Forwards Update to Module 3A of Vogtle Unit 2 Readiness Review Program,Entitled Initial Test Program - Preoperational Test Phase for Review & Acceptance
ML20078A535
Person / Time
Site: Vogtle  
Issue date: 11/15/1988
From: Rice P
GEORGIA POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20078A351 List: ... further results
References
GN-1508, NUDOCS 9406020187
Download: ML20078A535 (5)


Text

i Georgis Power Company Post Office Box 282 Waynesboro, Georcia 30830 Telephone 404 5s4 9961. Ext:nsion 3413 404 724-8114. Extension 3413 C

L

)

,, m, Georgia Power

.Novem6(rk0,1988 smj Vice President Vogtle Project me sovmern electre system United States Nuclear Regulatory Comission ATTN:

Document Control Desk File:

X730102 Washington, D. C.

20555 Log:

GN-1508

Reference:

Vogtle Electric Generating Plant - Unit 2 Readiness Review Program An update to Module 03A of the Vogtle Unit 2 Readiness Review Program, entitled Initial Test Program - Preoperational Test Phase, is enclosed for review and acceptance by the Nuclear Regulatory Comission (NRC).

This update is to be inserted into your copy of the module as directed by the i

enclosed Revision Insertion Instructions.

This update contains yellow pages denoting the following report revisions:

1) Revision 2 to Phase 1.

f'~)

This revision reflects editorial changes, project status changes,

(

and a change in the effective FSAR amendment.

wJ

2) The Phase 3 evaluation.

Phase 3 consists of a test procedure implementation assessment, followup on phase 1 comitment implementation, and followup on phase 1 and phase 2 corrective actions.

Phase 3 is the final pha'se of a three-phase review of the initial test program.

Based on the review detailed in this module, I am of the opinion that, with implementation of corrective actions to the findings identified, the initial test program - preoperational test phase is proceeding in conformance with licensing comitments and program test procedures.

The information herein is, to the best of my knowledge, factual and technically correct.

This submittal contains no proprietary information and may be placed in the NRC Public Document Room.

3 9406020187 940512 PDR ADOCK 05000424

. D. Rice J'

h P

PDR

)

RWM/PDR/bjb

- - + -

mp MPICIAL COL v

Enclosure u

V' xc:

See attachment 1 & cthtJ Y &.5 g-

_ =. - -..

i-I GN-1508 Page 2 xc:

Cover letter:

H. G. Baker, Jr.

G. R. Frederick R. P. Mcdonald D. H. Smith, (OPC).

D. R. Altman J. E. Joiner, (TSLA)

J. A. Bailey NORMS R. H. Pinson RR File G. Bockhold Module Distribution:

NRC:

P. D. Rice M. L. Ernst D. E. Dutton M. V. Sinkule (3)

R. A. Thomas R. P. Correia W. C. Ramsey J. B. Hopkins D. T. King C. Burger R. W. McManus (3)

H. M. Handfinger J. E. Swartrwelder C. W. Hayes E. D. Groover R. T. Oedamer 0171c/320-8 t'

b

7-l 4

3 READINESS REVIEW - UNIT 2, MODULE 03A PHASE 1, REVISION 2, AND PHASE 3

)

Revision Insertion Instructions November 17, 1988 Paces / Sections Instructions Paul Rice's letter to the NRC Replace letter for phase 2 Summary of Changes Insert in front of phase 1, revision 1 Summary of Changes J

Executive Summary, phase 3 tab Insert behind Executive Summary, phase 2 Executive Summary, phase 3 Insert behind Executive Summary, phase 3 tab Table of Contents Replace Section 1 Replace Section 3 Replace Commitment Matrix and Replace Explanation of Fields Implementation Matrix and Replace Explanation of Fields Section 6.3 tab Insert behind section 6.2 Section 6.3 Insert behind section 6.3 tab Project Letters insert behind project letters for phase 2 Revision Insertion Instructions Use and discard

' O Ol72c/320-8 m

READINESS REVIEW - UNIT 2 MODULE 03A PHASE 1.

REVISION 2 f-N

'l

\\

Summary of Changes

'%_-l November 17, 1988 Pace Chance Page 1-1 Effective module date change and effective FSAR amendment change.

Page 1-3 Change in project status.

Page 3-1 Editorial change.

Page 3-3 Changes in text for the phase 3 submittal of the commitment and implementation matrices and effective FSAR amendment change.

(-x\\

L) 7.-

k~

f

%s' Ol72c/320-8

v Southern Company Sarvices, Inc.

Date:

January 15, 1988 Vootle Electric Generating Plant Unit 2',

"': 23 Re:

Readiness Review Module 3A From:

R.

T.

Oedamer Supervisor, Technical Writing Engineering Publications Engineering and Project Services

)

To:

i G W E > ul. ;..

'i-- ~

n;, t.1:a :-

r,,

___sa.

F : :..,.. : ; :

e. c. r e a.,

Attached is the basic issue of or changes to the subject manual.

If this package contains revisions, please revise your manual according to the Revision Insertion Instructions provided and destroy all superseded material.

If the attached package of i

change pages does not correspond to the insertion instructions provided, notify Chris Burson at extension 7154 WHETHER THE PACKAGE IS A BASIC ISSUE OR CHANGED PAGES, YOU MUST SIGN BELOW.

YOUR SIGNATURE ACKNOWLEDGES RECEIPT, THAT YOUR COPY OF THE MANUAL HAS BEEN BROUGHT TO CURRENT STATUS, AND SUPERSEDED POLICIES AND PROCEDURES HAVE BEEN REMOVED AND DESTROYED.

RETURN THIS ENTIRE ACKNOWLEDGEMENT RECEIPT PAGE WITHIN 15 WORKING DA FROM THE ABOVE DATE TO:

SOUTHERN COMPANY SERVICES, INC.

SUPERVISOR, TECHNICAL WRITING ROOM 210 BUILDING 42 BIN B223 P.O.

BOX 2625 BIRMINGHAM, AL 35202 MANUAL TITLE VEGP-2 Readiness Review Module 3A SIGNATURE COPY NO. N/A REV. DATE 1/88

\\

If the information on the mailir.g~1abel is incorrect please provide the corrections in the space below.

i Name Dept Room

, Bin Location City, State Zip Code i

npP OFF!CI AL COPY t