)-382 5346

I

..- 1 MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuire. Unit 2 -
2. Scheduled next refueling shutdown: Scotember 1997

.3. Scheduled restart following refueling: December 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 1 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.  !

4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

Ifyes, what will these be? >

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and supporting information.
6. Important licensing considerations (new or difTerent design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. ' Number of Fuel assemblies (a) in the core: 191 (b) in the spent fuel pool: 26.9
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: =
9. Projected date oflast refueling which can be accommodated by present license capacity:

June 2003 i

DUKE POWER COMPANY DATE: May 15.1997 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 4