Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217F8011999-10-13013 October 1999 Informs That on 990930,NRC Completed mid-cycle PPR of McGuire Nuclear Station.Areas That Warranted More than Core Insp Program Over Next Five Months,Not Identified.Historical Listing of Plant Issues Encl ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212J2191999-10-0404 October 1999 Informs That Util 980326 Response to GL 97-06, Degradation of SG Internals Provides Reasonable Assurance That Condition of Steam Generator Internals Are in Compliance with Current Licensing Bases for Facility ML20212J7801999-10-0404 October 1999 Discusses GL 98-01 Issued by NRC on 980511 & DPC Responses for McGuire NPP & 990615.Informs That NRC Reviewed Responses & Concluded That All Requested Info Re Y2K Readiness Provided.Subj GL Considers to Be Closed ML20217C4471999-10-0404 October 1999 Forwards Insp Repts 50-369/99-06 & 50-370/99-06 on 990801- 0911.Determined That One Violation Occurred & Being Treated as Non-Cited Violation ML20212M1651999-09-23023 September 1999 Refers to 990917 Meeting at Region II Office Re Licensee Presentation of self-assessment of McGuire Nuclear Station Performance.List of Attendees & Licensee Presentation Handouts,Encl ML20212D1671999-09-20020 September 1999 Forwards Exemption & SER from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Re Isolation of Main Steam Branch Lines Penetrating Containment.Exemption Related to Licensee Application ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20212B6491999-09-15015 September 1999 Informs That Encl Announcement Re 990913 Application for Amend to Licenses NPF-9 & NPF-7 Forwarded to C Observer in North Carolina,For Publication ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A4131999-09-14014 September 1999 Informs That TR DPC-NE-2009P Submitted in 990817 Affidavit, Marked Proprietary,Will Be Withheld from Public Disclosure, Pursuant to 10CFR2.709(b) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20212A0501999-09-10010 September 1999 Informs That Postponing Implementation of New Conditions Improved by RG 1.147,rev 12,acceptable Since Evaluation on Relief Based on Implementing Code Case for Duration of Insp Interval ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211J3671999-08-31031 August 1999 Forwards Public Notice of Application for Amend to License NPF-9 Seeking one-time Extension of Surveillance Frequency for TS SR 3.1.4.2 Beyond 25% Extension Allowed by TS SR 3.0.2 ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211K8831999-08-26026 August 1999 Forwards Insp Repts 50-369/99-05 & 50-370/99-05 on 990620-0731.Two Violations Occurred & Being Treated as NCVs ML20211G5181999-08-24024 August 1999 Forwards SE Re second-10-yr Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210V0171999-08-13013 August 1999 Confirms Conversation Between M Cash & M Franovich on 990806 Re Mgt Meeting,Scheduled for 990917 to Present self- Assessment of Plant Performance.Meeting Will Be Held in Atlanta,Ga ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20211B7881999-08-10010 August 1999 Transmits Summary of Two Meetings with Risk-Informed TS Task Force in Rockville,Md on 990514 & 0714 ML20210Q3701999-08-0505 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Authorized Representative of Facility Must Submit Ltr as Listed,Thirty Days Before Exam Date in Order to Register Individuals to Take Exam ML20210H7691999-07-21021 July 1999 Submits Summary of 990715 Meeting at Facility Re Presentation of Results of Most Recent Periodic Ppr.List of Meeting Attendees Encl ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20210E1931999-07-13013 July 1999 Forwards Insp Repts 50-369/99-04 & 50-370/99-04 on 990509-0619.Four Violations of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy NUREG-1431, Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation1999-07-0909 July 1999 Forwards SER Agreeing with Util General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196J9001999-07-0606 July 1999 Informs That 990520 Submittal of Rept DPC-NE-3004-PA,Rev 1, Mass & Energy Release & Containment Response Methodology, Marked Proprietary Will Be Withheld Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20196J4381999-06-29029 June 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1,NRC Revised Info in Rvid & Releasing Rvid Version 2 ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195H1681999-06-10010 June 1999 Forwards Copy of Preliminary ASP Analysis of Operational Condition Discovered at Ons,Units 1,2 & 3 on 980212 & Reported in LER 269/98-004,for Review & Comment ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20195E8771999-06-0202 June 1999 Confirms Telcon with M Cash on 990524 Re Public Meeting for 990715.Purpose of Meeting to Discuss Results of NRC Most Recent PPR ML20195F1851999-06-0202 June 1999 Forwards Insp Repts 50-369/99-03 & 50-370/99-03 on 990328- 0508.