Monthly Operating Repts for Mar 1992 for McGuire Nuclear Station Units 1 & 2
ML20095A926
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 03/31/1992
From: Simmons N, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20095A915 List:
References
NUDOCS 9204210209
Download: ML20095A926 (10)


Text

- . .- - .. .. .- -. . .

. i DFERATING DATA REPORT DDCLfi N3 50-369 DATE Acril 15. 1992 00ERATlhG STtTUS CC'PLE1ED D F.A. Williaes TELEPHONE 704-373-5 % 7

1. Unit Name: ficGuire 1

.2. Re:orting Feriod: March 1(1992-March 31,1992 l 3.' Licensed Thersal h aer (Mut):- 3411 1

4. Nameplate Rating (Gress Mde): 130$* Nctes iMaaeplate Rating
5. Design Electrical Rating (Net Me): 1150 IEross M' del calcolated as
6. Mnings Dependable Capacity (Grcss Ne): 1171 1450.000 MVA > .90 power
7. Maxtrus Dependable Capacity INet Mie): 1129 -facter per Page tii, S. If Changes Occur in Capacity Eatings (!tess Nuaber 3 inrough 7) Since Last NURES-0023.

Reprt.- Give Reastos: L-

9. Pecer Level T: Which Restricted. If Any (het Myel:
10. Euson for Restricticns, If any:

This Mopth Yr.-tc-Date Cuaulative

11. Hours !c Reporting Feriod 7H.0 2184.0 90576.0
12. Nt.aber itf Ecurs Reactor lias Critical ?H.0 1376.5 63370.0

' 13. Rea:ter Reserve Statdcwn Wcurs --0-- --0-- --0--

r 114i Rours Generator Da-Lice 7H.0 1372.3 eE653.2 15i Uait Reserve Shutcoiin' Hours --0-- --0-- --0--

16. Gross Thersal Energy Generated (MWi- 2438606 4 68256 191453917-1 17. 6tess Electrical Energy Generated (NH) 853378 1560930 65920755
-_18. Net Electrical Energy Generated t."6 1 E?2616 1491331 62722364

!?. Unit Service Factor: 100.0 62.S -69.2

20. Unit Availabliity factor-- 100.0- 62.2 69.2
21. Unit Casacity Facter (Usin; MZ Net) 97.9 60.5 60.2 22._ Unit Capacity'Facter (Using DER Net) 93.7- 57.9 58.9
23. Unit F6rced Outage Rate 0.0 37.2 13.2
24. Shuteewn Sche hled Over Nest 6 Months-(Type, Date, and Duration of Ead t:

None

(:

15._If Snet Dcan At Enc Of Reprt Pe.-iod. Estisated Date of Startup:

26.-UnitsIr,TestStatus(friortoCeasarcia!0;eration)
Forecast Achieved INITIAL CR!ilCALITY INITIAL ELECTRICITY l_ COMERCIAL 0PERATION

[ ..

, s

, 9204210209 920415 PDR AD".;K 00000369

, cl- -R PDR l sm \ \] l'W.

- _ . - - . . _-~ , _ , - , ,,, , _ - . - - _ .

. .__. .. --m _ . _ - . . _ _ . - ._. . _ _ , _ . . _ . _ . . . ._, . _ _ . _ _ . _ , , . _ , _ _ . . _ . _ . _.

11 l

I

. . .\

CPERAilNB SATA REF0h 4 l

I DOCKET ND 50-?b9

UNIT McGuire 1 GTE h ril 15. 1992 ,

COMPLETED EY R.A. Williaes l I

TELEPHONE 706-373-5957 HONTH - h rth 1992 .

!Al

MERASE DAILY FD'w ER LDEL _ Li AVERASE DAILY POWER LEVEL tNe~Nei! (fr.ie Net) 1- __

!!04 17 1117 E 257 18 1123 3' 1095 29 11:3 4- 1103 20 1124-5 1103 2:  !!!!

