Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20212J1891999-10-0101 October 1999 Safety Evaluation Supporting Exemption from 10CFR54.17(c)re Schedule to Apply for Renewed Operating Licenses ML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20212G1211999-09-22022 September 1999 Safety Evaluation Supporting Amends 188 & 169 to Licenses NPF-9 & NPF-17,respectively ML20212G2671999-09-22022 September 1999 Safety Evaluation Supporting Amends 187 & 168 to Licenses NPF-9 & NPF-17,respectively ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20211P1371999-09-0808 September 1999 Safety Evaluation Supporting Amend 186 to License NPF-9 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis 05000369/LER-1999-001-04, :on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review1999-03-31031 March 1999
- on 990306,TS SR for Ice Condenser Lower Inlet Doors Was Not Met.Caused by Failure to Recognize That Recorded Valve Was Outside Acceptance Criteria.Mgt Reinforced Expectations for Procedure Performance & Review
ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B7991998-09-28028 September 1998 Safety Evaluation Supporting Amends 183 & 165 to Licenses NPF-09 & NPF-17,respectively ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage 05000369/LER-1998-006-02, :on 980812,noncompliance with Ice Condenser TS SR 4.6.5.1b.3 Noted.Caused by Lack of Clear Documentation Re Interpretation of TS SR 4.6.5.1b.3.Submitted TS Amend to Clearly Establish SR & Will Review Ice Condenser TSs1998-09-11011 September 1998
- on 980812,noncompliance with Ice Condenser TS SR 4.6.5.1b.3 Noted.Caused by Lack of Clear Documentation Re Interpretation of TS SR 4.6.5.1b.3.Submitted TS Amend to Clearly Establish SR & Will Review Ice Condenser TSs
1999-09-08
[Table view] |
Text
.
OPERATING DATA REPORT DOCKET NO. 50-369 DATE 2-15-83 CO.\\!PLETED BY J. A. Reavis TELEPIIONE 704-373-7567
^
OPERATING STATUS McGuire Unit 1 Note '
- 1. Unit Name:
@ross MWe) calculated as January 1, 1983-January 31. 1983
- 2. Reporting Period:
1450.000 MVA x.90 power 3411
- 3. Licensed Thennal Power talWtt:
factor per Page 111, 1305*
~
- 4. Nameplate Rating (Grow MWei:
NUREG-0020.
1180
- 5. Design Electrical Rating INet MWe):
- 6. Maximum Dependable Capacity (Grow MWe):
1180
' 7. Maximum Dependable Capacity INet MWe):
S. If Changes Occur in Capacity Rating titems Number 3 Throu;h 7)Since Last Report.Give Reasons:
None None
- 9. Power Level To Which Restricted.lf Any (Net MWe):
- 10. Reasons For Restrictions. lf Any:
This Month Yr..to Date Cumulative 744.0 744.0 10 248.0
- 11. Ilours In Reporting Period 494.9
'494.9 7 633.0
- 12. Number Of Ilours Reactor Was Critical
- 13. Reactor Reserve Shutdown flours
- 14. Ilours Generator On Line 494.9 494.9 7 587.1
- 15. Unit Resene Shutdown flours 857 172 857 172 14 359 590
- 16. Gross Thermal Energy Generated (MWil)
- 17. Gros > Electrical Energy Generated (MWil) 293 826 293 826 4 920 417 272 412 272 412 4 593 735 IS. Net Electrical Energy Gener:..ed (MWil) 66.5 66.5 74.0
- 19. Unit Service Factor 66.5 66.5 74.0
- 20. Unit Availability Factor 31.0 31.0 38.0
- 21. Unit Capacity Factor IUsing MDC Neti 31.0 31.0 38.0
- 22. Unit Capacity Factor IUsing DER Net) 0.8 0.8 21.3
- 23. Unit Forced Outa;c Rate
- 24. Shutdowns Scheduled Oser Nest 6 Months (Type. Date.and Duration of Eschi:
Currently Doing Steam Generator Modification April 8, 1983 2.i. If Shut Down At End Of Report Ptriod. Estimated Date of Startup:
- 26. Units in Test Statu> (Prior to Commercial Operation!:
Forecast Achined INITIA L CRITICA LiTY INITI A l. I'. LLC l RICIIY CO\\lMI.RCI A L OPl~.R A flON l
py7;i C302180319 830215 PDR ADOCK 05000369 R
PDR
50-369 UNITSilUTDOWNS AND POWER REDUCTIONS DOCKET NO.