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20207D0521999-05-21021 May 1999 Informs That in Telcon on 990519 Between a Orton & Rf Aiello Arrangements Made for Administration of Initial Written Exam for McGuire Nuclear Station on 990603.Exam Will Be Administered at Catawba Simultaneously with Written Exam ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217H5811999-10-15015 October 1999 Forwards 1999 Update to FSAR, for McGuire Nuclear Station.With Instructions,List of Effective Pages for Tables & List of Effective Pages for Figures ML20217F3261999-10-13013 October 1999 Submits Quantity of Tubes Insp from Either Side of SGs A-D & Lists Tubes with Imperfections,Locations & Size.No Tubes Removed from Svc by Plugging.Total of Eleven Tubing Wear Indications Identified at Secondary Side Supports in SGs ML20217F3591999-10-13013 October 1999 Forwards Info Copy of Cycle 14 COLR for McGuire Nuclear Station,Unit 1 ML20217G7861999-10-13013 October 1999 Forwards MOR for Sept 1999 & Revised MOR for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20217J5091999-10-0606 October 1999 Forwards Revs to Section 16.15-4.8.1.1.2.g of McGuire Selected Licensee Commitments Manual.Section Has Been Revised to Allow Testing of Portions of DG Fuel Oil Sys Every 10 Yrs ML20217C8351999-10-0505 October 1999 Communicates Correction to Info Provided During 990917 Meeting with Duke Energy & NRC Region Ii.Occupational Radiation Safety Performance Indicator Values Should Have Been Presented as 1 Instead of 0 ML20212D5321999-09-15015 September 1999 Informs That Duke Energy Corp Agrees to Restrict Max Fuel Rod Average Burnup to 60,000 Mwd/Mtu,In Order to Support NRC Final Approval & Issuance of Requested Amend ML20216E8791999-09-14014 September 1999 Forwards Monthly Operating Repts for Aug 1999 & Revised Monthly Operating Rept for July 1999 for McGuire Nuclear Station ML20212A2631999-09-0909 September 1999 Forwards Rev 25 to McGuire Nuclear Station,Units 1 & 2 Pump & Valve Inservice Testing Program, IAW 10CFR50.55a. Section 8.0 Contains Summary of Changes & Detailed Description of Changes Associated with Rev 25 ML20212A5191999-09-0808 September 1999 Requests NRC Approval for Relief from Requirements of ASME Boiler & Pressure Vessel Code,Section XI,1989 Edition,App VI,VI-2430(c) & 2440(b).Approval of 99-GO-002 Is Requested by 000301 ML20211H1741999-08-30030 August 1999 Forwards Comments on Catawba Nuclear Station Units 1 & 2 & McGuire Nuclear Station,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid.Ltr Dtd 990107,rept ATI-98-012-T005 & Partial marked-up Rept WCAP-14995 Encl ML20211M4451999-08-30030 August 1999 Forwards Summary of Util Conclusions Re Outstanding Compliance Issue Re Staff Interpretation of TS SR 3.0.1,per Insp Repts 50-369/99-03 & 50-370/99-03,as Discussed with NRC During 990618 Meeting ML20211F2971999-08-17017 August 1999 Forwards non-proprietary & Proprietary Updated Pages for DPC-NE-2009,submitted 980722.Pages Modify Fuel Design & thermal-hydraulic Analysis Sections of DPC-NE-2009. Proprietary Page 2-4 Withheld,Per 10CFR2.790 ML20211B1121999-08-16016 August 1999 Forwards Topical Rept DPC-NE-2012, Dynamic Rod Worth Measurement Using Casmo/Simulate, Describing Results of Six Drwm Benchmark Cycles at Catawba & McGuire & Discusses Qualification to Use Drwm at Catawba & McGuire ML20210S2231999-08-12012 August 1999 Forwards Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for June 1999,encl ML20210R0031999-08-10010 August 1999 Forwards Revised TS Bases Pages to NRC for Info & Use. Editorial Changes Were Made to Correct Incorrect UFSAR Ref Number Associated with Certain Reactor Coolant Sys Pressure Isolation Valves ML20210R4311999-08-10010 August 1999 Forwards Summary Rept of Mods,Minor Mods,Procedure Changes & Other Misc Changes Per 10CFR0.59 ML20210T4511999-08-10010 August 1999 Forwards Response to NRC RAI Re 981014 Standby Nuclear