r Appendix NOTICE OF VIOLATION Wisconsin Electric Power Company Docket No. 50-266 As a result of the inspection conducted on April 1 to May 31,1982, and in accordance with the NRC Enforcement Policy, 47 FR 9987 (March 9, 1982),
the following violation was identified:
Technical Specification 15.3.14.E requires, "All penetration fire barriors protecting safety related areas shall be functional.
In the event of a penetration fire barrier impairment a continuous fire watch shall be established on at least one side of the affected penetration within one hour."
Contrary to the above requirement, on April 16, 1982, the inspector discovered that the fire door between the 4D diesel generator room and the air compressor room was open and that no fire watch was set.
This is a recurrent item of noncompliance previously identified in IE Inspection Report Nos. 50-266/81-11 and 50-301/81-13. This is a Severity Level IV violation (Supplement I).
Pursuant to the provisions of 10 CFR 2.201, you are required to submit to this office within thirty days of the date of this Notice a written statement or explanation in reply, including for each item of noncom-pliance:
(1) corrective action taken and the results achieved; (2) cor-rective action to be taken to avoid further noncompliance; and (3) the date when full compliance will be achieved. Consideration may be given to extending your response time for good cause shown.
Dated R. L. Spessard, Director Divisien of Project and Resident Programs 8207300306 820716 PDR ADOCK 05000266 O
.