Responds to NRC Re Violations Noted in IE Insp Rept 50-354/84-01.Corrective Actions:Training Sessions, Reemphasizing Site Storage & Maint Requirements,Given to Field Discipline Engineers & Superintendents
ML20084M339
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/21/1984
From: Martin T
Public Service Enterprise Group
To: Murley T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20084M328 List:
References
NUDOCS 8405150331
Download: ML20084M339 (3)


Text

.

,5 -

Thomas J. Martin Public Service Electric and Gas Company 80 Park Plaza Newark, N.J.07101 201/430-8316 Vice President Eginwrig aM Cormmaion March 21, 1984 Dr. Thomas E. Murley, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631' Park Avenue King of Prussia, Pennsylvania 19406

Dear Dr. Murley:

NRC INSPECTION REPORT 50-354/84-01 NO. 1 UNIT

' HOPE CREEK GENERATING STATION Your letter dated February 22, 1984, transmitted the above referenced Inspection Report.which contained a Notice of Violation citing one item of noncompliance. .The following response is provided in accordance with the Notice of Viola-tion.

As described in the referenced Inspection Report, the four alternators of the diesel systems did not have their power re-energized following modification work completed on December 2, 1983.

Corrective Steps Taken and Results Achieved On January 11, 1984, the date of the violation, Bechtel Power Corporation restored power to the four diesel generator alternator heaters.

Corrective Steps Taken to Preclude Recurrence

1. ~The following procedures will be revised as described below to ensure that required maintenance and storage conditions are restored in a timely manner:

~

8405150331 840509 g DR ADOCK 05000354 PDR;'

F . .

r .

e l

l Dr. T. E. Murley 2 3/21/84 L

l' I a. SWP/P-2, " Project Implementation and Control of Construction Work Plan Procedure Program", will be revised to require that Work Plan / Procedure Records include the requirement for the restoration of appli-cable maintenance and/or storage conditions upon completion of work activities at the end of each shift.-

b. SWP/P-ll2, " Preparation of Field Change Orders",

will be revised to provide the Maintenance Group with copies of all Field Change Orders for changes j to permanent plant equipment. In addition, the responsible discipline field engineer's sign-off on i the Field Change Order will attest to his verifica-tion of the restoration of storage conditions.

c. SWP/P-14, " Material Receipt, Storage and Handling",

will be revised to provide Field Engineering with a daily list of any new discrepancies. The Maintenance Group will review this list on a daily basis and will flag any " time sensitive" items of equipment to the attention of the Maintenance Superintendent via a

" Discrepant Storage Condition Form".

This revision will establish the list of " time sensitive" equipment and will require a 48 hour5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> corrective action' period if discrepancies are found.

The revision will also provide for escalation of problems to higher levels of management as required.

.2. Training sessions, reemphasizing the site storage and maintenance requirements, have been given to field disci-pline engineers, superintendents, craft foremen and general foremen. These sessions also addressed the changes to the implementing procedures described above.

3. Bechtel has established a brief list of storage and maintenance "Do's and Don'ts". This list will be distributed to craft foremen for discussion in weekly "gangbox" meetings with craft personnel. The list of "Do's and Don'ts" will be revised weekly.

$ O p= . L -

Dr. Thomas E. Murley 3 3/21/84 Date o'f Full Compliance The restoration of storage conditions t'o the diesel generator alternators was completed on January 11, 1984.

The procedural revisions will be issued by April 20, 1984.

The training sessions for engineering and supervisory personnel were completed by March 1, 1984. ,

t The issuance of the weekly list of storage / maintenance "Do's and Don'ts" will commence by April 2, 1984.

Very truly yours, r

C Office of Inspection and Enforcement i Division of Reactor Construction Inspection  ;

Washington, D. C. 20555 NRC Resident Inspector - Hope Creek P. O.- Box 241 Hancocks Bridge, NJ 08038