ML20078A559

From kanterella
Jump to navigation Jump to search
Forwards Module 6 of Vogtle Unit 2 Readiness Review Program, Entitled Electrical Equipment for Review & Acceptance
ML20078A559
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 12/17/1987
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20078A351 List: ... further results
References
GN-1418, NUDOCS 9406020219
Download: ML20078A559 (3)


Text

Gacrgia Power Company Post Office Box 282 Waynesboro, Georgia 30830 Telephone 404 554 9961. Extension 3413 404 724 8114. Extension 3413 o December 17, 1987 Georgia Power A

iceIre*sioent Vogtle Project ne soonvrn es (inc sstem File: X7BD102 Log: GN-1418 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555

Reference:

Vogtle Electric Generating Plant - Unit 2 Readiness Review Program Module 6 of the Vogtle Unit 2 Readiness Review Program, entitled Electrical Equipment, is enclosed for review and acceptance by the Nuclear Regulatory Commission (NRC).

Based on the review detailed in this module, I am of the opinion that adequate controls exist to ensure the quality of work and the implementation of Final Safety Analysis Report commitments within the scope of the module. Additionally, with resolution of the specific findings identified, the Project will fully comply with our licensing commitments.

The information herein is, to the best of my knowledge, factual and technically correct.

This submittal contains no proprietary information and may be placed in the NRC Public Document Room.

P. D. Rice RWM/PRD/bjd Enclosure ]

xc: See attachment i

9406020219 PDR 940512

,..P; O ADDCK' 05000424 i

@f6M )

xc: Cover Letter:

H. G. Baker, Jr. J. E. Swartzwelder R. E. Conway G. A. McCarley J. P. O'Reilly L. T. Gucwa D. R. Altman D. H. Smith, (OPC)

J. A. Bailey J. E. Joiner, (TSLA)

G. Bockhold, Jr. NORMS G. R. Frederick RR File Module Distribution:

P. D. Rice NRC:

D. E. Dutton J. N. Grace R. A. Thomas M. V. Sinkule (3)

C. T. Moore L. Lewis

() R. H. Pinson C. W. Whitney J. Hopkins (2)

R. J. Schepens W. C. Ramsey D. T. King R. W. McManus (5)

L. B. Glenn ,

A. W. Harrelson C. W. Hayes E. D. Groover D. W. Strohman T. E. Richardson f

O-U 0822C/342-7

I Southern Company Services, Inc.

Date: December 18, ~.1987 Re: VEGP Unit 2, Readiness Review Module 6 From: R. T. Oedamer Supervisor, Technical Writing Engineering Publications Engineering and Project Services i h M su&

To'- "

h.n h bb,lh/

Attached is the basic issue of or changes to the subject manual.

If this package contains revisions, please revise your manual according to the Revision Insertion Instructions provided and destroy all superseded material. If the attached package of change pages does not correspond to the insertion instructions provided, notify Chris Burson at extension 7154 .

WHETHER THE PACKAGE IS A BASIC ISSUE OR CHANGED PAGES, YOU MUST SIGN BELOW. YOUR SIGNATURE ACKNOWLEDGES RECEIPT, THAT YOUR COPY OF THE MANUAL HAS BEEN BROUGHT TO CURRENT STATUS, AND SUPERSEDED j POLICIES AND PROCEDURES HAVE BEEN REMOVED AND DESTROYED. RETURN  ;

THIS ENTIRE ACKNOWLEDGEMENT RECEIPT PAGE WITHIN 15. WORKING DAYS l FROM THE ABOVE DATE TO: 1 SOUTHERN COMPANY SERVICES, INC. j SUPERVISOR, TECHNICAL WRITING  !

ROOM 210 BUILDING 42 BIN B223 P.O. BOX 2625 BIRMINGHAM, AL 35202 ,

MANUAL TITLE VEGP Unit 2, Readiness Review Module 6  ;

SIGNATURE COPY NO. NA REV. DATE I2/87 If the information on the mailing label is incorrect please provide the corrections in the space below. i Name Dept Room Bin Location (

City, State 3 Zip Code i

2

, - - - - - - - - - _ _ _ _ . . _ - - - . -