q MllCE OF VIOLATigi Wisconsin Electric Power Company Dockt: Nos.
50-266;.50-301 Point Beach Nuclear Plant Licer:e Nos. OPR-24; DPR-27 During an NRC inspection conducted from October 13 thrtugh November 22, 1992, a violation of NRC requirements was identified. 'In acc:rdance with the
" General Statement of Policy and Procedure for hRC Enfc cement Actions",
10 CFR Part 2, Appendix C, the violation is listed beltw:
A.
Technical Specification 15.6.8 requires that the :lant be operated and maintained in accordance with approved procedures.
Procedure RMP 74, "B Train Degraded & Loss of Voltage Relay Test', step 3.2.1,- directs opening a knife blade switch in preparaticn for listing.
Step 3.2.3 directs depressing the relay test button, A cau:'on statsment preceding step 3.2.1 warns the technician that the ir.ife b'ide switch is to be opened first.
Contrary to the above, on October 26, a maintenar,:e electrician-did not open the isolation knife switch as. required by pr:cedure MiP 74 prior to depressing the relay test button.
This is a Severity Level IV violation (Su;plemen 1).
Pursuant to the provisions of 10 CFR 2.201, Wisconsin E'ectric is hereby required to submit a written statement or explar.ation :: the U.5. Nuclear Regulatory Commission, ATTN: Document Control Desk, Wuningtor, DC 20555, with a copy to the Regional Administrator, Regicn 111, ind a ccoy to the.NRC i
Resident inspector,-within 30 days of the date of the istter transmitting this 1:
Notice.
This reply should be clearly marked as a "Repij to a hotice of Violation" and should include for each violatior:
(1) :ne reason for the violation, or if contested, the basis for. disputing the violation; (2) corrective action taken and the results achievec; (3) c:-rectise action to be taken to avoid further violations; and (4) the cate whei full compliance will be achieved. Where good cause is shown, censideration-hay be civen to
. extending your response time, i:l' Dated at Glen Ellyn, -Illinois
/
E4 this ] day of ~ December,1992 L. Robs ~r.- Gregte, Chief Reactor orojects Branch 3