MONTHYEARML20217L7681999-10-19019 October 1999 Forwards Insp Rept 50-458/99-12 on 990822-1002.Four Severity Level IV Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy RBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams ML20217J3751999-10-15015 October 1999 Informs That Applicable Portions of NEDC-32778P, Safety Analysis Rept for River Bend 5% Power Uprate, Marked as Proprietary Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) IR 05000458/19990071999-10-0505 October 1999 Refers to Util Ltr Re Apparent Violations Described in Insp Rept 50-458/99-07 Issued on 990804 & Forwards Nov.Insp Described Two Apparent Violations Related to River Bend Station Division I EDG RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp ML20212D8901999-09-16016 September 1999 Discusses 6 Month Review of Plant Midcycle Ppr.Advises of Plans for Future Insp Activities.Forwards Historical Listing of Plant Issues,Referred to as PIM ML20216F7881999-09-15015 September 1999 Forwards Insp Rept 50-458/99-10 on 990830-990903.No Violations Noted.Insp Covered Licensed Operators Requalification Training Program & Observation of Requalification Activities 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents ML20211Q7721999-09-0909 September 1999 Expresses Appreciation for ,In Response to NRC 990702 Re Denial of Notice of Violation Cited in Concerning Insp Rept 50-458/98-16.Reply Found to Be Responsive to Concerns Raised in NOV RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted ML20211Q3921999-09-0808 September 1999 Forwards Insp Rept 50-458/99-08 on 990711-0821.One Violation Being Treated as Noncited Violation ML20211Q5541999-09-0808 September 1999 Discusses Meeting Conducted on 990830 in St Francisville,La Re Overall Performance Issues During 990403-0703 Refueling/ Maintenance Outage.Due to Proprietary Nature of Some Subject Matters,Meeting Closed to Public.Attendance List Encl ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211E2071999-08-23023 August 1999 Discusses Insp Rept 50-458/99-07 in Which 2 Violations Were Identified & Being Considered for Escalated Enforcement Action.Response Should Be Submitted Under Oath or Affirmation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept ML20211A9291999-08-17017 August 1999 Forwards Insp Rept 50-458/99-11 on 990719-23.Areas Examined Included Portions of Licensee Physical Security Program. No Violations Noted ML20210T8881999-08-16016 August 1999 Forwards Replacement Pages 9-18 for Insp Rept 50-458/99-09, Issued on 990730 IR 05000458/19980101999-08-13013 August 1999 Forwards Summary of 990805 Mgt Meeting with Licensee in Arlington,Tx Re Radiological Control Problems Noted in Insp Repts 50-458/98-10 & 50-458/99-04.With Attendance List & Licensee Presentation ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210U3751999-08-12012 August 1999 Informs That Info Contained in Presentation, River Bend Station Fuel Recovery Project,Dtd 990622, Will Be Withheld from Public Disclosure Pursuant to 10CFR2.790(b)(5) & Section 103(b) of Atomic Energy Act of 1954,as Amended ML20210Q7691999-08-11011 August 1999 Forwards Request for Addl Info Re Licensee River Bend Individual Plant Exam External Events,Under GL 88-20,suppl 4,dtd 910628 ML20210R4591999-08-10010 August 1999 Ack Receipt of Which Transmitted Plant Emergency Plan,Rev 20 Under Provisions of 10CFR50,App E,Section V.Nrc Approval Not Required,Based on Determination That Changes Does Not Decrease Effectiveness of EP ML20210N1641999-08-0404 August 1999 Forwards Insp Rept 50-458/99-07 on 990530-0710.One Violation of NRC Requirements Occurred & Being Treated as NCV, Consistent with App C of Enforcement Policy ML20210K4641999-08-0303 August 1999 Forwards SE Accepting Licensee 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power Power-Operated Gate Valves, Issued on 950817 ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1351999-07-30030 July 1999 Forwards Insp Rept 50-458/99-09 on 990510-28 with in-office Insp Until 990701.Three Violations Being Treated as Noncited Violations ML20210J9691999-07-30030 July 1999 Discusses 990719 Meeting with Util in Arlington,Tx Re Region IV Staff Findings of Root Cause Investigation Into Fuel Cladding Failures That Occurred During Recent Cycle 8 Operation.List of Attendees & Organization Chart Encl RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL ML20210E9001999-07-23023 July 1999 Informs That as Result of Staff Review of Licensee Responses to GL 92-01,rev 1,Suppl 1 & Suppl 1 Rai,Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20196L0501999-07-0606 July 1999 Informs That NRC Insp Rept 50-458/99-03 Issued on 990519 with Errors in Tracking Numbers Assigned to Seven Noncited Violations & Error Re Actual Location of SRO During Refueling Activities.Revised Pages 2 & 4 Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl ML20196K6851999-06-30030 June 1999 Ack Receipt of & Denial of NOV in Response to Transmitting NOV & Insp Rept 50-458/98-16.Listed Info Documents Results of Review of Response to Violation Re fire-induced Circuit Faults ML20196K0671999-06-30030 June 1999 Forwards Insp Rept 50-458/99-04 on 990412-16 & 28-29.Five Violations of NRC Requirements Occurred & Being Treated as Noncited Violations,Consistent with App C of Enforcement Policy.Meeting Scheduled for 990726 RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld ML20196E0601999-06-18018 June 1999 Forwards Insp Rept 50-458/99-05 on 990418-29.Four Violations Identified & Being Treated as Noncited Violations 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARRBG-45125, Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams1999-10-18018 October 1999 Forwards Voluntary Response to Administrative Ltr 99-03, Preparation & Scheduling of Operating Licensing Exams RBG-45123, Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required1999-09-30030 September 1999 Informs That Error Reported to NRC by GE on 990630 Resulted from Changes to SAFER Code Models Counter Current Flow Limiting (Ccfl) in Upper Part of Fuel Bundle at Upper Tie Plate (Utp).No Changes in SAR or COLR Required RBG-45124, Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl1999-09-24024 September 1999 Suppl to 990907 Response to Violations Noted in Insp Rept 50-458/99-07.Info to Address Specific Requests in 990920 Conference Call Re DG Assessment Completion Dates for Corrective Actions & DG Maint Rule (a)(1) Status,Encl RBG-45122, Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-471999-09-23023 September 1999 Forwards Rev 3 to RBS COLR for Ninth Fuel Cycle, IAW TS 5.6.5 of App a of FOL NPF-47 RBG-45113, Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp1999-09-21021 September 1999 Clarifies Statement Contained in NRC SER for Licensing RBS, Per Error That Became Evident During Plant Fire Protection Functional Insp 05000458/LER-1998-003, Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents1999-09-0909 September 1999 Forwards LER 98-003-02,revising Previous Rept Dtd 981005, Submitted to Clarify Reported Condition & to Incorporate Final Root Cause Analysis & Corrective Action Plan for Event.Complete Rev & No Change Bars Used in Documents RBG-45109, Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted1999-09-0808 September 1999 Provides Comments on Reactor Vessel Integrity Database. Requests That Data Be Corrected as Noted RBG-45095, Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status1999-09-0707 September 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/99-07.Corrective Actions:Fuel Pump Coupling Was Reworked Using Loctite & Division I DG Was Returned to Operable Status ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) RBG-45097, Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves1999-08-31031 August 1999 Requests Approval of Proposed Alternative to Second Interval Inservice Testing Program,Allowing One Time Extension of Test Interval for 20% of Full Set Main Steam Line Safety Relief Valves RBG-45094, Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation1999-08-25025 August 1999 Responds to NRC Re Violations Noted in Insp Rept 50-458/98-16 Between 990720 & 0807.Corrective Actions:River Bend Will Submit Changes Associated with Lcn 15.06-006 & Accompanying Evaluation ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 RBG-45093, Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept1999-08-17017 August 1999 Forwards FFD six-month Program Performance Data Rept for Rept Period 990101 Through 990630,containing Statistical Data & Trend Analysis Compiled by FFD Dept RBG-45072, Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL1999-07-23023 July 1999 Submits Final Response to GL 94-02, Long-Term Solution & Upgrade of Interim Operating Recommendations for Thermal- Hydraulic Instabilities in Bwrs. Ltr Documents Completion of Reporting Requirements Contained in Subject GL RBG-45073, Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl1999-07-20020 July 1999 Requests Withholding of Info Presented in 990719 Meeting of EOI & NRC Region IV Re Recent Anomalous Conditions Found During Insp of Fuel Bundles During 1999 RFO at Rbs.Affidavit Executed IAW Provisions of 10CFR2.790(b)(1),encl RBG-45071, Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl1999-07-19019 July 1999 Forwards Rev 2 to River Bend COLR for Ninth Fuel Cycle,Iaw TS 5.6.5 of App A.Affected Pages of GE Suppl Reload Licensing Rept, May 1999 Submittal & List of Effective Pages,Encl 05000458/LER-1999-002, Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 11999-07-15015 July 1999 Forwards LER 99-002-01,IAW 10CFR50.73.Supplemental Rept Details Root Cause Analysis for Reported Condition. Commitments in Document Annotated on Commitment Identifier Form,Attachment 1 ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl RBG-45047, Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output1999-06-29029 June 1999 Informs of Util Expectation to Complete Review of Final Rept Supporting Power Uprate & Submits TS Changes in Jul 1999,per Licensee to NRC Re Increasing Power Output RBG-45048, Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept1999-06-29029 June 1999 Forwards Rev 1 to Rbs,Cycle 9 COLR, IAW TS 5.6.5 of License NPF-47.GE Suppl Reload Licensing Rept,Dtd May 1999, Is Included.Without GE Rept ML20196H5171999-06-21021 June 1999 Requests Withholding of Info Being Presented in Meeting of Entergy,General Electric & NRC Staff.Licensee Requested Meeting with NRC to Present Info on Recent Anomalous Conditions Found During Insp of Fuel Bundles.W/Affidavit RBG-45035, Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld1999-06-21021 June 1999 Requests That Encl RBS Fuel Recovery Info Be Withheld from Public Disclosure,Per Provisions of 10CFR2.790(a)(4).Info Is Being Presented at Meeting to Discuss Recent Anomalous Conditions