Svc Water Pond Dam Audit Conducted by FERC ML20209H6921999-07-15015 July 1999 Forwards Comments on Preliminary Accident Sequence Precursor Analysis Provided in NRC Re Operational Condition Reported in LER 269/1998-04 ML20209H1551999-07-14014 July 1999 Forwards Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for May 1999 Also Encl ML20209G5151999-07-0808 July 1999 Forwards Amended Pages to Annual Radioactive Effluent Release Repts, for 1997 & 1998 for McGuire Nuclear Station. Portion of Rept Was Inadvertently Omitted Due to Administrative Error,Which Has Been Corrected ML20196G3721999-06-24024 June 1999 Documents Verbal Info Provided to NRR During Conference Call Re Relief Requests 98-002 & 98-003 ML20196G7461999-06-22022 June 1999 Requests Exemption from Requirements of 10CFR54.17(c) That Application for Renewed Operating License Not Be Submitted to NRC Earlier than 20 Yrs Before Expiration of Operating License Currently in Effect ML20195K3601999-06-14014 June 1999 Forwards MORs for May 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised MORs for Apr 1999.Line 6 Max Dependable Capacity (Gross Mwe) on Operating Data Rept Should Be Revised to 1114 from Jan 1998 to Apr 1999 ML20195D5691999-06-0303 June 1999 Submits Ltr to Facilitate Closing of Inspector Follow Up Item 50-369,370/97-15-05,re Revising Site Drawings in UFSAR Into Summary one-line Flow Diagrams,Per NRC 990327 Telcon ML20196L1791999-05-20020 May 1999 Communicates Util Licensing Position Re Inoperable Snubbers. Licensee Has Determined That Structure of ITS Has Resulted in Certain Confusion Re Treatment of Inoperable Snubbers ML20196L1851999-05-20020 May 1999 Forwards Proprietary & non-proprietary Version of Rev 1 to TR DPC-NE-3004, Mass & Energy Release & Containment Response Methodology, Consisting of Finer Nodalization of Ice Condenser Region.Proprietary Info Withheld ML20206T4481999-05-13013 May 1999 Forwards Rev 3 to Topical Rept DPC-NE-3002-A, UFSAR Chapter 15 Sys Transient Analysis Methodology, IAW Guidance Contained in NUREG-0390 ML20206R0791999-05-13013 May 1999 Forwards Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 & Revised Monthly Operating Repts for Mar 1999 ML20206S9151999-05-11011 May 1999 Forwards Rev 29 to McGuire Nuclear Station Selected Licensee Commitments. Section 16.11-16.2 Has Been Revised to Apply Guidance of NUREG-0133 for Performing Gaseous Effluent Dose Pathway Calculations ML20206K1341999-05-0303 May 1999 Forwards 1999 Interim UFSAR for McGuire Nuclear Station. UFSAR Update Includes Items Relocated During Improved Tech Specs Implementation.Next Regular UFSAR Update as Required 10CFR50.71(e) Is Due in Oct 1999 ML20206F3321999-04-28028 April 1999 Forwards Annual Radioactive Effluent Release Rept for 1998 for McGuire Nuclear Station. Listed Attachments Are Contents of Rept.Revised ODCM Was Submitted to NRC on 990203 ML20206E4101999-04-26026 April 1999 Forwards Four Copies of Rev 9 Todpc Nuclear Security & Contingency Plan,Per 10CFR50.54(p)(2).Changes Do Not Decrease Safeguards Effectiveness of Plan.Encl Withheld,Per 10CFR73.21 ML20206B4791999-04-20020 April 1999 Requests Exemption from GDC 57 Re Reactor Containment - Closed Sys Isolation Valves,As Described in 10CFR,App a for Containment Penetrations M393 & M261.Detailed Technical Evaluation & Justification for Exemption Request,Encl ML20205S9731999-04-19019 April 1999 Submits Info Re Quantity of SG Tubes Inspected,Tube Indications of Imperfections & Tubes Removed from Svc by Plugging,Per TS 5.6.8,part B 05000369/LER-1999-001, Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence1999-04-16016 April 1999 Forwards LER 99-01(S)-00 Re Contract Employee Submittal of False Info Resulting in Gaining Unescorted Access.No Licensee Planned Corrective Actions or Other Regulatory Commitments Were Identified as Result of Incidence ML20206K3561999-04-13013 April 1999 Forwards Revised McGuire Nuclear Station Selected Licensee Commitments (SLC) Manual. Significant Changes Are Marked by Vertical Bars on Right Margin ML20205P8891999-04-13013 April 1999 Forwards Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Feb 1999 Encl ML20205K5131999-04-0707 April 1999 Forwards Complete Response to NRC 981209 & 990105 RAIs on Question 11 Re LARs for McGuire & Catawba Nuclear Stations. Addl Info Received from W & Contained in Encl W ML20205C4611999-03-23023 March 1999 Submits Correction to Violation