Person / Time
Site: Midland
Issue date: 04/22/1983
From: Warnick R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Paton W
NRC
Shared Package
ML17198A223 List: ... further results
References
CON-BOX-09, CON-BOX-9, FOIA-84-96 NUDOCS 8406040391
Download: ML20091G877 (6)


Text

.

bN

[b

/p # "'%c,70,,

t UNITED STATES NUCLEAR REGULATORY COMMISSION

{

REGloN 911 7ee mooseveLT moAo g ?-

pp GLEN ELLYN,ILUNots 60137 i

APR 22 sg3 MEMORANDUM FOR: William D. Paton, Counsel for NRC Staff FROM:

R. F. Warnick, Director, Office of Special Cases

SUBJECT:

INTERVENOR REQUEST FOR DISCOVERY IN THE MIDLAND HEARING My April 20, 1983 memorandum to you transmitted the documents requested by the Government Accountability Project (GAP). The memo also indicated that additional documents requested verbally by GAP would be provided by Region III in the near future.

In addition to providing documents on the Construction Completion Program, we are also providing two documents in response to the earlier request.

These are listed in Attachment A and are numbered according to GAP's previous request.

If you have any questions, please let me know.

R fl<Je =*=h R. F. Warnick, Director Office of Special Cases Attachments:

A.

Listing of pertinent documents B.

Documents listed in attachment A cc w/ attachments A and B:

l PDR LPDR cc w/ attachment At See attached distribution list i

8406040391 840517 PDR FOIA RICE 84-96 PDR k.

\\

.b s

W. D. facon -

APR 2 21983 2-L

'x -

q q

cc w/ attachment At w 1 Resident Inspector, RIII The Honorable Charles Bechhoefer. ASLB The Honorable Jerry Harbour. ASLB The Honorable;Prederick P. Cowan, ASLB i

The Honora m Ralph S. Decker, ASLB Michael Miller

. Ronald Callen Michigan Public Service Comission Myron M. Cherry Barbara Stamiris Mary Sinclai W Wendell Marshall Colonel Ste've J. Gadler (P. E.)

i Howard Levin, TERA Billie P. Garde, GAP s

s -

1 i

(

\\

~1 j

W w

k i

e gN-

.h

\\

4 g.

&E

',,1-*

9 W

_d5 6

s T

T y

i

)

(

+

l A

  • .. g p

r V

D, a

'l Attachment A PREVIOUS CAP REQUEST REQUEST 5

}

Report from Stone and Webster Michigan, Inc dated April, 1983 on Independent i

Assessment of Underpinning: 90-Day Report.

REOUEST 7 Memo (Keppler to Hind and Warnick) dated April 18, 1983, regarding SALP appraisals of Zimmer and Midland; copy attached.

~4

}

CAP LETTER DATED APRIL 15, 1983 Requests 1 and 2 regarding ongoing investigations should be referred to the Office of Investigations rather than Region III l

Additional documents related to the CCP:

A.

DOCUMENTS FROM R. J. COOK FILE ON CCP 1.

CPCo letter to J. G. Keppler from J. W. Cook dated 3/29/83, Subj ect: Response to Support Reinspection 2.

NRC letter to J. W. Cook from J. G. Keppler dated 3/28/83, Subj ect: CCP 3.

CPCo memo to J. W. Cook from D. B. Miller dated 3/31/83, i

Subject:

Midland Nuclear Cogeneration Plant CCP Coordination

4..

CPCo internal correspondence to J. W. Cook from D. B. Miller dated 3/23/82.

Subject:

Midland Nuclear Cogeneration Plant CCP Coordination 5.

CPCo letter to L. E. Davis (Bechtel) from D. B. Miller dated

[

3/3/83,

Subject:

Bechtel Field Administrative Guidelines

-l 4

6.

CPCo News Release dated 12/3/82

+

7.

CPCo internal correspondence to J. W. Cook and J. A. Rutgers.

l from D. B. Miller dated 3/7/83,

Subject:

Midland Nuclear s

Cogeneration Plant CCP Coordination 8.

CPCo internal ' correspondence to 'J. W. Cook from D. B. Miller dated 4/8/83,

Subject:

1 Midland Nuclear Cogeneration Plant CCP Coordination Letter f3 with Attachments.

i J

l 4'.

t.

~

-')

s

.I B.

CCP SAMPLING BASIS FOR VERIFICATION PROGRAM FOLDER (BLB) 9.