Found.Proprietary Info Withheld 05000458/LER-1999-012, Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form1999-06-21021 June 1999 Forwards LER 99-012-00,IAW 10CFR73.Commitments Contained in Document Identified on Commitment Identification Form 05000458/LER-1999-011, Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-06-0909 June 1999 Forwards LER 99-011-00 for River Bend Station,Unit 1,IAW 10CFR50.73.Commitments Identified in Rept,Encl 05000458/LER-1999-010, Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl1999-05-28028 May 1999 Forwards LER 99-010-00 for River Bend Station,Unit 1 IAW 10CFR50.73.Commitments Identified in Rept,Encl RBG-45021, Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in1999-05-26026 May 1999 Informs That Cycle 9 Operation Will Remain within MCPR Safety Limits Approved in Amend 105 to TS Issued by NRC in 05000458/LER-1999-009, Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form1999-05-24024 May 1999 Forwards LER 99-009-00 IAW 10CFR50.73.Commitments Contained in Ltr Are Identified on Commitment Identification Form RBG-45017, Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl1999-05-14014 May 1999 Informs NRC of Addition of ASME Boiler & Pressure Vessel Code,Section Xi,Code Case N-496-1 to RBS Inservice Insp Program.Commitment Made by Util,Encl ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 05000458/LER-1999-007, Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 11999-05-10010 May 1999 Forwards LER 99-007-00 IAW 10CFR50.73.Commitments Identified in LER Are Noted in Attachment 1 05000458/LER-1999-006, Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 11999-05-0606 May 1999 Forwards LER 99-006-00 Re Unplanned Automatic Standby Svc Water Initiation,Due to Procedure Inadequacy.Commitments Identified in Rept Noted in Attachment 1 05000458/LER-1999-005, Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 11999-05-0303 May 1999 Forwards LER 99-005-00 IAW 10CFR50.73(a)(2)(i).Commitments Identified in LER Are Noted in Attachment 1 RBG-44993, Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl1999-04-30030 April 1999 Forwards RBS Annual Individual Monitoring Rept for Jan-Dec 1998,per Requirements of 10CFR20.2206(b).File Info Listed. Without Encl RBG-44998, Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 9802241999-04-30030 April 1999 Informs of Missing Documentation Re Examination Results Reported in RBS Owners Activity Report Forms Submitted to NRC on 980224 ML20206E7811999-04-29029 April 1999 Proposes Alternatives to Requirements of ASME B&PV Code Section XI,1992 Edition,1992 Addenda,As Listed.Approval of Alternative Request on or Before 990915,requested 05000458/LER-1999-003, Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 11999-04-23023 April 1999 Forwards LER 99-003-00,per 10CFR50.73.Commitments Identified in Rept Are Noted in Attachment 1 RBG-44968, Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC1999-04-15015 April 1999 Submits Addl Info Re 981008 LAR 1998-02 Re Implementation of Bwrog/Ge Enhanced Option I-A (EI-A) Reactor Stability long- Term Solution.Clarifies Certain Aspects of Proposed Ts,Per 990406 Telcon with NRC RBG-44965, Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl1999-04-0808 April 1999 Responds to 990324 Telcon RAI Re SLMCPR Calculation Method for RBS Cycle 9 Slmcpr,Per LAR 1998-15 Re Change to TS 2.1.1.2, Reactor Core Safety Limits. Proposed TS Pages, Encl RBG-44959, Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage1999-04-0808 April 1999 Withdraws 981120 LAR 1998-20,allowing Adjusting Control Pattern for Plant Startup If Outage Had Occurred Before Planned Refueling Outage.No Plant Outage Was Conducted & Plant Is Now in Eighth Refueling Outage ML20205F1781999-03-31031 March 1999 Forwards Consolidated Entergy Submittal to Document Primary & Excess Property Damage Insurance Coverage for Nuclear Sites of Entergy Operations,Inc,Per 10CFR50.54(w)(3) RBG-44939, Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr1999-03-31031 March 1999 Forwards Rbs,Unit 1 Annual Occupational Radiation Exposure Rept for 1998, Per TS 5.6.1.Rept Consists of Tabulation of Exposure for Personnel Receiving Exposures Greater than 100 Mrem Per Yr ML20196K7101999-03-26026 March 1999 Submits Reporting & Recordkeeping for Decommissioning Planning,Per 10CFR50.75(f)(1) RBG-44899, Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed1999-03-25025 March 1999 Provides Notification of Termination of Licensed Operator, AA Rouchon,License OP-42416-1,due to Resignation.Reactor Operator License Data,Listed ML20204G8701999-03-15015 March 1999 Responds to NOV Described in NRC Correspondance to Util ,expressing Disappointment in NRC Determination That AD Wells Deliberately Provided Incomplete & Inaccurate Info to NRC During Meeting on 971015 RBG-44925, Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations1999-03-15015 March 1999 Responds to NRC Re Violations Noted in Investigation Rept 4-97-059.Corrective Actions: Mgt Expectations for Communicating with NRC Issued to Site Personnel on 980212,by RBS Vice President,Operations RBG-44924, Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check1999-03-0505 March 1999 Informs That Util Response to NOV Re Investigation Rept 4-97-059,will Be Issued by 990315,as Extended by NRC Ltr .Encl Check for $55,000 Is for Payment of Civil Penalty IAW Instructions in .Without Check RBG-44912, Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air1999-03-0303 March 1999 Responds to Violations Noted in Insp Rept 50-458/98-13. Corrective Actions:Matls & Training Were Provided to Expedite Implementation of Existing Procedural Guidance to Supply Compressed Air RBG-44904, Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 9912161999-02-25025 February 1999 Informs NRC of Date Change Re Commitment Made in Response to NOV 50-458/98-05-01.New Commitment Date 991216 RBG-44384, Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition1999-02-11011 February 1999 Submits Response to Fuel Cladding Defect Issues Raised in 10CFR2.206 Petition.Clear Technical Basis Exists in Info Provided by River Bend Station to Deny Petition ML20203C4201999-01-25025 January 1999 Submits Denial of NRC Request for Advance Info Re Concerns Raised by Ucs in 10CFR2.206 Petitions on River Bend & Perry Plants.Petitioners Were Not Required to Provide NRC with Info in Advance of Informal Public Hearings 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEARRBG-33517, Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed1990-09-10010 September 1990 Responds to NRC Re Violations Noted in Vendor Interface & Procurement Team Insp Rept 50-458/89-200. Corrective Actions:Maint Instruction Index for Diesel Engine Reviewed RBG-33466, Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range1990-08-30030 August 1990 Responds to Deviations Noted in Insp Rept 50-458/90-16 on 900709-19 Re Suppression Pool Water Level.Corrective Actions:Operator Aids Will Be Developed to Inform Control Room Operators of Actual Instrument Range RBG-33460, Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.211990-08-28028 August 1990 Forwards Certified Cash Flow Statements for Guarantee of Funds in Event of Retrospective Call Under Secondary Financial Protection Program,Per 10CFR140.21 RBG-33496, Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment1990-08-28028 August 1990 Advises That KT Allbritton No Longer Needs to Maintain License for Facility Due to Termination of Employment RBG-33450, Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-9003011990-08-28028 August 1990 Forwards Rev 3 to River Bend Station Updated Fsar. Rev Covers Period 890301-900301 RBG-33424, Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 9009291990-08-22022 August 1990 Requests That Proposed Tech Spec 3.0 & 4.0,when Approved,Be Issued as Effective Immediately W/Implementation to Be Completed by 900929 RBG-33372, Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified1990-08-10010 August 1990 Forwards Semiannual Rept on fitness-for-duty Program Performance Data for 900103-0630,per 10CFR26.71(d).No Weaknesses in Program Identified RBG-33310, Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages1990-08-0101 August 1990 Responds to NRC Re Exercise Weaknesses Noted in Insp Rept 50-458/90-06.Corrective Actions:Computer Clock Synchronized to Correct Time & Logic Changed for Making Location Addresses in Retransmission of Messages RBG-33300, Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting1990-07-30030 July 1990 Forwards Schedule for Submittal of Repts Re Reactor Physics Methods & Reactor Transient Analysis Methods Rept,Per 900712 Meeting RBG-33294, Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank1990-07-26026 July 1990 Forwards Decommissioning Trust Agreement for River Bend Unit 1 & Nuclear Decommissioning Trust Fund Agreement Between Cajun Electric Power Cooperative,Inc & Hibernia Natl Bank RBG-33196, Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-161990-07-13013 July 1990 Forwards Rev 0 to River Bend Station,Cycle 3 Core Operating Limits Rept Jul 1990. Use of Core Operating Limits Rept in Lieu of cycle-specific Parameters in License Amend Request Approved W/Amend 42 to License,Per Generic Ltr 88-16 RBG-33150, Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed1990-07-0202 July 1990 Responds to NRC Re Violations Noted in Insp Rept 50-458/89-11.Corrective Actions:Implementation of New Computerized Tagging Sys Being Developed RBG-33143, Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 19901990-06-29029 June 1990 Addresses Progress of Procurement & Evaluation Activities for Sys to Meet Reg Guide 1.97 Neutron Monitoring Requirements.Bid Spec to Incorporate NRC & BWR Owners Group Guidance Will Be Issued Prior to Fourth Quarter 1990 RBG-33132, Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs1990-06-28028 June 1990 Suppls Response to Generic Ltr 89-10, Safety-Related Motor- Operated Valve Testing & Surveillance. Util Will Reverify Switch Settings on Initial Surveillance Interval of 5 Yrs RBG-33120, Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads1990-06-26026 June 1990 Responds to 900621 Request for Addl Info Re Effects on Containment Dynamic Loads Which Will Result from Increasing Suppression Pool Temp from 95 F to 100 F.Original Design Basis of 100 F Included in Steam Condensation Loads RBG-33114, Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon1990-06-26026 June 1990 Requests Withdrawal of 900202 Application for Amend to License NPF-47,revising Div I & II Diesel Generator Crankshift Insp Scheduling,Per 900529 Telcon RBG-33113, Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License1990-06-26026 June 1990 Requests Implementation of Generic Ltr 87-09 Wording for Bases for Spec 4.0.3 Re Reporting Requirements of 