6  !!n2 22 1123 7  !!C2 23 1122 E 1102 24 1123

. 9 ~1102 25 1125 l

10 - 1104 26  !!26

'll. 1105 27  !!!6' s

,: 12 ~ 1106' ?8 1t27 l

-'13 :'  !!!! - 29 1126 L '14 1109 30 1125 i,

15_-  !!09 31 1!24 16 1107 n

i-

DOCKET NO. 50-369 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Ticoulut. 1 DATE v4/1d/92 COMPLETED BY H. C. s1MMons REPORT MONTH March 1992 TELEPHONE (/u4]-J/3-83d9 (1) (2 (3) (4) (5) 4)

E MEi-HOD T A OF LICENSE CAUSE AND CORRECTIVE S SHUT EVENT SYS-N Y O DOWN REPORT TEM COMPONENT ACTION TO O P DURATION CODE CODE PREVENT RECURRENCE

. DATE E HOURS N R/X NO.

F A -- HH INSTRU FEEDWATER VALVE CONTROL AIR LINE 6-P 92 2 -

LEAKAGE REPAIR (3) (4)

(1)F Forced (2)

Reason- Method: Exhibit G - Instructions for Preparation of, Data 1-Manual Entry Sheets For Licensee S Sch.'duled A-Equi ment FailureB-Main enance or test (Explain) 2-Manual Scram 3-Automatic Scram (LER C-Refueling 4-Other (Explain) Event File Report (NUREG-0161))

D . Regulatory Restriction E-Operator Training & License Examination (5)  !

F-Administrative Exhibit I - Same Source l G-Operator Error (Explain)

H-Other (Explain) 1

DOCKET NO: 50-369 UNIT: McGuire 1 DATE: 4/15/92 NAPdlATIVE SUMM.GY MONTH: March 1992 McGuire Unit 1 began the month of March at 96.6% due to over power delta temperature spiking problems. Unit started power decrease at 1435 on 3/2 and held at 63% power from 1525 to 1650 to repair a feedwater valve controller line leakage. Unit was returned to 96.6% at 0333 on 3/3.

Unit reached 981 power at 0901 on 3/17 Unit remained at 981 power due to over power delta temperature for the remainder of the month.

Prepared by: N. C. Simmons Telephone: 704-373-8559

_ _ __ , _ _ _ _ _ _ _ . . _ - . . ._ _ . . . _ _ . . _. ~ ._ ~ _ . . .

F A

MONTHLY REFUELING INFORMATION REOUEST

1. Facility name: McGuirq, Unit 1
2. Scheduled next refueling shutdown: February 1993
3. Scheduled restart following refueling: Aor_[l 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, . QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be? ,

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

l5. Scheduled date(s) for . submitting proposed licensing action and supporting information.

6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of Fuel assemblies (a) in the c're: 193 (b) in the sfent fuel pool: 519
8. Present. licensed fuel pool capacity: 1463

-Size of requested or planned increase: ---

9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DUKE. POWER COMPANY 'DATE: Anril 15, 1992 Name-of

Contact:

R. A. Wil1 lams Phone: 704-373-5987 J

L E

1

..w, , , -

m

_ _ . _.. _. . _. - .. . _...m- . _ _ . _ . . _ . _ _ _ . . _ . . . .

0FERAllr45 CATA REPDni DOCrEl HD 50-370 DATE April 15. 1992 OPERA'ING STATUS COMPLETCD BY R. A. Willums TELEN0NE 704-373-5907

1. Unit Name: f.:Guire 2 -

?. Reporting Period: March 1,1992-Narth 31,1992

3. Licensed Thermal Foner (PWth 3411
4. Nameplate Rating lGross MWe): i305* Notes *Naseplate R4 ting
-5.-Design Electrical Rating (Het MWe): 1120 (Srcss NWe) calculated as-

. 6. Maxieus Dependable Capacity (Eress MWeh  !!71 - 1450.000 MVA x .90 power

7. Maxisus Dependable Capacity (Net MWe): 1129 factor per Page iii, B. If Changes Occur it. Capa:lty Ratings titens Husber 3 Through 7) Since Last NUREB-0020.

Peprt. Gne Reasonst

9. Power Level ic R:ch Restricted, If Any (Net Ne): _
10. Raasan for Eastrictions, If any:

Ints Month Yr.-trM ate C m iative 11, H:drsil e Reportirg Fer # 74.0 21Sb0 70872.0

12. Narber Of hrs Renter hs Criti:a! 323.0 $20.9 $??32.2
13. Rea: tor Reserve R ut a an ih rs --0-- -+- -+-

' 14. rieurs Senerat:r On-Line - 336.9 533.B 52826.7

15. Unit Reserve 5%t 6 n Hours - --0-- --0--

. 16. $ross inerra! Energy Benerated (Nh) E%S22 147512? 172491559 17 Gross Electrical Energy Gererated (MWM 290748 52%h 6035!3M