One page handwritten notes MPQAD/CPCo/NRC Meeting 3/1/81

10. A List of all PQCI's with Quantity and Sampling Information 11.

Quality Verification Program Midland Nuclear Cogeneration Plant Units 1 and 2 C.

CONSTRUCTION COMPLETION PLAN FOLDER (BLB)

12. Draft Administrative Guideline - System Team Charter 1
13. Translation of December 2 Logic Chart to January 7 CCP Submittal
14. CCP Work Schedule dated 12/02/82 1
15. CPCo letter from J. W. Cook to J. G. Keppler dated 1/10/83,

Subject:

Construction Completion Program

16. NRC Agenda on meeting to discuss Diesel Generator Building
17. Handwritten notes on CCP Public Meeting 2/8/83 (3 pgs.)
18. Third Party Reviews
19. CPCo Agenda for Construction Completion Program ageting
20. Midland Independ ut De.ign Verification Program for the AFW System and Another System to be Determined dated 2/8/83 21.

CPCo letter from D. B. Miller to J. A. Rutgers (Bechtel),

Subject:

Construction Completion Program with attachment " Ground Rules"

22. Memo for D. G. Eisenhut from R. F. Warnick dated 12/03/82,-

Subject:

Recommendation for Notification of Licensing Board 23.

CPCo memo to Distribution List from J. W. Cook dated 12/9/82,

Subject:

Regulatory Interface - Construction Completion Program 24.

CPCo draf t letter from J. W. Cook to H. R. Denton,

Subject:

Quality Program Implementation for Soils Remedial Work.

1

25. Analysis of Current and Future Quality Activities with Regard to Remedial Soils Work
26. Draf t letter f rom J. W. Cook to H. R. Denton and J. G. Keppler

. dated 9/10/82,

Subject:

Quality Program Implementation.

27. Presentation to NRC - Construction Completion Program t

I r-rn

7 4

28.

Systems Completion Draft Release 29.

Telefax - Reduction of Most Safety-Related Work 1

i

30. CPCo letter f rom D. B. Miller to L. E. Davis,

Subject:

-Bechtel i

Field Administrative Guidelines dated 3/3/83 with letter of 3/10/83 rewording paragraph 2 of the 3/3/83 letter l

D.

DOCUMENTS FROM R. J. COOK - CCP

31. A list of all PQCI's with Quantity and Sampling Information 32.

Schedule Chart dated 1/31/83 33.

Work Schedule dated 12/02/82

34. NRC letter to J. W. Cook from J. G. Keppler dated 3/28/83 requesting additional information on the CCP
35. CPCo organization chart dated 8/30/82 (2) 36.

Significant Features of Integrated MPQAD QA/QC Organization dated 12/14/82

+

k

37. Resume of William J. Friedrich
38. Handwritten organization charts (3)
39. Test Program Continuation dated 12/9/82 with attachments 40.

CPCo news release regarding the CCP 41.

Presentation to NRC CCP 4

42.

Draf t news release December 1982 43.

Systems Completion Draf t Release dated December 1982

44. PN - Major Reduction in Safety-Related Work dated December 3,1982
45. Handwritten note dated 12/2/82 (Presentation-for Get Well Program) 46.

Memo for D. G. Eisenhut from R. F. Warnick dated 12/03/82, Subj ect:

Recommendation for Notification of Licensing Board 47.

CPCo memo to Distribution List from J. W. Cook dated 12/9/82,

Subject:

Regulatory Interface - Construction Completion Program

48. Handwritten notes dated 12/2/82 - NRC Comments on CPCo-CCP j
49. CPCo letter to J. W. Cook to J. G. Keppler dated 1/10/83,

Subject:

Construction Completion Program

)

t

t

.l-

-3 g

, ~.

v v

='

i

50. Draft Administrative Guideline - System Team Charter 51.

1 page handwritten notes

52. Memo from Bruce Peck to Ron Cook dated 1/10/83 with attachment -

CPCo letter for J. A. Rutgers (Bechtel Associates) from D. B. Miller l

dated 1/7/83 with attached list of Ground Rules t

53. Five pages handwritten notes E.

DOCUMENTS FROM ROSS LANDSMAN - CCP

54. Handwritten notes
55. CPCo letter from J. W. Cook to J. G. Keppler dated 1/10/83,

Subject:

Construction Completion Program 56.

Quality Verification Program Midland Nuclear Cogeneration Plant Units 1 and 2 1

i i

~

t 4

1 1

I j

Il' LI 4'I, i

.a

I s'

4 3

9 w

w v,

w