10CFR50.73 for Missed Surveillances to Enable NRC to Continue Review of 880930 Application for Amend to License RBG-33100, Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 19901990-06-22022 June 1990 Requests Waiver of Compliance W/Tech Spec 3/4.6.3.1 Until Exigent Processing of Tech Spec Change Request LAR 90-08 Completed.Change Revises Max Temp for Suppression Pool to 100 F to Avoid Limiting Plant Operation in Jul & Aug 1990 ML20043G2211990-06-14014 June 1990 Responds to 900509 Request for Addl Info Re 900209 Response to Violations Noted in Insp Rept 50-458/89-41.Procedure Being Developed to Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys ML20043G8191990-06-12012 June 1990 Forwards Rev 5A to Pump Valve Inservice Testing Plan,For Review.Rev Provides Addl Info & Clarification for Requests for Relief Noted in Rev 5 ML20043E6531990-06-0606 June 1990 Forwards Addl Info Re 880930 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09 Requirements Re Preplanned Use of Addl Operating Flexibility ML20043F9801990-06-0606 June 1990 Forwards Response to NRC 890731 Request for Addl Info Re Util 890731 Application for Amend to License NPF-47 to Implement Generic Ltr 87-09.Justifications for Use of Proposed Tech Spec 3.0.4 Will Be Submitted Separately ML20043D5591990-06-0101 June 1990 Provides Status of Actions Re Insp Rept 50-458/89-45 Which Dealt W/Dual Coil Solenoid Operated Valves Used to Control MSIVs ML20043D5421990-06-0101 June 1990 Forwards Addendum to River Bend Station - Unit 1,Semiannual Radioactive Effluent Release Rept,Jul-Dec 1989. ML20043D5401990-06-0101 June 1990 Provides Update to 900125 & 0315 Responses to Insp Rept 50-458/89-200.Util in Process of Performing Retrofit Review of in-stock Items Purchased Between 850101-900101 ML20043D2371990-05-31031 May 1990 Provides Suppl to 890929 Response to Violations Noted in Insp Rept 50-458/89-31.Safety Tagging Administrative Procedure Being Revised to Make Clearance Program Easier to Understand & Follow ML20043C8011990-05-29029 May 1990 Forwards Rev 12 to Physical Security Plan.Rev Reflects Current Activities of Plant Security Programs.Rev Withheld (Ref 10CFR73.21.) ML20043B4231990-05-21021 May 1990 Forwards Rept Re Investigation Involving Unsatisfactory Performance Test Result by Dhhs Certified Lab Under Contract to Util to Perform Drug Screen Testing Under 10CFR26, Fitness-For-Duty Program. ML20043A4271990-05-14014 May 1990 Forwards Authorization of Util Board of Directors for Tf Plunkett & Wh Odell to Sign Ltrs to NRC Transmitting Amends to OL or Responses to Insp Repts ML20042G7031990-05-0909 May 1990 Responds to NRC 900405 Ltr Re Weaknesses Noted in Insp Rept 50-458/90-06 on 900220-23.Corrective Action:Software in Simulator Changed to Duplicate Software in Control Room & More Training Time on Computers Given to Operators ML20042F9741990-05-0707 May 1990 Responds to Violations Noted in Insp Rept 50-458/90-02 on 900122-26.Corrective Actions:Electrical Power Removed from Valves,Safety Assessment of Spurious Opening Performed & QA Performed on Energized Valves ML20042G2521990-05-0404 May 1990 Responds to Generic Ltr 89-19, Request for Action Re Resolution of USI A-47, 'Safety Implication of Control Sys in LWR Nuclear Power Plants.' ML20042E3781990-04-0606 April 1990 Responds to Violations Noted in Ofc of Investigations Rept 4-88-027,per Enforcement Action 90-043.Corrective Actions: Util Auditing self-screening Contractor Programs to Assure Compliance & Audit Will Be Evaluated for Acceptability ML20042D8351990-03-30030 March 1990 Submits Supplemental Info Re Util Response to Station Blackout Rule & Advises That Results of Plant Evaluations Demonstrate Ability to Cope W/Station Blackout for Proposed 4 H Duration W/O Reliance on Ac Power Sources ML20042E3501990-03-30030 March 1990 Forwards Evaluation of Unsatisfactory Performance by Dhhs Certified Lab Performing Drug Testing ML20012F1571990-03-28028 March 1990 Requests Extension Until 900601 to Submit Changes to Facility Tech Specs Re Leak Detection & Inservice Insp Program,Per Generic Ltr 88-01 ML20012F1551990-03-28028 March 1990 Suppls 890411 Response to Violations Noted in Insp Rept 50-458/86-04.Operations QC Instructed QC Planners & Lead Inspector to Include Hold Point of Electrical Maint Work Request for Category I Electrical Equipment Panels ML20042D7041990-03-21021 March 1990 Forwards Results of Ultrasonic Testing Conducted on N4A-2 Feedwater nozzle-to-safe End Weld During mid-cycle Outage at Plant.Circumferential Indication Identified in Buttered Area on Safe End Side of Weld During Second Refueling Outage ML20012E0001990-03-20020 March 1990 Forwards Marsh & Mclennan 900313 Ltr Containing Summary of Property Insurance Coverage for Facility,Per 10CFR50.54(w)(2) ML20012C7901990-03-16016 March 1990 Forwards Response to Violations Noted in Insp Rept 50-458/89-39.Response Withheld (Ref 10CFR73.21) ML20012C9931990-03-15015 March 1990 Forwards Duke Engineering & Svcs,Inc 900105 Ltr to BC Fichtenkort Re Proposed Crankshaft Insp Variation & Recommends Variation Be Presented to Clearinghouse Members at 900111-12 Meeting ML20012C7881990-03-15015 March 1990 Provides Updated Status for Corrective Actions Being Taken for Discrepancies Identified in Insp Rept 50-458/89-200. Thirty-six Items identified.Twenty-eight Items Completed. Three of Eight Remaining Items Require Evaluation of Stock ML20012C0381990-03-0909 March 1990 Advises That Senior Reactor Operator License 43188-1 & Reactor Operator License 42087-2 for a Middlebrooks & DG Looney,Respectively,Expired on 900105 & 900201 ML20012A4431990-03-0101 March 1990 Requests Addl Clarification to Prepare Response to Generic Ltr 90-01 Re Survey of Time Spent by Key Nuclear Power Plant Managers in Responding to Various Operational Insps & Audits ML20012B3001990-03-0101 March 1990 Forwards Fitness for Duty Program Rept 90-F-02 Re Investigation of Unsatisfactory Performance Test Result by Certified Lab Under Contract to Util to Perform Drug Screen Testing,Per 10CFR26 ML20012A9161990-02-28028 February 1990 Forwards Response to Inspector Followup Item Noted in Insp Rept 50-458/89-42 on 891113-17.Corrective Actions:Rev to Procedure EDP-AA-10 Re Issuance of Training Matrix on Semiannual Basis Will Be Issued to Remove 2-yr Rereading ML20011E8431990-02-0909 February 1990 Responds to Violations Noted in Insp Rept 50-458/89-40. Corrective Actions:All Prestaged Matl Removed from Containment & Radiation Protection Personnel Cautioned on Placement of Matl on 95-ft Elevation of Containment ML20011E6741990-02-0909 February 1990 Responds to Violation Noted in Insp Rept 50-458/89-41 on 891101-15.Corrective Actions:Procedure Which Would Provide Guidelines for Future Troubleshooting of Recirculation Flow Control Valve Sys Being Developed ML20011E1531990-01-29029 January 1990 Provides Currently Identified Outage & nonoutage-related Activities to Update NRC of Util Licensing Activities in Order of Priority ML20006C0061990-01-25025 January 1990 Forwards Notification of Nuclear Liability Insurance Coverage for Facility 1990-09-10
[Table view] |
Text
-
GULF STATES UTILITIES COMPANY RIVER BEND STATION Pos? 0FFict 80x 220 ST. FRANCISVILLE, LoutSIANA 70775 AREA Co0E 504 635-3237 387-4257 June 12, 1985 RBG 21276 File No. G9.5 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission hashington, D.C. 20555
Dear Mr. Denton:
River Bend Station - Unit 1 Docket No. 50-458 Enclosed for your review is the Gulf States Utilities Company (GSU) addi-tional information requested by members of your staff to confirm qualification of the River _ Bend Station (RBS) Transamerica Delaval, Inc.
(TDI) Standby Diesel Generators. Attachment 1 identifies the concerns raised and provides an appropriate response which meets the delineated conditions for approval of the TDI crankshafts for 3130 kw.
Sincerely, J. E. Booker Manager - Engineering, Nuclear Fuels S Licensing River Bend Nuclear Group RH/JWL/ebm Attachments (4)
'[ Q0
' 40 8506270500 DR 850612 g ADOCK 05000458 PDR i i
ATTACHMENT 1 The following information has been identified by Dr. Berlinger of the NRC Staff.for satisfactory approval of the RBS TDI crankshafts for a loading to 3130 kw:
- 1. Submit a report on FEV's independent evaluation of the RBS TDI crankshaft, signed by Dr. Franz Pischinger.
- 2. Address governor speed control to prevent operation near the 5th order critical.
- 3. Address monitoring or surveillance provisions to ensure pressure balance remains acceptable.
- 4. Perform a liquid penetrant (LP) inspection of crankpin fillets and oil hole entrance region of crankpins 5, 6 and 7 on the "A" Diesel. Crankpin oil holes on cylinders 5, 6 and 7 are to be eddy current tested (ET). Anf indication by LP inspection will be backed up by ET.
- 5. Inspection to be witnessed by a representative of Battelle Paci-fic Northwest Laboratories (PNL).
The response to each item is as follows:
- 1. See Attachment 4 for a copy of the FEV Report entitled " Operation-al Safety of TDI DSR-48 Emergency Diesel Generator Crankshafts at River Bend Station, Gulf States Utilities", dated June 1, 1985 and signed by Dr. Franz Pischinger.
- 2. See Attachment 2 for the combined response on Governor Speed Control and Cylinder firing pressure control.
- 3. See Attachment 2
- 4. See Attachment 3 for copies of three inspection reports, M5000501, M5000503 and M5000510. These inspections were conducted from June 4 to June 8, 1985 and confirm there is no evidence of fati-gue crach initiation after 330 hours0.00382 days <br />0.0917 hours <br />5.456349e-4 weeks <br />1.25565e-4 months <br /> of operation.
- 5. The inspections contained in Attachment 3 were witnessed by and a copy of the inspection report was given to Mr. S. J. Foreman of PNL.
l l
l L-
1 ATTACilMENT 2 This attachment contains the detailed response to Items 2 and 3 of Attach-ment 1.
NRC Staff Requirement: Describe means to control engine speed (frequency) and cylinder firing pressure to avoid increased crankshaft torsional stress from the fifth order resonant speed.
Response
The torsional stress contribution from the fifth order critical speed is addressed in " Evaluation of DSR-48 Emergency Diesel Generator Crank-1 shafts at River Bend Station," Failure Analysis Assosiates Report No.
FaAA-85-5-10 transmitted to Mr. H. R. Denton (NRC) from Mr. J. E. Booker (GSU) on May 16, 1985(GSU Letter No. RBG-21,025). The magnitude of the fifth order torsional vibration is quite small and there are six other orders with greater magnitude. Even though the fifth order speed is close to the operating speed, the fifth order is excited only by variations in combustion pressure from cylinder to cylinder. Such variations are readily detected by the exhaust thermocouples installed at each cylinder.