Against 10CFR50 App B, Criterion VII, Control of Purchased Matl,Equipment & Svcs, Issued to McGuire Nuclear Station on 980807 ML20205B6161999-03-23023 March 1999 Provides Addl Info & Correction to Typo in Re License Bases Record Change Re License Amend Submittals ,approved as FOL NPF-9 & NPF-17,amends 184 & 166, respectively.Marked-up TS Pages,Encl ML20205B6011999-03-23023 March 1999 Requests That NRC Place Technical Interface Agreement 97-02 Re URI 96-11-03,raising Operability & Design Criteria Conformance Issues Re Hydraulic Snubbers Installed at Plant & NRR Response on Dockets to Provide Record of Issue ML20204J0051999-03-19019 March 1999 Forwards Response to 990127 & 28 RAIs Re GL 96-05 for Catawba & McGuire Nuclear Stations ML20204E1791999-03-18018 March 1999 Reflects 990318 Telcon Re License Bases Record Change for License Amend Submittals ,approved as Amends 184 & 166,respectively for Licenses NPF-9 & NPF-17.TS Pages Encl ML20204C8821999-03-15015 March 1999 Forwards Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2.Revised Rept for Jan 1999 Encl ML20207C2071999-02-25025 February 1999 Informs of Revised Expected Submittal Date of Proposed License Amend Presented at 990127 Meeting Re Soluble Boron & Boraflex.Util Plans to Submit Proposed License Amend in First Quarter of 1999 ML20207C0501999-02-25025 February 1999 Submits Annual Rept Specifying Quantity of Each of Principal Radionuclides Released to Environment in Liquid & Gaseous Effluents,Per 10CFR72.44(d)(3).Effluent Release from ISFSI for CY98 Was Zero ML20207C7691999-02-22022 February 1999 Forwards Annual Occupational Radiation Exposure Rept for 1998. Rept Provides Tabulation of Number of Station,Utility & Other Personnel Receiving Exposure Greater than 100mRem/yr Followed by Total Dose for Each Respective Worker ML20207C6851999-02-22022 February 1999 Forwards Revised TS Bases Pages,Reflecting Removal of SI Signal on Low Steamline Pressure on Page B 3.3.2-16 & Adding Clarification for Increasing Hydrogen Recombiner Power During Testing on Page B 3.6.7-4 ML20206S3341999-01-28028 January 1999 Forwards Proprietary & non-proprietary Responses to NRC 981209 & 990105 RAIs Re Util Lars,Permitting Use of W Fuel at McGuire & Catawba Stations.Proprietary Info Withheld,Per 10CFR2.790 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARML20059L0101990-09-19019 September 1990 Provides Addl Response to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per .Corrective Action:Operations & Compliance Mgt Further Examined Event & Concluded That Trains Vc/Yc Inoperable Per Special Order ML20059L0091990-09-18018 September 1990 Informs of Delay in Response to Violations Noted in Insp Repts 50-369/90-14 & 50-370/90-14.Delay Due to Ongoing Review ML20059J7121990-09-14014 September 1990 Forwards Monthly Operating Rept for Aug 1990 for McGuire Nuclear Station Units 1 & 2 & Monthly Operating Status Rept for Jul 1990 ML20059L5491990-09-14014 September 1990 Forwards Proprietary Response to Question Re Scope of Review of Topical Rept, Safety Analysis Physics Parameter & Multidimensional Reactor Transients Methodology, Per & 900723 Meeting.Response Withheld ML20059L5521990-09-14014 September 1990 Forwards Response to 18 Questions Re Topical Rept DPC-NE-2004,per NRC 900802 Request for Addl Info.Encl Withheld (Ref 10CFR2.790) ML20065D4671990-09-11011 September 1990 Informs of Delay in Response to Violation Noted in Insp Repts 50-369/90-11 & 50-370/90-11,per Commitment in ML20064A8031990-09-10010 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-369/90-13 & 50-370/90-13.Corrective Actions:Procedures Dealing W/Fuel Handling Will Be Enhanced by Adding Sign Off to Sections Which Ref Fuel Handling in Tech Specs ML20059G3011990-09-0404 September 1990 Forwards Response to NRC 900327 Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20064A5741990-09-0404 September 1990 Discusses Re Info to Support Util Position Relative to Resolving Issue of Main Steam Line Breaks Inside Ice Condenser Containments & Requests That Info Be Withheld (Ref 10CFR2.790) ML20064A5671990-09-0101 September 1990 Advises That Corrective Actions Re Violation of Insp Rept 50-369/89-01 & 50-370/89-01 Will Be Completed by 910101 ML20059D3461990-08-30030 August 1990 Forwards Semiannual Effluent Release Rept for First Half of CY90 & Revs to Process Control Program ML20059D1901990-08-22022 August 1990 Responds to Violations