RBG-21-914, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-29.Corrective Actions:Addl Samples of Welds Previously Accepted by Eight Inspectors Taken & Training Provided for Inspectors Performing Visual Weld Insps

From kanterella
(Redirected from ML20133E224)
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in Insp Rept 50-458/85-29.Corrective Actions:Addl Samples of Welds Previously Accepted by Eight Inspectors Taken & Training Provided for Inspectors Performing Visual Weld Insps
ML20133E224
Person / Time
Site: River Bend Entergy icon.png
Issue date: 08/21/1985
From: William Cahill
GULF STATES UTILITIES CO.
To: Martin R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20133E184 List:
References
RBG-21-914, NUDOCS 8510090313
Download: ML20133E224 (4)


Text

.

GULF STATES UTELITIES COMPANY  :

RIVER BEND STATION POST OFFict 80 A J20 . ST FRANOSVILLE. LOutSIANA 70775 ARE A CODE 504 635 6094 346 8651 August 21, 1985 RBG- 21,914 File Nos. G9.5, G15.4.1 Mr. Ibbert D. Martin, Regional Administrator -

U.S. Nuclear Regulatory Ccmnission Region IV

)$$$0N.I j

j 4]

611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 M27E

Dear Mr. Martin:

River Bend Station - Unit 1 Refer to: Region IV Docket No. 50-458/ Report 85-29 This letter is in response to the Notice of Violation contained in NRC I&E Inspection Report No. 50-458/85-29. The inspection was performed by Mr. L. E. Ellershaw and D. P. Tculinson during the period April 1 - July 12, 1985, of activities authorized by NRC Construction Permit CPPR-145 for River Bend Station Unit No. 1.

Gulf States Utilities Ccapany's (GSU) response to the Notice of Viola-tion 85-29-01, " Failure to Assure Conformanr:e of Safety - Related Structur-al Steel Welds with Requirements," is provided in the enclosed attachment.

'Ihis ccxtpletes GSU's response to the Notice of Violation.

Sincerely, y

. J. Cahill, .

Senior Vice President River Bend Nuclear Group WJC/ ICC/amg g 8510090313 850930 PDR ADOCK 0500045G G PDR

Attachment i~C - /23 &$~~

t

ATTAOBENT August 21, 1985 RBG- 21,914 ,

Response to Notice of Violation Reference Notice of Violation - E. H. Johnson letter to W. J. Cahill dated August 2, i 1985.

Refer to Docket 50-458/85-29.

, Response to 85-29-01 " Failure to Assure Conformance of Safety-Related 1 Structural Steel Welds with Requirements" Reason for the Violation The cause of this deficiency appeared to be the inability of Field Quality

, Control (FQC) inspectors to consistently apply adequate inspection tech-niques during structural steel visual weld acceptance.

Corrective Steps Which Have Been Taken and Results Achieved

]

1 Additional samples were taken of welds previously accepted by the eight

! inspectors identified during the initial audit. One of these eight inspec-tors only inspected two additional Category I welds and these inspection

, reports were for inspection of erection seat welds, defined as tanporary.

Therefore, no additional reinspection was performed for that inspector. A total of 42 connections representing 75 welds were reinspected for the l remaining seven inspectors. Results of the reinspection are documented on Type "C" Inspection Report S-5620033. Additionally, earlier quality veri-fication inspections were performed in association with GSU DR-43 and DR-78. Type "C" Inspection Reports S-52620000 and S-2620012 document veri-

fication of weld inspecticns performed by six inspectors, representing 107 welds. Inspection Report S-3201307, S-3201319, S-3201320 and S-3201381 docunent verification of weld inspection by seven inspectors, representing 70 welds. These quality verification inspection results, which cover a four-year period of structural welding inspection at River Bend Station, establishes a confidence factor that structural welding inspections were performed in accordance with the existing criteria.

N&D 11756 was dispositioned " Accept-As-Is" for the welding discontinuities l identified during the initial NRC audit. Due to the fact that the inspec-tors involved are no longer anployed at River Bend Station, specific cor-rective action for those inspectors is not applicable, i

i r--- w.,.,,, ..- ,, ,, , , , -,-v ,.e.r,-,---,,,mn,.,-,,,e--- ,~,,~,,,c,-,---,---,--,,-w~.-.e ,~.-,-,,.n.,-m.---m-

-,- + ..- n , -

August 21, 1985 RBG- 21,914 1 ,

NOIE
GSU - Deficiency Report 43 " Unsatisfactory inspections by SWEC l E Inspector" was closed by NRC Inspection Report 82-16.

t l' GSU - Deficiency Report 78 " Failure of FQC Inspector to detect  ;

undersize weld" was reviewed and closed as documented in NFC '

1 Inspection Report No. 84-30.

Training was provided on June 18, 1985 for those structural inspectors currently performing visual weld inspections. This training crtphasized the weld acceptance criteria applicable to current structural weld acceptance.

I

Corrective Steps Which Will Be Taken to Avoid Further Violations None.

1 Date When Full Canpliance Was Achieved Full catpliance was achieved on August 8,1985.

i l

i i.

}

1 i

i f

1 i

f 1

l

,-----,--.,-n -,n.- + , , - , - . - - - - ,

--~-w ..--- ~ n , . , , - - - - ~ - - + - , , , , , - _

O ,

UNITED STATES OF AMERICA NUCLEAR REGULATORY ColetISSION STATE OF LOUISIANA 5 PARISH OF WEST FELICIANA 5 In the Matter of I Docket Nos. 50-458 CULF STATES UTILITIES COMPANY l (River Bend Station, Unit 1)

AFFIDAVIT W. J. Cahill, Jr., being duly sworn, states that he is a Senior Vice President of Gulf States Utilities Company; that he is authorized on the part of said Company to sign and file with the Nuclear Regulatory Commission the documents attached hereto and that all such documents are true and correct to the best of his knowledge, information and belief.

/

W. Cahill,Jr[

Subscribed and sworn to before me, a Notary Public in and for the State and Parish above named, this A / day of Awy.n b , 19 FC

/

((ld '

. 1 Y Joan W. Middlebrooks

/- Notary Public in and for West Feliciana Parish, Louisiana My Commission is for Life.