The following operating and maintenance practices will be adopted to pre-vent sustained operations under conditions of cylinder unbalance and over-speed:
- 1. A caution statement will be added to the operation and surveil-lance procedures from the Division I and Division II diesel genera-tors.
" Avoid continuous operation between 453 and 457 RPM (60.4 to 60.9 liz) . The crankshafts for the Division I and Division II diesels have a critical speed at 455 RPM. Crankshaft torsional stresses may be increased if the diesel generator operated at 455 RPM and cylinder firing pressures are unbalanced.
During operation, verify exhaust gas temperatures are within t 50F of the average for all cylinders. Variations exceeding this range for any cylinder should be investigated by Mainten-ance."
- 2. Exhaust gas temperature measurements for each cylinder will be recorded monthly, and cylinder firing pressures will be recorded
, quarterly. -Trend analysis will be performed to detect changes in parameters indicating a need for maintenance of fuel injection equipment.
i
- 3. Station Operating Procedures S0P-0053, " Standby Diesel Generator and Auxiliaries," includes the requirement to monitor and main-tain generator frequency within 60 Hz 3 0.2 Hz.
1
, , y . - . .
n-, .
ATTACHMENr 3 This attachment contains three inspection reports, M5000501 (10 pages), M5000503 (8 pages) and M5000510 (8 pages), in response to Itan 4 of Attachment 1.
l l
1 Tl 58'H t ATONE E WE85TER ENGINEERING JRPORATION sn / or /B
,; QUALITY ASSURANCE INSPECTION REPORT TYPE- A QA7 ,,c7_
. lilihs DESCRIPTION N in sumasa amor onLv seveono Sv. caos site Location coes a cat
, elm S:0:0:o'5: 8:/ ' ' '
i is 1 ElaIE as
'N s.: G 'I ' N ' E l lE'G'Sl i. ao na lM:g:0 :5 ',
as l t
- rve .= se evac =&ss cana tot size umat s sirs no/ovv unsat itsu si
.; F 12: 4: 4: 7: 0: 0'. . : : 1 11: : : : I If: : : : 1 10: : : I #e o
an u ..- .. .. .. u a .o u it.
C00E/CLAAS l=I f l A L $ 40 oar ya i L.,.; :1 insercriou assui.Ts: Sb4U Id :31 efABla lo:' 8:5
- . .. .. u u .....,u.s .. .0:5
.rs ,.
utia'" Eons '"'"*" "'"'""" ;
eens c=4u ao/snoe onosa no eve.utLea eons
?
4 Qe 10:0'p: 0 :0 l _ uk6Em snaa8E / loc ATiois A
. 6. 65 l : :
as El I I' 55 d as L T E hot - r 55 3 il o.' 0: 0:6:5 lil . 151 l*l lol 181 l'l ' ' '
g u .. .. .. .v s. .: u er ei u a er r.
s d
6 hs AT'L /to ue P es t 8e f peo.. 1 CR u sites ano asaf'L/geuspusset esos. 3 0a u p I E f= 3 3 4 :1A: ' l
. l . . I i
l QI . 33
.toI Qa QSS. l. 35 .toI Qa Qi 'Q G7 '.. ..'9 A4 atSu'T 0* "O/87' C8
{'d '.*L'jM 8 8
AffR Coos ATTaisuTES AE SPoseS IGILIT v ufe547 "N&' 'o' "o'A 1,,,,'r,0M"&',
summaa? Ei.0CA y,, CON Wl0) SITE CONDITIONS S a-
,,g , , , , T .9 O TESTS AND INSPECTION 5 . .
-n. . . .
t,*//, rif*r't!!
_ .o. a . .
y . . . --
3a .,. - - -
- )'
>1 I, {chito far cuanktss no purserops mustss au stain < mnavra xes.
. . oc asinspection att ersus sss
] A. b TLH0Ll3ClH1 fEnesdAHf /M.shl'f60H wAs fedfodhte ed TnK l'AnHK9'N B/L NdLK naer Anon von "sa cunain Sarisracroar Sie ms % ru umr.
SIG/ INiT I AL E DAf a
$ koroerste A ctuottscint PfMgrandt 18.stcaikH DH rnt 3 A .
- c 4 M pin At-Enfl Y .
sag ongga no rkstrs.OnstcHg Liwat olstonfinairr sens fouwo.Sna tosa D nl. nroer. N& '
. . . one im/nav.
IN0stnytcN AJa$ onSaGuf 7.1 firL ATTENf/ M LV $360 odor. Pufd3ffroM
- fkb 4GA.S Kdendsfil y to tarom a roita a copy cuaaur ks,ur, , , ,,,, y,;, pu, o, o,,,y,,,, ya ,,,,
Rusaw roer ran is ao cuea at run7 nua ano miso em sa loka,y segnogsgno/nsv.
k /CMaffeur ffidattstgary j)1p,ggy,bg g,tAS ggygggg,iggy,jgg($$ppppgyA9(rCS$b.
9
- 4. Vish raar a toor t, m.r> ixs,,g go,e us ,,cuosm ,en. ras cssx rst os. ** c ** * *** * *- ('en o*s )
hKLs er *SA cru',<><p. , Sir FAR papr p61 '7raaa *fo F/,
i
"*If2'lNI6fdhi i
REV B CHG O
, 2WA"' ' '
'"#"'."L f'", . = c o =o . "L*"hll' TP .I".'E'm'?f iv.. =en i - - navr .sas A5 !: I l: I ', I l I ll" l l , . ll .
J 7
. i, s. . is
.a.11 n :; n io .= ,a
- 1 :
.= .=
, _ ma aa va 1
- @ l l l l' ll . I'l ' I I
- I ~ ll I'I 15
~ u neviews. sv namAnas
$!DR "5A Cruern i
i
,________w. ___ _ _ - - . - - +-
-- s
ff.fd00E0I
. &c.s *.2 oe/o STONE f.WESSTER ENGINEERING CORPORATION RECORD OF LIQUID PENETRANT EXAMINATION v 4 8.
Tv P s (ca.... .rs 6..r. . a .. .resi..co. . rs. o.
MATERIAL s 5 On $1ca Q uOutTAT O ,.n 0 ,ure O 8.v .. ,* ," ' $,' ' * " O caer E .... . O n u e. O r .. ?
m INSPECTION MOLO PoiN T ( soer. nema 6, &
COE0m Q..ci.e. O...... O '.'s....es. O er. '"*"'"'"' $
rm '
TEuPERATURE PROCEcuRE muuSER SPECIAL TESTINS CON 0ifl0N PROCEDURE N/A ., 9 $ RH/ C /O N/A
.a mot uv ene so* -iss., , es. / new. / cae. NO INSPECTION M ATERI ALS BRAND DESIGN Afi ON SATCM N O. .
i sca-estaess DUAL- CHEK DE-60 f/fpy E t re me rnaar DUBL-CHEK RC-65 gggp [ gk7.
tout irise ame/cm asmovea DUBI, CHEK DR-60 gjfpp j$
.os,esones DUBL-CHEK D-100 g/g pg &a e ecs, case.ma7 ion cuaman DUBL-CHEK DR-6_0 gg jy {
o saETCM OA CTMER DETAIL. USE OTMER SiOE IF NECESSARY. gE
- = 0
/ 3 oP!:
2 e
3 si h T- @
0/6dur si
\ a Nh uso av ,au, n,n m saw REPORT SELow TMOSE INotCATIONS OSSERVED AND TME PERTINENT ya7 f
EVALUATION 6"r',[",yof" RE0uiRED. = MERE AcciTiON AL SPACE iS RE0uiRED uSE LO C ATIO N 56ZE ACTION g8 i
, g$y DESCRIPTION (ACCEPT / REJECT AND COMMENT AS NECESSARY) i 2
/kn , fk 5
1 U o 5
. a 3
i CRITERI A APPLICAAE AL6I. --- m- C00E.YE AR. ADDEND A AND PARAGRAPM NUMBERS C{pcz g.pg, jpp i.
l ATTEST ..... ....
///h8,A E NW I u...asu ....... 6 a. 6 ..n
fjggoosot fa,13elo STONE & WESSTER ENGINEERING CORPORATION RECORD OFLIQUID PENETRANT EXAMINATION T y e t (... ... ., 6, n.i.a .. .r e t . ... . n .. .
MATERIAL s 3 Cusw sua %i
.E0 E,R, a.. a..,. a e.,-.. ";cy;c" a .. ., e . ... a .. .. o .,... . t f'e%29 INSPECTION MOLO P0lm T ( a.e,, as. 6, s Cn"a%N g .. . . . . . . o...... a tt........ a .... '---'a.a=>
,m TEMPERATURE PROCEDURE NUMBER SPECIAL TESTING CON 0lfl0N PROCEDURE N/A ,, hkRB/ C / O NO N/A ir .. , i . e .c c . . .. . . . , es... / e sv. / ..e.
INSPECTION MATERI ALS BRANO DESIGN Afl 0 N SATCM N O.
DUdL- CHEK i *.a-etta.s.
Let. ate.a, DUBL-CHEK DR-60 RC-65
$/6 Pf g/gj/g 1%g at.w..irise a../cmas..vsa DUBI,-CHEK DR-60 S/g pf a li
..sve6.ese
. eest :a.i.ati.e c6t..ta DUBL-CHEK DUBL-CHEK D-100 DR-6,0 g/g, pg ygpy {2 y{
j o SsETCM OR OTNER DETAIL USE OTHER 510E IF NECESSARY. , g. g g, y ga '
NSA Oh*W 79 Cm.Gru <Y L
~
3 i , b 1
! At.Ekiff hin!! .qSt} }6 ;
J g
\ '
)
cwa-u Ac.funty l
j (sWt '
s ..- '
I Y N 4U 58 ,
- CMMKPin Ac. Essay o' I
~
fthsf {; l N / q ;; ;
OSED llLitAYiM7 Atk87 lYdra M&s " CDOSC sue 9/1d d l REPORT BELOW TMCSE INDICATIONS OSSERVED AND TME PERTINENT 7 j EVALUATION b"r',"' E,yDf" "E*u'""D ""E"' 'DD'"0" AL : PACE iS RE0uino ust g '
! 3 rg ACTION D LOCATION DE S CRIP TION
,gg g (ACCEPT / REJECT AND COMMENT AS NECES$ ARY)
I h Y " Leak /thry kgjgey .
un
, 5
- "l
% i s 5 !!
. ki APPLICA8LE CODE,YE AR, ADDEND A ANO PARAGRAPM NUMSERS I CRITERI A '
-A= Ell ^- E*!PCR &-23,I84A f l
ATTEST ##8.24 X Md' I
.....ai........... ..... ..t. :
Mf?00501 N D E 1 1.1.1 1 i d4 f M/O Pogo 1 of l. f AS W late $ EDDY CURRENT EX AMIN ATION RECORD l
?