Noted in Insp Repts 50-369/90-11 & 50-370/90-11.Corrective Actions:Valves VC-1,VC-2,VC-3,VC-4, VC-9,VC-10,VC-11 & VC-12 Reopened Upon Discovery of VC-1 - VC-4 Being Closed & Procedure IP/0/13/3006/09 Revised ML20059G9141990-08-22022 August 1990 Forwards Public Version of Revised Epips,Including Change 0 to RP/O/A/5700/01,Change 0 to RP/O/A/5700/02 & Change 0 to RP/O/A/5700/03 ML16259A2391990-08-22022 August 1990 Forwards Public Version of Rev 27 to Company Crisis Mgt Implementing Procedure CMIP-2, News Group Plan. W/ Dh Grimsley 900906 Release Memo ML20059B4451990-08-20020 August 1990 Requests That NRC Approval of Original Relief Request 89-02 Be Extended to Include Changes to Mods MG-22233 & MG-22243 as Described.Hydrostatic Testing Impractical Due to Inadequacy of Test Boundaries ML20059C1201990-08-20020 August 1990 Forwards Rept Summarizing Util Findings Re Three False Negative Blind Performance Urine Drug Screens Which Occurred During Jan & Feb 1990.Recommends That NRC Consider Generic Communication to Clearly State Reporting Requirement ML20059C1591990-08-17017 August 1990 Suppls by Providing Addl Info to Support Util Position Re Anl Confirmatory Analysis of Main Steamline Breaks in Ice Condenser Plants.Encl Withheld ML20063Q0901990-08-15015 August 1990 Forwards Monthly Operating Repts for Jul 1990 for McGuire Nuclear Station Units 1 & 2 & Revised Rept for June 1990 ML20063Q2671990-08-14014 August 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Including Rev 36 to CMIP-1,Rev 32 to CMIP-4,Rev 36 to CMIP-5,Rev 41 to CMIP-6,Rev 40 to CMIP-7,Rev 27 to CMIP-8 & Rev 35 to CMIP-9.W/DH Grimsley 900821 Release Memo ML20058N0181990-08-0808 August 1990 Forwards Response to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire ML20063Q0181990-08-0707 August 1990 Confirms That Planned Corrective Actions Listed in Paragraph 3 of Insp Repts 50-369/90-10 & 50-370/90-10,appropriately Described ML20058L4061990-08-0101 August 1990 Forwards Rev 0 to Inservice Insp Rept Unit 1 McGuire 1990 Refueling Outage 6 ML20059K0291990-08-0101 August 1990 Forwards Comments on Reactor Operator & Senior Reactor Operator Written Exams Administered on 900730 ML20056A9541990-08-0101 August 1990 Provides Final Response to NUREG-0737,Item II.D.1, Performance Testing of Safety Relief Valves. Util Will Change Seal Configuration for Existing Valves to Seal on Steam Medium & Install Continuous Drain for Loop Piping ML20058L1811990-08-0101 August 1990 Forwards Safety Evaluation of Large Break LOCA Event Reanalysis Per 10CFR50.46 Re Peak Clad Temp Increases ML20056A1571990-07-23023 July 1990 Forwards Public Version of Change 0 to RP/0/A/5700/10 & Rev 25 to Section 18.2 of Radiation Protection Manual.W/ Dh Grimsley 900730 Release Memo NLS9000259, Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes1990-07-16016 July 1990 Responds to Violations Noted in Insp Repts 50-369/90-09 & 50-370/90-09.Corrective actions:in-house Training Will Be Provided on Correct Method for Determining Proper Response to Problem Investigation Processes ML20055F7721990-07-13013 July 1990 Forwards Monthly Operating Repts June 1990 for McGuire Nuclear Station Units 1 & 2 & Status Rept for May 1990 ML20044B0561990-07-0303 July 1990 Forwards Public Version of Epips,Consisting of RP/0/A/5700/02 & RP/0/A/5700/03 & RP/0/A/5700/04.W/ Dh Grimsley 900716 Release Memo ML20055C9851990-06-25025 June 1990 Forwards Rev 9 to Training & Qualification Plan.Rev Withheld ML16152A9841990-06-19019 June 1990 Forwards Revised Public Version of Rev 90-03 to Vol B of Epips,Including CP/2/A/2002/04C, Operating Procedure for Post-Accident Liquid Sampling, & Maint Directive 8.1 ML20044A7941990-06-19019 June 1990 Forwards Public Version of Epips,Including HP/0/B/1009/06, HP/0/B/1009/10 & HP/0/B/1009/20 ML20043H5541990-06-18018 June 1990 Forwards Supplemental Info to Tech Spec Rev Request Re Auxiliary Bldg Filtered Ventilation Sys ML20043G1531990-06-15015 June 1990 Forwards Monthly Operating Repts for May 1990 & Corrected Unit Shutdowns & Power Reductions for Apr 1990 ML20044A4491990-06-14014 June 1990 Forwards Public Version of Rev 90-05 to Vol C to EPIP Manual. W/Dh Grimsley 900627 Release Memo ML16152A9821990-06-14014 June 1990 Forwards Public Version of Rev 90-02 to Vol B to Oconee Nuclear Station Epips. W/Dh Grimsley 900627 Release Memo ML20043G3451990-06-0707 June 1990 Forwards Proprietary Response to