05000354/LER-1999-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made

From kanterella
Jump to navigation Jump to search
Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made
ML20205F734
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 03/26/1999
From: Bezilla M
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20205F736 List:
References
LR-N990143, NUDOCS 9904060401
Download: ML20205F734 (2)


LER-2099-003, Forwards LER 99-003-00,as Found Values for Safety Relief Valve Lift Setpoints Exceed TS Allowable Limits,Per Requirements of 10CFR50.73.Attachment a Contains Commitments Made
Event date:
Report date:
3542099003R00 - NRC Website

text

f.

f O PSIRG Public Service Electric and Gas Company P.O. Box 236 Hancocks Bridge, New Jersey 08038-0236 Nuclear Business Unit MAR k 61999 LR-N990143 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Dear Sir:

HOPE CREEK GENERATING STATION DOCKET NO. 50-354 UNIT 1 l LICENSEE EVENT REPORT 99-003-00 I This Licensee Event Report entitled "As Found Values for Safety Relief Valve Lift l Setpoints Exceed Technical Specification Allowable Limits"is being submitted pursuant to the requirements of 10CFR50.73(a)(2)(i)(B).

Sincerely, A/

Mark Bezilla General Manager -

Hope Creek Operations l CEM T C Distribution -

LER File i 9904060401 990326 c:l l

.c DR ADOCK 05000354 '

S PDR u

'A nmerisin yurhard j 942168 REV. 694 l

)

f.

Document Control Desk UD LR-N990143 i

Attachment A The following items represent the commitments that the Public Service Electric and Gas Company is making to the Nuclear Regulatory Commission relative to LER 354/99-003-00:

1. The results of the platinum ion implantation will be further evaluated after ;

Cycle 9 for its effectiveness at reducing setpoint drift.

l

2. PSE&G will work with the vendor to ensure that adequate corrective i action is taken prior to allowing the vendor to perform additional work for Hope Creek.