Site IU[Y Ibf He Il}UClt O # $&rW gage b " T" Q T l I$ Rev. No. Q Job No. 006 S Record No. A TOCOC-DO2 NDE Procedure No. i Recording Criteria SIf Or d C- O cf un Component inspected C*'h bde// Component No. 7b/0 3h /d68 # 8(3-/A r Description of Component Of<I/ d2 H(** b ' Material G 6en $[/ .s / i i
Specitic Enamination Area CrQ H b t0tE ht l ff f { o u t. v M o r l u ol In a rtes ed ;
Pens w 4 r - .l. a . 4 rk Material: O Worked O Welded LTC a s t Surface Condition: O Machined (As Fabricated 0 Cround O Other Geometry: O Pipe O Plate dod O Other Cleaning Technique: O Wire Brush O Grind (Other O F 4 s( v I g Recordable Part or Magnitude of Length of Weld No. Yes No Indication Indication l Location ; Remarks I l Lemm Gd a l I i C,lta t H I -
6cJs<a sd I d - I -- ! - 43a R*rda s /r _7.s e/i c . S evtj i
N I i l N I I i l
\ l l t i
l Ni i i i N I i t
i i % l i l N i i I i e f l
! ' I L i l l .s i I l Sm i I l '% 1 i i i i i l 1
- i ,
N Attached Documents: O Continuation Sheet O Supplementary Sheet ca +/ # sun #
D P otos O Photo Log CT0ther c ,66.-
,g,, g, jf,f g,,,,,4 Inspector /, r Level Date N
~ g This record is preliminary until signed below by NDE manager or designee Approved Title Date FaAA-M-84 1
. $$000 failure /g3,fsp/0 " 80 1 1 -
1 Assocates EDDY CURRENT CAllBR ATION RECORD 1
-l Record No. UOS A Date I~I'U
- Reference Standard OAO7M6 $3/JI i n s t ru m e n t _ .- N/7 / 7 S/N 8088[7
~
T e s t: O Abeolute O Dif ferential Instrument Freq.1 M h Gain /0 O Pilter 21[olt s / Div : V d 5' H Of Phase 8 Test Probe bMA 80 / /00 [ S/N /
Cable Length /5 '
I Reference Probe N SC A /OA? S/N 6Nl Cable Length /4 Calibration! .
M Units @ Ad L/O h4 Units @ 4d LIO M Units @ M L/O LA Units @ 44 L/O -
Strip Chart
[Yes O No ~
Type b"us k Con / S/N 000) NG Channel 1 Channel 2 Sen /00 ml/bNo sen /0 0 ml//dv Position Null Point O Position Null Point / I U [Mlu k.
Chart Speed (mm/sec) 25 ,
Calibration Check Time Phase Gain Time Phase Gain Time Phase Gain -
080(* /98 /0 0832 /12 to 107 i 1
h
?
Attached Documents: O Continuation Sheet O Supplementary Sheet
- r \
Photo O Photo Log O Other '
Inspector __ _ _-
/ s Level -
Date b~
.l This record is preliminary until signed below by NDE manager or designee :l
.- 1 Approved Title Date (
'b
- FaAA-M-84-12 ,1 )
~~
i
- 11.6.9.3 Recording form for crank pin fillot Af5P####/
Eddy-Current examination fles4er/8 .
Job number Engine number Y/ 03#7 I 6 0 $ +' E 6 'A Rod journal number E Date la -T'EI
~
Governor end V Generator end l Strip chart number
~
lndication number StCO N h " Lt* 8 TOS OT ~O0 i R ele vant 1 ^)0 AA' " N I* A'N'*
Fill out sketches below 9
90*
N.) 0*
i
+ .
( A l l Start Degree setting Start Distance from A '
End
' End Magnitude of indication Channel 1
~
Channel 2 Examine , I -
Level . .
j Level Examiner FaAA-O-12-1
. --.-.n - , - . - - - . . - - ,__,w. - - ,. - - - - -
I ',
, ff510050I failure MM f8AM Ug'e'i o,2 W
h teS EDDY CURRENT EX AMINATION RECORD R , , ,, v t% ) h u cJu n s +a k s D a,e & c-/-R c Record No,8Ws 04-d0/
NDE Procedure No. Il 3 Rev. No.1 Job No. O lM Recording Criteria S r f- # ear r,lu w_
Component inspected C m eA'4km4l- Component No. 74039 186Sf66u Descripilon of Component O/f U [ [r-f M v s let* Material Onaladu $fM /
Speelfl0 Examination Area C ka.w jfo in de b Md// Od #2 Material: O Worked O Welded O/C a s t Surf ace Condition: O Machined d As Fabricated O Ground O Other Geometry: O Pipe O Plate EIRod O Other Cleaning Technique: O Wire Brush O Grind E O th e r Fnf/ /arett C//en/ e Recordable Part or . Magnitude of Length of Weld No. Yes No l Indication Indication Location Remarks c Qe J oun /t ! H T *L - I h-% Fvam :ewen El lu .fa. aus , + fwlinks GL l \ l i S a v h a u, "
Is ro ll twe eds in +Le N I I l l flo h.eJA alin Wau am X1 ' l l i Y L e_ r u ds h Nes Ax da g Ds l I I I % A <lt $7Akewi thi I
\ I I I A,1,,i l,h AM -O //co @
1 l Al I I . I t i IN i i i I ! 6 N l
' i j i l N ; .
I I IN I !
I I ' } N I i l ! I i \ l I i l I i N i i I e N i i I i N i i i i Ni -
i i j i % i i N i N I N Attached Documents; O Continuation Sheet O Supplemonary Sheet e O Photo Log E:ft the r G /, 6 % fro n 4 twt)
Inspector _ t,/OP o_'
L e v e l __ ,__[ _ Date b This record is prelimin y until signed below by NDE manager or designee Approved Title Date
t tv)fasoCol Mu 8 ap/D Pogo.).ot1 fidlUfe -
. W AS W lates EDDY CURRENT C AllBR ATION RECORD Record No. Date b 'b5 Reference Standard A40904 i n ,,,,,,,, @Mw , D,[, clos' a#I S/N 37 T e s t: CV boolute O Ditterential Instrument p 7 Free. Koo K & a sin 3 9. O gryfi,,, O v olt s / D 6v : v H phase /W Test Probe b*M A Il 9 900 S/N AO
!b Cable Length l Reference Probe hA S/N A/A Cable Length 1/A Calibration A/A Units @ M L/O M Units @ M L/O M Unit s @ M L/O MA Units @ M4 L/O l
Strip Chart O Yes o Type _ S/N Channel 1 Channel 2 Sen Sen Position Null Posnt Position Null Point . _ _ .
Chart Speed (mm/sec)
Calibration Check T6me Phase Gasn Time Phase Gasn Time Phase Gain 13:2T 199 Sto I4:10 I49 19.0 EoT I
Attached Documents O continuation Sheet O Supplementary Sheet Photos O Photo Log do t h e r L% m,A /,ow Lod Inspector ,
e .4 -
N. M, Level u
I Date [~ Ob~
This record is preliminap9 untsi esoned below by NDE manager or designee Approved Title Date FaAA-M-84-12-01
Mfnont N D E 1 1.1.1 1 Failuie reg f or /0 Pego i ot.b
/b500ateS EDDY CURRENT EX AMIN ATION RECORD I lofV fH N UClf d v G'fi b H Date N ~5 A Y Site Il 3 Rev. No.1 Job No. OEbS Record No$ TO A o Gdo3 NDE Procedure No.
Recording Criteria fi t bd C/ CI kv[
Component inspected atu 6 s kaN Component No. *7VMb7 /6CfW$$/M Description of Component /f$f / b vi + + ct 4 - Material Cu < b - 3kT/
Specific Examination Area C ML4 k 4 h O/C Mo[/ Od r-(_,
Material: O Worked O Welded (C a s t Surf ace Condition: O Machined CYk s Fabricated O Ground O Other Geometry: O Pipe O Plate EIRod O Other Cleaning Technique: O Wire Brush O Grind Go th e r #048' /r Recordable Length of Part or Magnitude of No Indication f Location l Remarks Weld No. Yes indication I
Crc 4= torn i I .
6 I? I fI - I - - 1 IUC 6eevcfalk Idudan, J K ! i i i N i i I e :
IN I l
l lN I 4
i I I iN I i l l 1 I NI i i
l l 1 l N i j i l I N i i ! l X 1 i
i
! I I N I l
t I i i N i
l N f I i \l l l I IN l 1 I i N '
i N l
\
N 1
l Attached Documents: O Continuation Sheet O Supplementary Sheet j l
O Ph t s O Photo Log C Other
~
Inspector // 2A Level Y Date This record is preliminef y until signed below by NDE manager or designes Approved Title Date FaAA-M-84-12 1
. MstwoSW Failure N/b/0 P e gb.2 .t2 W
A w wlateS EDDY CURRENT CALIBRATION RECORD Record No. TOG O T-00 A Date G - s-R r Reference Standard M/0 90 4 instrument I'rShv d /)r (exe nM S/N E7 Test: D Absolute O Dif ferential Instrument g }
Free. D _ Gain 9I [ Filter O Volts /Div: V H Phase /Yf Test Probe bMM NO 90 C S/N .2 0 Cable Length /6 Reference Probe /AA S/N M Cable Length M Calibration M Units @ di L/O M Units @ Ad L/O
- A Units @ M L/O M Units @ M L/O Strip Chart Oyes Edo Type S/N Channel 1 Channel 2 Sen Sen Position Null Point Position Null Point Chart Speed (mm/sec)
Calibration Check Time Phase Gain Time Phase Gain Time Phase Gain l ll:18 /V9 Df II: % t44 D. T Eoi , 1 l
Attached Documents: O Continuation Sheet O Supplementary Sheet )
O Photos O Photo Log C Other inspect < -'-
Level /.I Date b This record is prell ary until signed below by NDE manager or designee Approved Title Date Fa A A-M-84 1
1 Tl383 t = STONE E CESSTER ENGINEERING WRPO2ATION sn / op S QUALITY ASSURANCE INSPECTION REPORT TYPE- A gGA 3TmicT ITEM DESCRIPTION TRANSAMERICA DELAVAL DIESEL ENGINES e4 seu es . E A .3n0P ossk t ugywoa0 979 CODE 81 L E L OC aflose COD E a cat
- (M'5:0:o:0:5:0:3 : I I IE :N G I N ;E l lE G;Sl [p):(; 0 ',5 ,
- l 1 11 at 18 le i. to 33 il si 32 &&
??? s es SP PuaCMASE 0A M R LOT ti!E sauPLE silt N0/Giv yangav egg gg i 2: 4: 4: 7: 0: 0:
4 I let: : : : I I 4: : : : 1 10: . . I /un 34 5. S. 4 SO Si S. .0 usee f S CODE /CLAta S 4W toes tia L S WO DAT vs I
I INSPECTION RESULTS:
IA '/7 01 IA[ IOIA 87 U
.. .. .. .. .. Si. . runt .. DATE r.