Request for Addl Info Re Topical Rept BAW-10174, Mark-BW Reload Safety Analysis for Catawba & Mcguire. Response Withheld ML20043G1741990-06-0707 June 1990 Responds to Request for Addl Info Re BAW-10174, Mark-BW Reload LOCA Analysis for Catawba & Mcguire. Correct RCS Operating Pressure Would Be 2,250 Psia as Identified in Table 3-1 ML20043G7171990-06-0606 June 1990 Forwards Population Dose Analysis Summary for Plant Liquid Release Pathways Based on 1986 Release Estimates ML20043G6321990-06-0505 June 1990 Responds to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01.Corrective Actions:Memo Issued Reemphasizing Importance of Frisking & Outlining Frisking Requirement & Personnel Counseled Re Completing Required Documentation ML20043G6281990-06-0404 June 1990 Advises That Corrective Actions Re Departmental Interface Issues to Resolve & Train on Revised Directive Will Be Completed by 900901,per Insp Repts 50-369/89-01 & 50-370/89-01 ML20043E2571990-05-31031 May 1990 Forwards Request for Relief 90-01 from Requirements of Section XI of ASME Boiler & Pressure Vessel Code Re Inservice Insp During Second 10-yr Interval ML20043F4761990-05-30030 May 1990 Forwards Public Version of Revised Crisis Mgt Implementing Procedures,Consisting of Rev 20 to CMIP-13 & Deletion of CMIP-15 & CMIP-17.W/900612 Release Memo ML20043B5691990-05-23023 May 1990 Advises That Responses to Violations Noted in Insp Repts 50-369/90-01 & 50-370/90-01 Will Be Delayed Until 900601 ML20043C0781990-05-22022 May 1990 Responds to Violations Noted in Insp Repts 50-369/90-04 & 50-370/90-04.Corrective Actions:Correct Procedure Adherence Reemphasized to Job Supervisor & Engineering Group Involved in Authorization for Torque Change ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043B9351990-05-16016 May 1990 Forwards Public Version of Epips,Including HP/1/B/1009/15 & HP/2/B/1009/15.W/DH Grimsley 900529 Release Memo ML20043A1041990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Mar 1990 for McGuire Nuclear Station Units 1 & 2 ML20042G8221990-05-10010 May 1990 Forwards Addl Info Re Events Leading to 900509 Emergency Tech Spec (TS) Request Re TS 4.6.1.8,per Ds Hood 900510 Telcon & Requests That Changes Also Be Made to Unit 2 Ts. Proposed TS Encl ML20043A8621990-05-10010 May 1990 Forwards Info for Facility 1990 Refueling Outage Re Steam Generator F* Tubes & Tubes Removed from Svc or Repaired 1990-09-04
[Table view] |
Text
.
ENCLOSURE April 12, 1985 DuxE POWER COMPAhT P.O. mox 33189 cMARWTTE, N.C. 98242
_RAL B. TUCKER m ,,,
(*) * * '
. E FebruShyQ C l$85 g .
4 Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323
Subject:
Report Nos.'50-269/84-31 50-270/84-31 50-287/84-35 50-369/84-36 50-370/84-34 j
Dear Dr. Grace:
)
By. letter dated Dececber 31, 1984, NRC transmitted the Systematic Assessment of Licensee Performance (SALP) report for Oconee and McGuire. The period of assessment was May 1, 1983 through August 31, 1984. A meeting was held to discuss this report on January 8, 1985.
Attached please find our connents on the evaluation. As requested, specific comments have been made in response to the Category 3 rating in the plant operations functional area at McGuire. Also included are comments on the areas of Oconee Licensing Activities and Radiological Controls.
Duke believes that on the whole, this SALP adequately represents the quality l of performance at our stations with the notable exception of the character-ization of McGuire plant operations. As discussed in the attached, we believe that the Category 3 rating of McGuire Plant Operations is not warranted by the facts.
1 l Very truly yours, i
l bN //g Hal B. Tucker ,
HBT: sib Attachment 8507170310 850412 PDR 0 ADOCK 05000269 PDR
- 4 Attachment 1 April 12, 1985 Duke Power Company Oconee Nuclear Station '
Response to SALP Report
. Dated December 31, 1984 Introduction Duke Power Company has reviewed the SALP Report for Oconee Nuclear Station and, in general, endorses the observations and findings made in the report regarding ,0conee 's performance. Overall, the Report accurately and effec-tively appraised Oconee's performance, except in the areas of Licensing activities and Radiological Control. In these areas. (Licensing activities and Radiological Control), the Report assigned a Category 2 and identified weaknesses. Duke's comments, contained herein, addresses the weaknesses which were identified in the report.
