Submits Completion of Requested Actions for NRC Bulletin 96-003, Potential Plugging of ECCS Strainers by Debris in Bwrs
ML20206D330
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 04/27/1999
From: Eric Simpson
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-96-003, IEB-96-3, LR-N99202, NUDOCS 9905040055
Download: ML20206D330 (4)


Text

I Pubhc Servce Dectre and Gas i

., a* Company l E. C. simpson Pubhc Service Electric and Gas Company P O Box 236. Hancocks Bridge. NJ 08038 609-339 1700 Semor Vre President - Nuclear Engmeer g LR-N99202 l l

United States Nuclear Regulatory Commission Document Control Desk l l

Washington, DC 20555 COMPLETION OF REQUESTED ACTIONS - NRC BULLETIN 96-03 i POTENTIAL PLUGGING OF EMERGENCY CORE COOLING SUCTION STRAINERS BY DEBRIS IN BOILING WATER REACTORS HOPE CREEK GENERATING STATION FACILITY OPERATING LICENSE NPF-57 l DOCKET NO. 50-354 Gentlemen:

On May 6,1996, the NRC issued Bulletin 96-03, " Potential Plugging of Emergency Core Cooling Suction Strainers by Debris in Boiling Water Reactors," to request licensees to implement appropriate procedural measures and plant modifications to minimize the l potential for clogging of emergency core cooling system (ECCS) suppression pool suction strainers by debris generated during a loss-of-coolant accident (LOCA). The Bulletin also required licensees to submit two reports; the first describing planned actions, and the second confirming completion and summarizing the actions taken.

Public Service Electric & Gas Company (PSE&G) described the planned actions for the Hope Creek Generation Station in letters dated November 4,1996, May 20,1997 and //-

/

July 18,1997. PSE&G committed to install large capacity passive strainers on the Core Spray and Residual Heat Removal (RHR) pump suction lines to ensure long term operability of the ECCS. The NRC evaluated the criteria for sizing the replacement -

suction strainers in a safety evaluation dated October 31,1997. By letter dated 17

. June 5,1998, PSE&G provided updated information addressing issues discussed in the O NRC safety evaluation.

PSE&G completed installation of the replacement large capacity passive strainers on the Core Spray and RHR pump suction lines during the Hope Creek refueling outage completed on March 31,1999. The replacement strainers have sufficient capacity to preclude the loss of net positive suction head (NPSH) due to debris accumulation fo! lowing a LOCA.

Replacement strainers were not installed on the High Pressure Coolant Injection (HPCI) system pump suction since the HPCI system does not function to provide long-term cooling after a LOCA.

^ "'

9905040055 990427 PDR ADOCK 05000354 G

PDR _

h De$pam

APR 271999 Document Control Desk ,, LR-N99202 PSE&G does not propose to add a surveillance requirement for strainer inspection to the Hope Creek Technical Specifications. Inspections performed during drywell and suppression pool closecut, in combination with foreign material exclusion control, provide adequate administrative controls for ECCS pump suction strainer operability.

Suppression pool cleaning will continue to be performed at a frequency sufficient to ensure the assumed debris loading for the replacement strainers is not exceeded.

PSE&G has completed the actions requested by Bulletin 96-03 for Hope Creek. No additional action is required by PSE&G.

Should you have any questions regarding this report, please contact Mr. Paul Duke at 609-339-1466.

Sincerely l

l l

Affidavit i

l l

l 4

l#$ 4933 1

F, ,

as7 ms 1

REF: LR-N99202 l STATE OF NEW JERSEY )

) SS.

COUNTY OF SALEM )

l i

l E. C. Simpson, being duly sworn according to law deposes and says:

I 'I am Senior Vice President - Nuclear Engineering of Public Service Electric and Gas Company, and as such, I find the matters set forth in the above referenced letter, concerning the Hope Creek Generating Station, are true to the best of my knowledge, information and belief.

l r

~v -

Mp-l Subscribed and Swor before me l

i thisd7fb day o Ab[

/

.,1999 l

c in n k1Ld(LbALB7kxL

'Nj5tary Public[of Sv Jdrsdy My Commission expires on Jhv;UL, /[r MO3 l b

95-4933 l

j

, u APR 27 2 3 l l

Document Control Desk ..,, .LR-N99202  !

i PRD-l 1

C Mr. H. Miller, Administrator - Region l l U. S. Nuclear Regulatory Commission l 475 Allendale Road t King of Prussia, PA 19406  !

1 Mr. R. Ennis  !

Licensing Project Manager - Hope Creek j U. S. Nuclear Regulatory Commission '

One White Flint North Mail Stop 8B1 11555 Rockville Pike Rockville, MD 20852 i

USNRC Resident inspector Office (X24) l l

i Mr. K. Tosch, Manager IV  !

Bureau of Nuclear Engineering j P. O. Box 415

{

Trenton, NJ 08625 3 l

I e