- IB. Met Electrical Er:ergy serierated (MWH1 26?!99 478639 57859049-

19. 1Mit 3ervic,e F u ter- 45.2 2h4 74.6
20. Unit L ailability factor 45.2 24.4 74.6
21. D*.it Ca;14:ity Facter (Using ME Net) 32.1 19.4 71.3 22.- Unit Capacity Factor (Using DEE Neti 30.7 18.6 69.2 23.-Unit Force: Outage Pate 13.4 B.9 0.1

- 24. 3hutfna 5 tedaled Over Not 4 Months Hype, Date, and Duration cf Each):

None

25. If Shut Dee At End Of Ar;;rt Period. Esti4ated Date of Etartup:
26. Units In Test Status (Frzor te Ccasarcial 0;eratten): Forecast Achieved 4

!N1TIAL CRITICALITY INITIALELECTR!Elif C W ERCIA; 0FERATION ,,

i 0FERATING DATA EEFCET J

1 DOCKET ND 50-370 1AIT McGuire 2 i DATE April 15, 1992 C0"PLETEL BY R.A. Willials J TELEffiONE _ 704-373-5997 1

MChih ' March,19'42 DAV MERASE DAILY FDER LEVEL LM AVEFASE DTJLi' POWER LEVEL L%e-Ne t 1 (Me-Ne!)

1 0 17 9

-E 0 1B 145

'3- : 0 19  %

-4 0' 20 356

-5 0 21 192 6 0 22 SM '

7- 0 23 921 S. _0 - ~ 24  !!!!

9 -0 E. 1134 10 0 26 1150 ,

11 0 27 1160 12 0 28 1161 4

_13 - 0 29  !!60 ,

~ 14 0 30 1160

15-I O 31 1160 16 0 i

Y 4

y y q a -

I $r TXat - '

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME MCuulut 2 Page l'of 2 DATE v4/13/92 .

REPORT MONTH March 1992 COMPLETED BY 74. c. s1Mnuras TELEPHONE t/us)-1/3-uddy (1) (2 (3) (4) (C)

R) MET-E HOD T A' OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O' P DURATION O DOWN REPORT- TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 92 1 S 317.77 C --

RC .FUELXX END OF CYCLE 7 - REFUELING OUTAGE 2 92- 3-14 S 24.00 A --

FD VALVEX 1 DAY DELAY DUE TO VALVE FAILURE DELAYING FUEL TRANSFER 3 92- 3-15 3 6.23 A --

CH PUMPXX 6 HOUR DELAY DUE TO AUXILIARY FEEDWATER PUMP BEARING REPAIRS 4 92- 3-15 S 7.00 A --

CA INSTRU 7 HOUR DELAY DUE TO REACTOR VESSEL ,

INSTRUMENTATION SYSTEM LEAKAGE l 5 92- 3-15 F 41.73 A --

CB PUMPXX 2.5 DAY DELAY DUE TO REACTOR COOLANT PUMP BUSSBAR REPAIRS 2-P 92- 3-17 S --

B --

HA TURBIN TURBINE SOAK FOR OVERSPEED TEST 6 92- 3-18 S 0.80 B 2 HA TURBIN TURBINE OVERSPEED TRIP TEST f l

3-P 92- 3-18 S --

B --

IA INSTRU SET REACTOR TRIP SETPOINTS g

__ u l' (1) (2) (3) (4)

F Forced Reason

  • Method: Exhibit G - Instructions S Scheduled A-Equihment FailureB-Maintenance or test (Expl3in) 1-Manual for Preparation of Data  !

2-Manual Scram Entry Sneets For Licensee C-Refueling D-Regulatory Restrictica 3-Automatic Scram 4-Other (Explain) Eyent (LER File Report (NUREG-0161))

E-Operator Training & Liwenr. Examinatiot, F-Administrative (5)

G-Operator Error (Explain)

H-Ocher (Explain)

Exhibit I - Same Source i

i i

e UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME MCuuixt z Page 2 of 2- DATE v4/Ab/92 .