Licensing Activities The Report noted weaknesses in the areas where responses were needed from the Licensee regarding amendments to the Technical Specifications and written responses to requests for additional information; and that licensee management attention should be focused in anticipating problems, the scheduling of major issue submittals, and in the reviewing of submittals for their thoroughness, completeness and timeliness. Examples of this cited in the Report are: lll.D.3.4 " Control Room Habitability; Commission audit of all B&k' plants on their status in implementing NUREG-0737 modifications; and Reload Amendments.
Duke has had a history of providing timely and thorough responses to NRC regulatory items. Duke believes that changes in NRC Project Managers as well as in Duke /Oconee licensing personnel may have contributed to cases cited in the SALP Report.
Radiological Controls The Report noted some weakness in Duke's ability to adequately assess non-routine Radiological evolutions at Oconee and in identifying deficiencies ar.d trends as well. The report specifically identified the non-routine radioactive material shipments and potential sources of neutron radiation; as well as the buildup of radioactivity on the turbine building roof and in chetical treatment pond 3 'as examples of the noted weakness in Oconee's Radiological Surveillance and control programs.
Duke management recognizes that additional improvements in Oconee compliance with the regulations can be made and agrees that the violations identified during the evaluation period are not indicative of a programmatic breakdown.
To this end, Duke is pursuing a meeting with the NRC in order to gain a better under.canding of the inspection and enforcement criteria in the Radiological Control area.
Attachment 2 April 12, 1985 McGuire Nuclear Station
~
Response to SALP Report ,
Dated December 31, 1984 Introduction The Plant Operations functional area at McGuire was rated Category 3 in the SALP report. It was specifically requested that Duke advise NRC of actions which are planned to be taken in response to this rating.
Based on the details provided in the SALP report, it appears that this rating is based upon weaknesses identified with procedural compliance, the number of violations, the number of reactor trips, and weaknesses in imple-menting independent verification. Specific examples in these aspects are discussed in the functional areas of plant operations, maintenance, and surveillance. As these areas are inter-related, the Duke response will address these areas collectively.
Incidents Virtually all the violations identified in these areas were the result of plant incidents. Each plant incident is reviewedThe and a root cause. determined program of incident review as well as the appropriate corrective action.
is extensive in that completed incident reports and Licensee Event _ Reports are reviewed by Duke personnel both at the station and by corporate office.
Monthly summary reports are prepared for management review which track the trend of incidents according to root cause. It is the goal of management to reduce the number of incidents that occur not only from a safety perspective but also from an availability standpoint. Incidents at one plant are reviewed through our operating experience program at the other plants.
Contributing f actors to the number of incidents occurring at McGuire include
' the complexity of the plant design, the significant number of activities required to be conducted under procedure, and the relative inexperience of qualifS plant personnel. Duke personnel are encouraged to identify to supervision l
any incidents that may impact safety. The openness of com=unications allows
! Duke to address problem areas in a professional manner without fear of retribution.
For each incident that has occurred, Duke believes that responsive corrective ceasures have been taken. Where Licensee Event Reports were filed, such acti:ns are described therein. Likewise, corrective actions are contained in our Such actions have included revising responses to the Notices of Violation.
procedures involved to. include explicit details to assure proper perfermance of the procedures and to prevent recurrence of the event. Also, personnel have undergone training to-assure an adequate knowledge level of surveillance and
! maintenance activities. <
Corporate Management has discussed with station personnel the importance of procedural compliance. This was initially accomplished in the fall of 1983 and is continually emphasized by Station Management on a routine basis. There s
exists an ongoing program to review and improve procedures associated with tne 7300 Process Control System.
. Attachment 2 '
.
Additionally, Duke continues to supp3rt 3:nsric efforts d2 signed to rolax requirements that "over test" the plant systems. Duke believes that all of these efforts are responsive to the concern related to plant operation.
Independent Verification NRC has also identified independent verification as an area of concern. The particular subject has been discussed several times in the past. The lessons learned from Oconee incidents have been used to develop generic guidance for all Duke stations. Duke believes that the present program is responsive to commitments previously made. We acknowledge the comments made by individual reviewers. However, we believe that our program is reasonable and effective.
While it is difficult to achieve perfection Duke will continue to strive to implement independent verification effectively.