P A s ant imSPECTION PERFORIIED af.
, eens Pacna.E se0/ SMOP ORDEA NO Su.-SELLE4 CODE g.A 2lo: 0:n :0 : o. f
. e4 i SELwEm 8saast /60C ATiose I: :
as
- . Il:
3s 3I 3.
u L it saa n r ll , l2 l3l l4l l.l l.l ir .. 4: .. 4r s. .: S. .7 .. . ' ..l F.7 l 7.
waf'L / EQuiPas tse f NOS. 9 on u a t t es es o wat L /EQuiputeeT seOS. S 0m u g wersmo: .,,iqp g;y
,, i g Ql.
38 .$0I Qi Q3 I. 4 35 50 I
Ss 9I I
S.
.. 0 e, ,, I4 ..
I O,0 A4 nEsubron se0 / or , a t r t a ta.Ca us(r,0ggn.LE uh acriam aSSa.mED SP S I. iLi unsay N 0 it s' ATTA CODE ATTRieuTES g
, cts.s og e ap AtTR SUWuaRY gy j,, CON W ;0 ,2 SITE CONDITIONS S ' '
i.
,,2 a s - s i T .9 O TESTS AND INSPECTION. 5 .
a
- sa-sc , ,
-- ti'/a,r,W'tfr'E
' " ED -
.0-..
1 l
le YLQSe9 fuh1 CLSertuissis Ano PAlfasfar6 isGobsuas Ms Anioso, ausiv rssis,as. QC REIMSPEC.Tsoas ALL*TEuS AT ;
.2. A ft.itutu rns /ExtrMur In s/ssroon .ses /stresnu car &E tan 8ess or lets riiur Moil feR 4A# CMaxtin- 3A16 Fit ron1. Se a /%s ".2 rw strosi; SI A / IMITI AL S DATE
- 3. l6tfonna A fLMRL5a81 fikartnNT }Nststrax cx fx1 #S A cd u tG Hn-fHrAt pS a rs. 408 ORDER "O Sin b1' nunno Iwo,kricoU Wut Foo,no. 5u hu '3 ra tsfour. / Zen ivolaraws win 12210.50 Owe n0/atv.
$r%o rt To DLL f9A PES /tl5t tion. Sr. AJAS ACMit/ED rkA7 bhb Pittites AM EbW (dtMNT gV threcran oot race siz ans. fx rw hanu rmr r><u is ao anarn%r rarat Atsn Axo roar 1,u deuh Pietruer Lahrsws aw wou.xeuant. Sic ftyt patverk% $$9".[W"*'*N REV I N
- 4. Ubia /.ar na east cuttw1inuscri1~ wu Pcnwa ok rkt co w An ela Hu a. ADDo fu c.rdert s
- O . Se c FAA Ruear nuts #ff "A *O Cn Amet no.<reA 0 muss Il
fIE2W8SE.
REV M CHC O 2WEP '
'"JP",'LP^F,. .E0 0 ," M!"M' IP.Ja,UL'mW ,, ,,, .eEO .sSut cart ,su A5 l
. ll l l l ll l l
- a. as
, : ll .
- a. 30 .n 34 l l l
.= =
..o
,' l' l l l l llL 0 04, .. *4 l
6 I: : :
ll . I: I.I' i 11: I'I: l[
IJ A.ys. . ST , 188m A A m.
' *- 01-3/0/1 #1/9 (/Arxls (0 & M/.J 1
l C
g yssos 861 *)sp 8 STONE & WEBSTER ENGINEERING CORPORATION 1
RECORD OF LIQUID PENETRANT EXAMINATION T v Pt (s. ... ..u6. ....e6s.. .v u i.. ..... a r s. 3 -
MATERIAL s 5 com m p; T.T a. o ,6.,a a e .. . . ' ',,* " = " a s... e....s. a .s,.. a ...s. . !
l insetCTioN nolo point t meer, ess.6 @
Cn"% g se ... o.... oit...s.,s. a .. . aa-aa ">
m it TEksPERATWAE PROCEDURE #substER SPECIAL TESTING CON 0lfl08s PROCEDURE N/A ., 9 N RB/ C /O N/A
.r. ovist.us se*-iss+e Paes. / n ew. / cae NO lee 5PECT60N asATERI ALS GRAND DESIGN ATION SATCM N O.
DUdL- CHEK i e.s-cuanse DR-60 RC-65 S/3pg Qg ;
t es:s team, DUBL-CHEK gjggy gg )
DUBI, CHEK
- s.w6sieise saatos esmoven
.re esseee DUBL-CHEK DR-60 D-100 5/Sp,/ k*
gygpg a e peer sea. ea,ien c6s asse DUBL-CHEK O SatTCm OA 0 Test A DETast ust oTNER Sint ir aetCESS ARY.
DR-6,0 gjg ga
{
.i r 3 l; f
9 !
/ .
d,_ ,,:. o.~ q$
}Q o$.
u J % a-,- m ,ooose a iiat REPORT SELos TMOSE speDeCATIONS OSSERVED A8:0 TME PERTINEpeT k2 EVALUATION b",', (",yo'f " " E 0 " ' " 8 8 " " " ' * " 8 ' " "^' 5CE '5 "tomRC uSE g-k &
LOCATsON 3:2E g, DESCRsPTiON ACTlON MM
( ACCEPT / REJECT AND COMMENT AS NECESS ARY) $
I kuEt'f - '
Ybc/1?Se fdMM/ fh k h e
. o l'*
a APPLICASLC CODE.YE AR. ADDEND A A8ec PARAGRAPM 8: UMBER $ i CRITERIA i E/9c4 C .Z8,IHij i i
ATTEST d4 Bed asspoes.e6s caeria.sc passo==s6 E 4-74 / !
sava6 oars 8
p p5x
/n&L 3 of 3 STONE & WEBSTER ENGINEERING CORPORATION -
RECORD
,.a OFLIQUID PENETRANT EXAMINATION TYPg (c.a..n siss6.st.. 6s sa sta s t.cune, etc. ) w MATERIAL :
[AfBW 374si n stonsETRT C.n 0,6.n O 8.t.u' ,","j',5" O c.or E . .s. O m.. O .1 a. . w iN P:Crion nolo poiNTt...t.,4. 6.
S CU."oS= Q ..c ... O ... .. O '.'. . . . n . O .1 u. ' " ' " " ' " ' " '
m AI.
TEMPERATURE PROCEDURE NUMBER SPECiAL TESTING CONDITION PROCEDURE N/A ., _9 N RB/ C / C N/A innov.sv.ss. so.. ins., .aoc. / m av. / cas. NO INSPECT 4cN MATERI AL 5 SRAND DESIGN ATION BATCM NO.
e a:s-cLeaman DUAL- CHEK DR-60 w />>/ $)
a.n u te.at DUBL-CHEK RC-65 9/g T
( ag a sen.6ai, ism . ./os asmovse DUBI, CHEK DR-60 5/fpy E easus6. se DUBL-CHEK DUBL-CHEK D-100 DR-6,0 gjg pf k2 s post seasination cLs.nsn o SIETCM ORoTMER DETAIL. USE QTNER SiOE IF NECESSARY. /"/* d ' Ta* #as 4">rs.
gfjpg {
E
- dA 0+(/w g $'
--, mw a w,_ %
- eu... c., ^< ; l.
l Ar-I nity k n ?1 wm fk l
} !* 4* at t Fa<r % :
Gwane N tlom .e (.,a w *LA C& cs *ld co u
) Lesmas Arr. Lou,h ra,s.
r-
- n. ~ - '__ j il i
lhtP lit de l'mti! /4f164 {} 00$$' &c.
REPORT BELow TwosE iNoiCAricNs cesERvEo ANo TwE PERT NENT ;
T EVALUATION b"r', (",yop M R Ecu REo. =*ERE AnoiTioN AL SPACE is REcuiREo usE 4 ;-j:
LOCATION SIZE ACTiCM ID 8\
(, ggy DE 5 *RIPTION
( ACCEPT / REJECT AND CCWWENT AS NECESSARTI R h
I h kr* Sta are p NrHe 7 [4) h o. A 2$ U
^
Dou acu b'6 u.r [2] hAsi 5 N 4 -
g ol; 3 5 it s in o el' -
a i APPLICABLE CODE, 00ENDA ANC PARAGRA M NUMBERS I CRITERIA * "; -
EUCK d-29,/fu I ATTEST //BA2, _#6s m /Aff
.sa...s..cs ca.vi,iu ,s.....su .. n
M5000bDJ
[dllUR [/JM [4pg N D E 1 1.1.1 1 Pag 31 cf 3 AssocateS EDDY CURRENT EX AMINATION RECORD Of*d 40A
^
Site k id f k IDuc MV Date b~b-Nb NDE Procedure No. !l II R e v. N o. _O__,. J o b N o. O b Record No. A5 0 6 06 -odg Recording Criteria $U WS clavt, Component inspected bb'a leTLadd Component No. 7401C1 /Elr5 t Eb / A Description of Component O(5// S/Hr u Irv Material Cow b en {kt /
Specific Examination Area CN(un k join Nll/h in avra n) W r foo n$ Zu olu a /nua Material: O Worked O Welded D'D a s t Surf ace Condition: O Machined O Ground O'O t h e r 6 (U A/IA 6/
O As Fabricated Geometry: O Pipe O Plate IRod O Other Cleaning Technique: O Wire Brush O Grind O'O t h e r IAurv Recordable Part or
'" *" Magnitude of Length of Weld No. Yes No indication Indication Location Remarka l CVem k'S finut v s a s n) J ~ " #
h30 Rs covd a Gli _Ts.<3 n c a lad
/, s u m 6 f.J # - -
- 4 's *l
\
\
s s
N I
\ l N I N I N I N l
.- N l
..--- N l N
\ l
\ l N l Attached Documents: O Continuation Sheet O Supplementary Sheet
. O hotos O Photo Log ETO the r c [j "g g j 4 inspecto -
Level Date [ ~ C This record is prell ary until signed below by NDE manager or designee Approved Title Date l FaAA-M-84-12-61
p)pisoho3
. , fdjlU[Q MySSF 8 P c g ol.o f _i Assocates EDDY CURRENT C AllBR ATION RECORD Record No. R$ OC OC -oo 8 Date b ~ 5 'MN Reference Standard Md 2 370 Os / ell Instrument Iht? 17 S/N A/33ACI Test; boolute O Dif ferential Instrument Freq.9 M k - Gain /0 0 Filter O V olts/Div: VOT H 0I Phase 1 00 Test Probe $sA4 fr P /00 P spy Cable Length I c. #
I Reference Probe f
' r Cable Length I6 __
l Calibration i M Units @ le L/O M Units @ M L/O l
M Units @ y/A L/O yA Unltg Q M LjQ t
l Strip Chart
[Y e s O No Type 6"I I 'AS k S/N 0007 006 Channel 1 Channel 2 Sen lD0 AUffYld Sen IDOwYlNad Position Null Point O Position Null Point 1. T U #,. L / .N,< /t Chart Speed (mm/sec) 2T Calibration 9 heck Time Phase Gain Time Phase Gain Time Phase Gain I Q 'i 200 lo l
Ilo:W( W /oGoT l
l l
l Attached Documents: O Continuation Sheet O Supplementary Sheet CP otos O Photo Log [ Tother M M /* (I 68 il g Inspector >'f Le Date S YIT
/
1
, This record is preliminary until signed below by NDE manager or designee i
A pproved Title Date FaAA-M-84-12 'I
o , -
11.8.9.3
+
R: cording form for crank pin fillot M 6###6*#
A"# ###
i Eddy-Curront examination l
Engine number 7/OM f 66 N E6lA Job number O 12/iS Rod journal number b Date 6 25 Governor end Generator end
~
^
Strip chart number Indication number _
Relevant ? ko R'ILV O T "3'" E d t Mtued mimbe
- 8 50606-00f i Fill out sketches below l
l l
5 90*-
0*
+ .