UNIT NAh!E McGuire 1 DATE 2/15/83 COMPLETED BY J. A. Reavis RE!' ORT Af 0NTl! January, 1983 TELEPilONE 704-373-7567
~
.5'E 3
5' k Licenice
,Ew h".
Cause & Cosreceive N"-
D ite 3-5@
2s5 Event 3?
!-?
Action to
$5 d
j@
Report c
<N U jU Prevent Recurrence Q
1-p 83-01-01 F
H CB HTEXCH Limited to 50% power while awaiting modification to steam generator.
1 83-01-21 F
4.13 A
3 CB RELAYX
'D' reactor coolant pump tripped when auxiliary relay in safety breaker cabinet failed.
lA 83-01-21 S
245.00 H
CB HTEXCH Begin outage to modify steam generator design.
I 2
3 1
F: For cet!
Reason:
Methot!:
Exhibit G Instructions S: Scheilulett A.Eiguipment Failure (Explain)
I-Manual for Preparation of Data H4taintenance of Test 2 Manual Scram.
lintry Sheets for I.icensee C Refueling 1 Automatic Scram.
Event Report (LER) Fife (Nt!RI:G.
D Regulatory Restriction 4 Other (lixplaint 0161)
E-Ope.aior Training & License Examination F-Administ rative 5
G Opetational Error ! Explain)
E.shibii 1 Same Somee (9/77)
Il Oiher (Explain)
DOCKETNO.
50-269 UNIT.McGuire 1 2-15-83 DATE
~
AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1983 AVERAGE DAILY l'0WER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)
DAY (MWe net) 1 554 17 562 553 18 559 2
3 19 559 554 4
553 20 560 550 21 336 5
553 22 6
553 23 7
552 24 8
~
553 25 g
~
552 26 10 551 27 11 12 555 28 13 560 29
-~
14 564 30 564 31 15 16 561 DAILY UNIT POWER LE\\'EL FOR\\t INSTRlMTIONS On this fonn, hst the averare daily timt power lesel in MWe net for each day m the reporting n.onth.
Compute to the nearest w nole megawatt.
These figutes will I e used to plot a graph l'or each reportint; month. Note that by usin[i maximurr.
dependable capacity tor the net electrical ratm of the unit. tliers may be..t easions when the daily j
average power leve eucetis the 100 hoe f or tlie restricted power lesel knel. In such e.ises. the average daily unit power output sheet should be footnoted to t splam tiie app.uent artomaly.
O
DOCKET NO:
50-369 UNIT:
McGuire 1 DATE:
2-15-83 NARRATIVE SLDDIARY Monch: January, 1983 McGuire Unit 1 entered the year at 50% full power and continued to
~
operate at this level until the unit tripped off-line on January 21.
The unit tripped at 1452 when an auxiliary relay in the safety breaker cabinet failed causing the electronics to behave as though the 6900 volt supply breaker had tripped. This caused a low flow indication in one reactor coolant loop which in turn caused a reactor trip. The unit continued to cooldown to begin a scheduled outage for the steam generator modification.
Ice weighing, a high pressure turbine inspection, generator work, and moisture separator work will also be completed within this outage. The unit is expected to return to service at full load in April, 1983.
e o
e O
e
=
MONTHLY REFUELING INFORMATION REQUEST McGuire Unit 1 1.
Facility name:
2.
Scheduled next refueling shutdown:
January, 1984 3.
Scheduled restart following refueling:
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
N/A If yes, what will these be?
i If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A S.
Scheduled date(s) for submitting proposed licensing action and supporting information:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
N/A 7.
Number of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:
27 8.
Present licensed fuel pool capacity:
500 Size of requested or planned increase:
9.
Projected date of last refueling which can be accommodated by present licensed capacity:
DUKE POWER COMPANY Date: February 15, 1983 Name of
Contact:
J. A. Reavis Phone:
~
~
-e-..
_.-.w._,_
. ~
McGUIRE NUCLEAR STATION Operating Status Report 1.
Personnel Exposure For the month of December, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.
2.
The total station liquid release contribution to whole body dose for December has been compared with the Technical Specifications annual value of 3 mrem; the total release for December was less than 10 percent.
The total station gaseous release contribution to any organ dose for December has been ' compared with the Technical Specifications annual value of 15 mrem; the total release for December was less than 10 percent of this limit.
i i
4
.1
.i -
"?2 w
e vyq--y-'+