Notice of Violation from Insp on 931026-1206.Violation Noted:Licensee Did Not Rept Initiation of Nuclear Plant Shutdown Required by TS 15.3.0.A
ML20059A230
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 12/23/1993
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To:
Shared Package
ML20059A228 List:
References
50-266-93-15, 50-301-93-15, NUDOCS 9312300064
Download: ML20059A230 (1)


Text

. _ _ _ _ _ _ - _ - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ - - _ _ _ _ _

NOTICE OF VIOLATION Wisconsin Electric Power Company -Docket Nos. 50-266; 50-301 Point Beach Nuclear Plant License Nos. DPR-24; DPR-27 During an NRC inspection conducted.from October 26 through December 6, 1993, a violation of NRC requirements was identified. In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions", 10 CFR Part 2, Appendix C, the violation is listed below:

A. 10 CFR 50.72(b)(1)(i)(A) requires that the licensee notify the NRC within one hour of the occurrence of the initiation of any nuclear plant shutdown required by the plant's technical specifications.

Contrary to the above, on December 3, 1993, the licensee did not report the initiation of a nuclear plant shutdown required by Technical Specification 15.3.0.A.

This is a Severity Level V violation (Supplement 1).

Pursuant to the provisions of 10 CFR 2.201, Wisconsin Electric is hereby required to submit a written statement or explanation to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555, with a copy to the Regional Administrator, Region Ill, and a copy to the NRC Resident Inspector, within 30 days of the date of the letter transmitting this Notice. This reply should be clearly marked as a " Reply to a Notice of-Violation" and should include for each violation: (1) the reason for the violation, or if contested, the basis for disputing the violation; (2) corrective action taken and the results achieved; (3) corrective action to be taken to avoid further violations; and (4) the date when full compliance will be achieved. Where good cause is shown, consideration may be given to extending your response time.

Dated at Lisle, Illinois this g3 day of December 1993 9312300064 DR 931223 ADOCK 05000266-PDR l