i !
\ I
\
A Distance from A Start Degree setting Start End End L
Magnitude of indication -
Channel 1 Examine Level
/
Examiner Level f
FaAA-e-12-1
gjet)0503 NDE 11.1.11
'. UN [/J4:4 78N P C g 3 1 o f .d.
A@ssocateSEDDY CURRENT EX AMIN ATION RECORD IWk bf* b #dP Date Site NDE Procedure No. II. b Rev. No.1 Job No. OkS$ Record No.8io s d6-e7 Recording Criteria Sn. Proca L .r. .
Component inspected C roe k< b 3 4 Component No. 7vo29 /E6S*EGM Description of Component Dens I fr-s w e nde r Material b L _$ /// /
Specific Examination Area Cf h k , Min o,C Mak 66M Material: O Worked O Welded Diast Surf ace Condition: O Machined IAs Fabricated O Ground O Other Geometry: O Pipe O Plate Tflod O Other Cleaning Technique: O Wire Brush O Grind Gr O th e r C bffhi e Recordable Magnitude of Length of Part or Wald No. Yes No indication Indication Location Remarks Chn koin a v - - -
Us Ru Ja Lb fuh eas
'rt } is u r y /s uslas I t' Asa w wi o
~
l I aJ C Min a LL Ua //
! ' 6a vn gk s a a l - IRlG A r t.adalnl1 l buhdur-N I !
I N. .
Nm I N i N N I
1 N_ !
N N
N N
N N
\
N Attached Documents: O Continuation Sheet O Supplementary Sheet O Phot O Photo Log FOthor(4 /s kd/w [t cog)
Date ^
Inspector d _ Level Thle record le preliminar until signed below by NDE manager or designee Approved Title Date FaAA-M-84-12-61
i lv]poJB03 failure N*' # # #***
Assocates EDDY CURRENT CAllBRATION RECORD i
Record No.pOG 06 - 00 7 o ,,, M @
Reference Standard 240904 Instrument I6'v3ft e-Ot[res/cor S / N 9 Test: IA b solute O Differential Instrument 7 Frog, 506 Q R Gain 2 7. f O Filter O Volts /Div: V ' H Phase Test Probe fo 2 A 6 C F $ f 70 C- S/N JO Cable Length . IL #
Reference Probe AA S/N M Cable Length A>4 i
Calibration L A Units @ M L/O AJA Unltg Q Wk LjQ A/4 Units @ h* L/O MA U nits @ N 't L/O Strip Chart O Yes do Type S/N Channel 1 Channel 2 Sen Sen Position Null Point Position Null Point _
Chart Speed (mm/sec)
Calibration Check Time Phase Gain Time Phase Gain Time Phase Gain
/7/05 /v9 325
/7:2o /Y9 37.5 I73') /V9 2 'l T E o T Attached Documents: O Continuation Sheet O Supplementary Sheet Photos O Photo Log GPOther MydEM/iry* b e, inspector A Xuu Level .
Date $* d 'b This record is preliminary until signed below by NDE manager or designee Approved Title Date Fa A A-M-8 4 t
I o
rl58H I = STONE & CEBSTER ENGINEERING JRPORATION sn / oF [
A QUALITY ASSURANCE INSPECTION REPORT TYPE- A p37 g ,c 7 IYEM DESCRIPTION TRANSAMERICA DELAVAL DIESEL ENGINES se muuSER .Snop ONLY REYWCAD 179 CODE 8 8Lt Locaf som C00f QA caf elW:c :s :t 3:/ : 0:
s it I IAIII IE 'N :G I NEl lE;G;Sl lN E; O ;fj; i2 IS i. a. 20 82 IS Si l 32{ 33 9fetinsp puncmast 0mptm Lof gett Sau pL E 91Zr h0/077UNtat iffus z I 2: 4: s. 7: 0: 0: ,
I IV: , : : I Iv: : : : I lo: . . I i/um 3 3. u .. .. so si s. u .o a f.
CCCE/Clats S on y lmit ta L 3 uo Dav ve l I INSPECTION RESULTS: I A W d! ION
.. .. b.. .. .. ii.=afuar .. omfg f paint ing p t C fices PERFORuto 47.
woe n pacuaet au0/ Sn0P OR Orm ho sue stLLim CODE I a R . E . - h
. . i. SELwt4 8eaM E / LQC afiQ as og 3 33 3.
wLTE No,i. r l'I l'l IIO;o:o 1 XPI . 151 1*l l*l
,, .i .. .. ., is n s. if .. .: .. 7 ri il Maf *L /tQuiputN T NOS S Ce u situ NQ esaf L /tQuipM E NT N OS. 9 0Au g ie,:msmr . , i gg g (,. .
i g G 1,,. . ,1 0,e , , , .
i,,. ,0 i
,e r,,n,,l s. ..
I O., O,,,,i ,. .,
i O,0 A4 mE3JLT 04 NO/QfY REFERENC. ute FOR SINGLE a c f . J .e AS $1G N t Q N 6 0 CR uM3afsitu CNLY 54G/ N.T ALS gart El ONSISILif Y UMgaf acfioe o c . . .. . ,
y el atta coce af T aisuit s
, ,,,,, Ee,oca N O'
, , '- A-
_l',lC N W;01 SITE CONDITIONS S i.
,,,,1,3 3, T .9 0 TESTS AND INSPECTION 5 .
2
.0 , ,
action COMPLE f f 0
- . i - .e i SiG/ imsf e ab$ OAft 50-S. . i i
= SS .7 , , ,
- es.t. ' '
g oc ntimspec tion
/ p c . ir.,cs, -c tannu~n. .* m' ^'t ,'at *a a Pt'd u!") I'
l
), iNr, g,, a a n na d t , t o t rcna fr%! in n'ai '. t ~ !H ?'E l'** ^" ! '
- .:;,J Or.s4 "-". ire 4 ' 5. e 2N M/r -
s,afi.v ats Caft 1
1
- 3. l,Gr1M u n f;.:u nnnt mg u u,, in ,4, ,,:, . .oa oneen no e, p,,7 su f,J e,ng, ,nk n gnia , furn, t23to,50
()n e % u~s r -n m .? < < :n was ru ,) , . $c c o% c '* ? ro w':4 ?. bis M,. * ?> ~ one no/nts
.s. u ,, r:
u, .e .1 e v.? a u a v, , a ,.,,,n ,; :, , & a ,~ . v, , 5 ..., M ,,,, tb
.i ,, lh cu . re ry,w, w E::1 a m. ,w,;m u :n r..r ws a r..a , n s.o.< .,, , '
' Py9" o(y "0'" ",
n.r rn : Ara,w e. r ? .e., i, w . v e ,,, ,. , : m i: ., . . , , , , in: ,y REV V 1-3 a
- , As McN Hannr. Spr; '@ id r o rn o . " j n'un~ "6 ADD C ;
% YE mr;r.i rnn 4' [:n Guw? iso su 4. was fcNwt:' w ?~n Lian< 95 .% t/cus '************"'"
- r. e n ',en
- YA. % se :n . Sfr (!&l >x, M r y 4-is *' Y =^ * /
REIb EbhbkM.
REV A CHG C
',3,'."'? " '"!P ','f. P ^!' , . u 0 No . "%^ f M 5 IP. J ",'L' n"f.. ,,.. w o ,ssut 04ft ,s_t s A5 I 11 . I : : I : : I'l l l IIL i . 6. a.
I er i. !.. I I :2.II : l as a, . so 32 3. ,= .= ..o a 04, .. "
ll : I'I: 11 i
6 I: l l' ll . I: I .I I en nr 11 SY -
1t E M a n R S EVJfte-&~dCs (%- -
m y a.-,o m . .
y y ,g
/hu J o= S' STONE L WEBSTER ENGINEERING CORPORATION RECORD OFLIQUID PENETRANT EXAMINATION e.< . .
TY PE (C....a .,se6. ....e6s.s a,s s k. cues, s,c. ) ;
MATERIAL s :
Guses % Q2
.E ETRT a .... o ,6... o e....- l,";"3" a.... e...... o.u.. o ... .. . T m
iNsPECri e.. 6 @=
Cn"#! g . ..... o...... o : ....... . o ...., "" a'.oM noto "=>P oin T ( n....
,m TEMPERATURE PROCEDURE NUMBER SPECI AL TES(ING CON 06 TION PROCEDURE N/A ,,
9 N gg/ C / g N/A in .. , .e v . c c . ... . i r ., ps.c. / . s v. / c... No INSPECTION MATERI ALS GRAND DESIGN ATION SATCH N O.