REPORT MONTH March 1992 COMPLETED BY H. C. 51MMUNS TELEPHONE (/u4)-J73-uddy (1) 2) _

(4) (5) 1 E HOD T A OF LICENSE N Y S. SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN RE? ORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X HO. CODE CODE PREVENT RECURRENCE 4-P 92- 3-18 S --

B --

IA INSTRU SET INTERMEDIATE RANGE CHANNEL SETPOINTS 5-P 92- 3-19 S --

A --

CH HTEXCH "B" STEAM GENERATOR FLOW GAGE 6-P 92- 3-20 S --

B --

IA ,

INSTRU POWER RANGE NUCLEAR INSTRUMENTATION CALIBRATIONS 7 92- 3 F 10.43 A 3 HH HTEXCH TRIP DUE TO "C" STEAM GENERATOR LEVEL FAILURE 7-P 92- 3-22 F --

B --

HG XXXXXX CHEMISTRY ,

8-P 92- 3-22 F --

A --

HH VALVEX "A" FEEDWATER PUMP RECIRC VALVE 9-P 92- 3-22 S --

B --

1A INSTRU NUCLEAR INSTRUMENTATION CALIBRATION (1) (2) .

(3) (4)

' F Forced Reason

  • Method: Exhibit G - Instructions S Scheduled A-Equihment FailureB-Maintenance or test (Explain) 1-Manual for Precaration of, Data 2-Manual Scrar Entry Sheets For Licensee C-Refueling 3-Automatic S tun (LER D-Regulatory Restriction 4-Other (Expl.'a) Event File Report (NUREG-Ol61))

E-Operator Training & License Examination F-Aaministrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) ( Explain) l l

l I

i m

UNIT- McGuire 2 DATE. : 4/15/92 NARRATI t SU:4 MAR'i MONTH: March 1992 McGuire Unit 2 begm. the month of March shut down for its end-of-cycle "7" re fueling outage . The unit was placed on.line at 1244 on 3/17 to end the refueling outage. The unit was held at approximately 15% power from 1630 to 0113 on 3/18 for a turbine soak prior to the ,

turbine overspeed trip test. The unit was manually tripped at 0212 ot.

3/18 for the test and was placed back on-line at 0300 on 3/18. The unit was held at approximately 121 power from 0402 to 0615 on 3/18 to set the reactor trip setpoints. Unit held at approximately 17% power from 1000 -to 2352 on 3/18 to set intermediate range channel setpoints.

Unit decrease and held at approximately 7% power from 0100 on 3/19 to }

1751 due to ".B" steam generator flow gage problems. During power escalation, unit held at 30% power from 0210 to 1734 on 3/20 for power range nuclear instrumentation calibrations. At 0609 on 3/21 unit tr:pped due to "C" steam generator level failure, the unit was placed on-line at 1635. During power escalation, unit was held at 30% for ,

feedwater chemistry. Unit was held at 43% power from 0915 to 1005 on 3/22 due to "A" feedwater pump recirculation valve problems Unit held at 79% power from 2228 to 1639 on 3/23 for nuclear instrumentation calibrations. 'Jnit held at 90% power from 2158 to 0019 on 3/24 for -

nuclear instrumentation calibrations Uni. t held at 95% power from 0138 -

to 0232 for nuclear instrumentation calibrations. Unit held power at 99% power from 0343 'co 1121 on 3/25 for nuclear instrumentation calibrations. Unit reached 100% power at 1830 on ?/25. Unit remained at 100% for the remainder i" the mon-h.

Prepared by: N. C. Simmons Telephone: 704-373-8559

.e ILQ1[IliLY REFUELING INFORMATION REOUEST 1.- Facility name: McGuire. Unit 2

2. Scheduled next refueling shutdown: May 1993
3. Scheduled restart following refueling: July 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.
4. Will refueling ' or resumption of operation thereafter require a technical specification change or other lict'se amendment? .

If yes, whi. will these be?

If no, has reload design and core configuration been reviewed by ,

Safety Review Commit'.ee ragerding unreviewed safety questions?

5. -Scheduled date(s) for submitting proposed licensing action and supporting information.

-6. Important licensing considerations (new or different design or

-supplier, unreviewed design or performancs analysis methods, '

significant changes in design or new operatlog procedures).

7. Number of Fuel assemblies (a) in the core: 1_92 (b) in the spent fuel pool: _711
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date . of last refueling which can be accommodated by present licensed capacity: December 2003 i

! .a

' DUKE POWER COMPANY DATE: April 15, 1992 Name of.

Contact:

R. A. Williams Phone: 704-373-5987 11 , . ._ -. __ _ .. , . . - . _ , . .