Reactor Trips A few explanatory comments may be helpful in placing the reactor trip fre'quency at McGuire in perspective. First, McGuire is a young plant, having just completed startup testing for the second unit in 1984 Consequently it has been going through its " shake-down" period of system tuning and modification.
A higher frequency of unplanned trips during this period is to be expectsd, followed by decreasing incidence of trips as syste=s are debugged. We are beginning to see this behavior.
During 1982, 1983 and 1984, there were a total of 65 unplanned automatic and manual reactor trips, (as defined in current LER rule), as detailed in the following table:
Number of Reactor Trips 1982 1983 1984 Total McGuire Unit 1 16 15 5 36 McGuire Unit 2 -
11* 18 29 Total 16 26 23 65
- McGuire Unit 2 not commercial for full year Clearly, with suf ficient maturity an improve =er.t in trip frequency is expected and is occurring. Similar behavior is expected on Unit 2, particularly after I
l
'its first refueling outage when a nu=ber of important modifications will be l
implemented.
A second comment pertains to reactor trips caused by personnel error. During
.the period from May 1, 1983 to August 31, 1984, approximately 30% of all i reactor trips were attributed to personnel error, including procedural compliance problems. Approximately 60% of the trips during this period were caused by equipment f ailure or malfunction. These data indicate that personnel errors are not the leading cause of trips and are comparable to industry averages for the las't five years (personnel error - 20%, equipment calfunction - 67%; source -
, 157 0).
Attachment 2 '
April 12, 1985 A third comment partcins to the emph sis plcced upon learning from our trip experience. Following evsry reactor trip at McGuire a thorough reactor trip
. investigation is performed. This investigation consists of three phases:
post-trip review, incident investigation, and transient assessment. The p st-trip review seeks to determine the insnediate cause of the trip, identify abhormal performance of personnel and equipment, and assess the impact on safe plant operation. The incident investigation determines the root cause of the event, evaluates the corrective actions taken, and recommends additional
~
corrective action if needed. The transient assessment ensures that all aspects of the event are fully evaluated and documented, with particular emphasis on.
the transient response of important plant systems. This review expands upon areas of identified abnormal performance, in addition to the reactor trip investigation, a Management Followup of Abnormal Events meeting is held after every reactor trip. At this meeting, the station manager (or his designee) and the station superintendents discuss the event, make sure that the root causes have been identified, and that the right corrective actions are identified and assigned for follow-up.
As a long-term program, periodic trending of reactor trips is performed. Reactor trip data is included in monthly Management Information System summaries and annual Operating Experience reports. A Reactor Trip Reduction Program has been established at the corporate level to evaluate and implement corrective actions based on trend data and items of generic applicability.
In summary, although there have been a significant number of reactor trips at McGuire, station and corporate management have been involved in extensive efforts to reduce recurrences of reactor trips and to obtain maximum benefit from those that do occur. The effectiveness of these programs can be seen in the sharp reduction in reactor trips at McGuire 1 in 1984.
Quality Assurance The Quality Assurance (QA) Department's program for evaluating the operations area consists of periodic audits by audit teams from the general office as well as routine surveillances by site-based QA personnel. This process is effective in identifying weaknesses, and we plan to strengthen this effort by increased staf fing and training in both groups. We agree that there have been some concerns in the past regarding promptness of corrective action; however, manage:ent has taken steps to resolve this issue. Contrary to the findings of the SALP report, we find that there has been a positive trend in the responsiveness by line management to Quality Assurance identified items.
Conclusion The NRC has identified 21 violations and 1 deviation in the three functional areas previously identified. Duke notes that the distribution of these was as follows:
. 5 Violations, 1 deviation denied by Duke.
. 12 identified and reported by Duke via LER's.
. 2 identified by Duke and determined not to be reportable.
. 2 identified by NRC (These were for failure to report events which are more appropriately under Licensing Activities functional area instead of Plant Operations).
1
Attachment 2 , e.
- 5pril 12, 1985 e' 4 It is eles Est d that s:v rcl incid:nts cccurrsd that v2re termed by the inspector as "non-cited" violations, and that 'one Plant Operation Violation Severity III, was in fact classified Severity Level IV by Inspection Report 50-369/84-10, this being the one associated-with the CCP-breaker.
(
Duke bc11 eves that the actions taken in response to the violations have been
- appropriate. Duke management also recognizes that additional impr'ovement in plant operations can be made, and has programs in place to achieve that end. -
Thus, while the record at McGuire is'not perfect, it does not appear to Duke that the level of ' concern which resulted in a Category 3 rating in plant operation is warranted.
As the above indicates, Duke has been very effective in identifying and correcting problems which in itself is an indication of the quality of our plant operations. We feel that our agressive program of self identification, correcting and reporting should be interpreted as a positive indication of quality plant operations.