ML20126B427
| ML20126B427 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/08/1992 |
| From: | Greger L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Link R WISCONSIN ELECTRIC POWER CO. |
| Shared Package | |
| ML20126B431 | List: |
| References | |
| NUDOCS 9212220084 | |
| Download: ML20126B427 (2) | |
See also: IR 05000266/1992023
Text
. . .
.s
.
.
cj)
1 #.~
~
,
f*".cgk
umno sans
.-
NUCLEAR nEGULATOnY ' COMMisslON
O.
f.
ntcioN in
g
y
g
799 ROOSEVELT EIO AD
g
- '
g
S
,
C L E N C t L v ><. I L L IP4015 60637
'
"
E7
c
.....
g
Docket Nos. 50-266; 50-301
Wisconsin Electric Power Company
ATTN: Mr. R. E. Link
Vice President
Nuclear Power
231 West Michigan Street - P379
Milwaukee, WI
53201
Dear Mr. Link:
Inis refers to the routine safety inspection conducted by Messrs. K. R. Jury,
J. Gadzala and G. F. O'Dwyer of this office, from October 13- through
November 22, 1992, of activities at the-Point Beach Nuclear Plant Units 1
and 2.
Our findings were discussed with Mr. G. J. Maxfield and members of his
staff at the conclusion of the inspection.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective-examinations of procedures
and representative records, interviews with personnel, and observations.
During this inspection, certain of your activities-appeared to be in' violation
of NRC requirements, as specified in the enclosed Notice. A maintenance
electrician did not open an isolation knife switch as required by procedure
prior to depressing a relay test button.
This resulted in the deenergization
of a safeguards electrical- bus.
You are required to respond to this letter and should follow-the. instructions
specified in the enclosed Notice when preparing your response.
In your-
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response-to-this
Notice, including your proposed corrective a:tions and the results of future
inspections, the NRC will determine whether further NRC. enforcement action is
-
necessary to ensure compliance with NRC regulatory requirements.
~
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy __of.
this letter and the enclosures and your response to this letter will be placed
in- the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management. and Budget as required
by the Paperwork Reduction Act of 1980, Public Law No. 96.511.
9212220084 921208
ADOCK 05000266
G
pyg.
[b_Ili
.,
,
.
.
-
,
.
-
-
.
,.
.-
.
.
. * - ..
--
,
.
..
,.
L*-
Wisconsin Electric Power Company
2
-
1
We will gladly discuss any questions you have concerning this inspection.
Your cooperation with us is appreciated.
_
Sincerely e
M.
.,/
.-
49
u%
_%
c
,
L. Robert GregEr, Chief
Reactor Projects Branch 3
Enclosure:
Inspection Reports
No. 50-266/92023(DRP);
No. 50-301/92023(DRP)
cc w/ enclosure:
G. J. ~ Maxfield, Plant Manager
DCD/DCB (RIDS)'
OC/LFDCB
Resident-Inspector, RIII
,
Virgil Kanable, Chief
Boiler Section
Cheryl L. Parrino, Chairman
>
Wisconsin Public Service
Commission
Robert M. Thompson, Administrator
WI Div. of Emergency Cavt.
t
9
l
h
t
i
.,..y'%^
m
_ -
g-
7
.r
w
ew
~T
9~y
'
e
. .
.-
...m.,-e--
, .-
. - , -
-
r