. ecc.cos a.a. DudL- CHEK DE-60 S/3pg yj t atz e rn.a. DUBL-CHEK RC-65 sjfgjyy se g atow6serite a../.aasu..se DU Bl.-(,HEK DR-60 5/Spp 6$s
..er 6.ess DUBL-CHEK D-100 5/gpg s eege. :asinat..ec6s.nsn DUBL-CHEK DR-60 gjjpg }q {
o 3:ETCM o# 0TNER DETAll USE OTH ER $10E IF N'. CESS ARY. hE 3e F 3
?l a
i i
deme r ba #tsa .
.) E
. t e
~w G j d,w wu o a . mm " n : s.:
Li
,, gi REPORT BELOw TMOSE INDICATICNS OBSERVED AND THE PERTINENT .} 3:
usE -
EVA LUATION ' *r ', (", ", ^o 'l " " E
- u ' " E D " " E " E ' 0 0 ' ' ' 0 " * ' 5 C E ' S " E S "' a E g.
x : .
.t 't ACTION LOC ATION g,y$1Zgg E, DE S CRIP T10N ( ACCEPT / REJECT AND COMWENT AS NECESS ARY) ')> @4 D i 4( ,,
i ll(c.;.31 Ifs tis ~ w ri: ,yi e, op ,i' f.
, 4 ,
S i 4 C o
, s!!
L l' l
. e -
3 APPLtCASLE CODE YE AR, A00 ENC A ANC PARAGRAPM NUWSERS I CRITERI A i E/9<$ C 3,1%// '
l ATTEST
........6.
//ALA.
i.ri..........u
- E 6.6 4- W I
gggy
~ ~
?% .30P$
STONE L WE85TER ENGINEERING CORPORATION RECORD OF LIQUID PENETRANT EXAMINATION T.439 TyPg (can on erset.sraim6ssa sistL.cune, etc.) vi s <
MATERIAL m $
(%pw H, u ? n
.Eo 1RT o ,i. a sa,. o e .....- '
';l=n " o .a., e .... .. o .. .. o ..... . ii s
INSPECTION MOLO PQiN T ( acot, remag, SURFACE ' '"'" *d CON 0171 O N Qmacwins. O ...u.. O t.'. . a v . . o or.. nNE TEMPER ATuRE PROCEDURE NUWSER SPECI AL TESTING CONDITION PROCEDURE N/A ., 9 $ RE/ C / O N/A ir not ettere m so* -ing., pecc. / n av. / c.e. No INSPECTION W ATERI ALS ORAND DESIGN ATION BATCH N O.
i ecc.etsaman DUdL- CHEK DR-60 5/pg {j u tmermaar DUBL-CHEK RC-65 pfygy wg emutsities ame/en namove. DUBL-CHEK DR-60 5// Af h5
.on 6o.a. DUBL-CHEK D-100 5/4/4 $2 ,
9.csv eramination cera m en DUBL-CHEK DR-6,0 ,5ffpf g{
o saETCn OR OTHER DETAIL. usE OTHER, 30E IF MCESS ARY.
,/ %
% .D
$\\ !
}P~$ii l
%2 Q% 2LL I
$.c c us-d y &*
I T
! cw- m.
u ) ! ' 8# EN \
j - ~
hg; ' ik.
7 ;:;li v- -
a <>
T
- _t ei REPORT SELOw THOSE INDICATICNS OBSERVED AND THE PERT NENT y 3l
'"', E,yo p H REcu REo. wnERE Aco Tion AL : PACE is =EcuinEo usE f
EVALUATION or ;
SIZE ACTION
[s LOCATION DESCRIPTION g ,g g g y ( ACCEPT / REJECT AND COMWENT A$ NECESSARY) p[ ~ i -
s
', i $ J lo84 ):Neu fafcc1 . h ('-
i 2
E?
7 3 2 w
1 N
of
~ 2* l
$ C C'
(
u 4 C e s
APPLtCABLE CODE,TE AR, A00 ENC A ANO PARAGRAPM NUMBER $ I CRITERI A _ ,,,
44/ff- j i
Y&t C .2L//M l
l ATTEST LYA AuAs E 4/Ilff'
. u...............s i ....o.s.. ...., .... l
' l
. . - - - - . _ _ __ i
. MisNosto " " ' ' '
Failure @ 7e4 ,, , ',;E
~
Analysis Assocates EDDY CURRENT EX AMIN ATION RECORD Site kfulF OTHJ Dor /ta k bb O n. Date 5 -S -OS NDE Procedure No. fl'[ Rev. No. / Job No. N65 Record No.UO6 0h*6//
Recording Criteria 31 bdu eluw_
Component inspected C#n a l/S b dN Component No. 7VoS9 /665 # 6G/4 Description of Component 056[ bIdou!oV Material CD v &o n Sh/
C h2 M kJo/ n b//M /h /3 W4 o[ bMlbauj 4 ca hdkf Specific Examination Area M a t e rial: O Worked O Welded (C a s t O Machined IAs Fabricated O Grouna O Other Surf ace Condition:
Geometry: O Pipe O Plate O'R o d O Other Cleaning Technique: O Wire Brush O Grind (YO the r d/2 dW #
Recordable C#a dF'A indication Magnitude of Length of Part or No Indication Indication Location Remarks Weld No. Yes 3L GtntwW \ '\ " ~ l
" !ila Riarda hlt hduaQ1 nn el I \
IInn EAolv-rn eva4
% l I I f le n dt ' un nr aleR1 ded '
t
\ l i i !
\ 8
! I i N l l !
i I INI i t j
i I N I i
l i ! N i e
' I i M i
I I l lN l i I I l NI t I i N ^
i !
I I i 8
l l l I i N
i N i
l I N I N i N, Attached Documents: O Continuation Sheet O Supplementary Sheet O os O Photo Log herColf6 d/5A M C b b 4 t l@Jf Level Date ~OI Inspecto - y This record is preilmindry until signed below by NDE manager or designee Approved Title Date FaAA-M-84-12 .1
M10'/190
% Pc golo f 3
~
EDDY CURRENT CAllBR ATION RECORD 0% 4 // o,,, 6-g-pg Record No. 8 i Reference Standard bOMd b Ill Instrument b7 /1 /7 S/N bNI Y T e s t: CYA b s olut e O Dif ferential Instrument Frec. Q M k Gain /2 O Filter O Volts /Div: V di H b* I Phase /I l00 A S/N I Test Probe faA A EL A Cable Length 16 Reference Probe $AA Wrf ibo O S/N 3 Cable Length /
Calibration k0 Units @ O L/O 26 Units @ ~ /* d L/O 30 Units @ ~0I L/O Units @ L/O Strip Chart Oyes o Type S/N Channel 1 Channel 2 Sen Sen Position Null Point Position Null Point _.
Chart Speed (mm/sec)
Calibration Check Time Phase Gain Time Phase Gain Time Phase Gain Ill:4/A ly9 11 14 Tl 148 l >. go T Attached Documents: O Continuation Sheet O Supplementary Sheet hotos O Photo Log O Other inspecto ul Level Date d' 8' W This record is prelim nary until signed below by NDE manager or designee App,oved Titi. Date FaAA-M-84 1
I i
Page 5 of 3 11.s.s.3 Recording form for crank pin fillet "((f Eddy-Current examination Engine number 7 6/039 /E6Sf E6/A Job number bSN Rod journal number 7 Date b'S'bI Generator end Governor end _
Strip chart number
-~
Indication number IKbbbl5" Atten) h,areth6 870 6 0)-O f /
Relevant 1 ho Arl' "~~l Fill out sketches below
^ 1 90' 0
+
i A
Distance from A Start Degree setting Start End
~~
End Magnitude of indication
~-
channel 1 Cha nel 2 <
Examiner 4 u
- Level I c.
d'8 -9 7 j
Examiner Level FsAA-G-12-1
i failure ?@?Seos/0 2'*"f ""
Pago 1 or j[
D.
Assocates Eooy CURRENT EX AMIN ATION RECORD Sii. @ ,ocr Grad h k=> staNox o,,, 6 8 s NDE Procedure No. Il*3 Rev.No. 1 Job No. kkb3 Record No.86GOE-O/_0 Recording Criteria $n MrbudgW Component inspected C kN b1 d'b Component No. 3/83 9 /[db N M Description of Component Ol&5/! [YlM&W [*" Material On #So ^ S /'d /
Specific Examination Area C.va u kFla dd /d>/C. /3 ore, Material: O Worked O Welded ICast Surface Condition: O Machined D'A s F abricated O Ground O Other Geometry: O Pipe O Plate Rod O Other Cleaning Technique: C Wire Brush O Grind 0"O th e r [44M L P Recordable Part or Magnitude of Length of Weld No. Yes No indication Indication Location Remarks C4askafn I I I I i . .
7 L' \ l /i ~ ~ l - Wo 4tcedel/r [1-4w
'1 R f ' t/ ! - ~~ l
\ l I I I i
\l i i l i N I I I I I I N i l l I IN I i i ,
i i iN I t i i i I N! i , I i i I h I 6 i l ,
NI
- i i i l K i ! ! l l l \ i l i i
l l \ i i i i ! l NI I l ! A I ! I i N I i ! N I I I N I i i N Attached Documents: O Continuation Sheet O Supplementary Sheet tos O Photo Log M ther Co /f 6p 4Yny d60 Inspector _
Level - Date bb This record is prelimi ry until signed below by NDE manager or designee Approved Title Date FaAA-M-84-12-Gt
i
, , ,. N$000A0
. P a g o.l.o t .2 Assc>ciates EDDY CURRENT CALIBRATION RECORD R e cord N o. bOS O 8' O/
- Date b-O 'b Reference Standard b0/0@O9 Instrument NFJS& _02 #caf* V S/N I7 Test: db s olute O Differential Instrument gg Freq.[OOk Gain 32. dilter O Volts /niv: y H Phase NN Test Probe OAA U WO L S/N 20 Cable Length M Reference Probe 4M S/N &
Cable Length &
C alib r a tio n
,4 2 Units @ d'4 L/O NA Units @ M L/O 4A Units @ N L/O Units @ # L/O Strip Chart Oyes do Type S/N Channel 1 - Channel 2 Sen Sen Position Null Point Position Null Point Chart Speed (mm/sec)
Calibration Check Time Phase Gain Time Phase Gain Time Phase Gain
/oin / V'r 375 i to:st tys 3 7. 57aT
/6:01 /49 37.s-
/F:M I 49 3 7. 5 fo r Attached Documents: O Continuation Sheet O Supplementary Sheet O Pho o O Photo Log dth e r [ygentna f/dw [t ode c/
Inspecto e Ma Level Date This record is preliminar until signed below by NDE manager or designee Approved Title Date Fa A A-M 12- t
f ATI'ACHMENT 4 This attachment contains the FEV Report in response to Item 1 of Attachment 1.