ML20070Q979

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1982
ML20070Q979
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 12/09/1982
From: Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To:
Shared Package
ML20070Q970 List:
References
NUDOCS 8301270223
Download: ML20070Q979 (6)


Text

.

AVERAGE DAILY UNIT POWER LEVEL

]_ _ _ , ' E DOCKET NO. 50-387 t

RT One DATE 12-9-82

(+ L.A. Kuczynski yg gi COMPLETED BY TELEPHONE I717?942-2181 MONTH November, 1982 l

DAY AVERAGE DAILY POWER LEVEL 9AY AVERAGE DAILY POWER LEVEL l (MWe-Net) (MWe-Net)

I 17 149 2 18 134 3 19 132 l 4 3 0 5 21 0

0 6 n l

7 23 31 S _ u O l

9 25 96 10 26 209 11 27 271 12 28 .

10 13 29 --

248 14 30 314 l 15 31 ..

  • 16 111

!

  • Based on 1127 synchronization on 11-16-82.

INSTRUCHONS

. On this format, list the average daily utiit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8301270223 821214 PDR ADOCK 05000387 R PDR E

ANN 4 D

@(v31 /

.._. q 3 7  %+

u -

RII1M J OPERATING DATA REPORT 0 DOCKET NO. 50-387 is DATE 12-9-82 NIC 59 COMPLETED BY L . A . Kuczynski TELEPHONE (717 ) 54 2-2181 OPERATING STATUS

1. Unit Name: S_qspf ehanna Ste E ectric Statiort Notuta co ed 13-8:!.
2. Reporting Period: . November, 1982 Initial Generator syn-
3. Licensed Thermal Power (Mht):

3293 chronization 11-16-82 at

4. Nameplate Rating (Gross M'Ve): 1280 X 0.9=1052 0932.
5. Dedgn Electrical Rating (Net MWe): -1052 - 41=1011
6. Maximum Dependable Capacity (Grcss MWe):
  • *MDC to be determined.
7. Maximum Depeadable Capacity (Net MWe):

. 8. If Changes Occur S Capacity Rating * (Items Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level To Which Restricted,if Any (Net MWe): _
10. Reasons For Mr.strictions. lf Any:

This Month '/r.-to.Date Cumulative

11. Hours In Esporting Period ** 34S.5 348.5 348.5
12. Number Of Hours Reactor Was Critical 256.5 256.5 256.5
13. Reactor Reserve Shutdown Hours 31.5 31.5 31.5
14. Hours Generator On-Line 212.2 212.2 212.2
15. Unit Reme Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 185,559 185,559 185,559
17. Gross Electrical Energy Generated (MWH) 44,990 44,990 44,990
18. Net Electrical Energy Generated (MWH) 38,648 38,648 38',648
19. Unit Service Factor N/A , _.
20. Unit Availability Factor N/A
21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. P5 tit Forced Outage Rate N/A _
24. Shutdowns Scheduled Over Neat 6 Months (Type. Date.and Duration of Each):

None.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY 9-7-82 9-10-82

!NITIAL ELECTRICITY 11-19-82 11-16-82 COMMERCIAL OPERATI9N 5-15-83

    • Initial electrical production: 11-16-82 at 1127.

(9/771

pANN

,O m ,Yf 'y .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 5J-387 E UNIT NAMESu squoh ann a Thi it 1 A[ DATE 19 o n?

Nuczyn s.]:i IC N REPORT MONTH November 1982 COMPT.ETED BY L.A.

TELEPHONE (717)542-2181 m

39 Yg Licensee P, "., Cause & Carrective No . Date

o. 3g }j; ,cg5 Event a3 Action to d'

H

$E. 5 j pj g Report # mO

[U Prevent Recurrence S

821101 F 7.5 H 3 N/A HA INSTRU I&C Technician grounded the EIIC negative voltage resulting in a bypass valve transient with sub- -

sequent reactor vessel level transient. I&C personnel were counseled and cautioned to pre ,

vent any similar grounding everJ s when dealing with such floatir3 ground systems.

821103 S 36 H 2 N/A ZZ ZZZZZZ End of pre-turbine roll outage.

821110 F 16.6 II 3 N/A IE INSTRU Pressure transient occurred in the variable leg of the RPV lev--

el transmitters, while being re -

turned to service following a surveillance test. System design preventive measures and testing modification are being investi-gated.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram- Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

EOpesator Tiaining & ljcense Examination F-Administrative 5 G Opentional Error (Explain) Exhibit I - Same Source (9/77) Il-Other (Explain)

N & '

g,irw@ n. y>

DOCKET NO. 50-387 UNITSHUTDOWNS AND POWER REDUCTIONS M U UNIT NAME Enenohnnn' YMitl ff DATE l ' - 9 o ')

  1. fC @g COMPLETED BY L.A. Kuczynski REPORT MONTH November 1982 TELEPHONE (717) S42-2182 I .

- E E o.

.$ g }:; },j5Ili Licensee E-t, ja, Cause & Corrective No. Date 3g Event p a8 Action to H

$= 5 jgg Report # mO

[O Prevert Recurrence S

1 821116 S 2.0 B 1 N/A ZZ ZZZZZZ Generator tripped to perform

. turbine overspeed trip tests.

2 821120 S 69.2 B 2 N/A ZZ ZZZZZZ Manual scram performed in accor -

dance with startup test schedule.

3 821123 F 14.8 H 3 N/A IE INSTRU RPV level transient caused by I&C Valving in a pressure in-struments. System design, pre-ventive measures and testing modifications are being inves-tigated.

4 821124 F 28.4 A 3 N/A CH CKTBRK Feedwater level controller placed in AUTO and went into divergent oscillations causing feed pumpt and main turbine to trip on hic h level. Controller was " tuned up" prior to being used in AUTC again.

I 2 3 4 F: Forced Reason: Method: Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Reporn (LER) File (NUREG-D-Regulatory Restriction 4-01her (Explain) 0161)

E-Operator Training & Ucense Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Same Source (9/77) IIOther(Explain)

ANN y -

'L_

n,rr i

=

N- N l UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-387 PPal UNITNAMESusouehanna Unitl DATE 12-9-82 I4 N COMPLETED BYL. A. Kuczynski REPORT MONTH November 1982 TELE" HONE (717)542-2181 t,

e. I EE I E
, .! ? "ij Licensee Eg {% Cause & Corrective No. Date g g  ;; 3.Ei g& g'g f] Action to Event c H

$5 5 j ;f5 g Report # mO Prevent Recurrence d

f 5 821128 F 24 3 3 N/A HA INSTRU Turbine control valve fast closure. trip occurred during surveillance test. Yielded a

! full RPS trip. Future testing to be conducted with reactor power let.s than 24%.until in-stallation of orifices in EHC System piping.

,a i 2 3 . 4 F: Forced Rea.on: Method: Exhibit G Instructions S: Scheduled A-Equipment Failure (Explain) 14:anual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for I.icensee .

C-Refueling . 3-Automatic Scram. Event Reporn (LER) File (NUREG-D-Regulatory Restriction 4-Osher (Explain) 0161)

E-Operator Training & IJcense Examination F-Adninistrative 5 G-Operational Error (Explain) Exhibis 1 - Same Source (9/77) Il-Other(Explain)

PreL FORD 19

, 'FPsL i

SUSOUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 12-9-82 Completed by: L.A. Kuccvnski Telephone (717)S42-2181 November, 19924 Challanges to Main Steam Safety Relief Valves None.

Changes to Offsite Dose Calculation Manual None.

Major Changes to Radioactive Waste Treatment Systems None.

P E NNSYLVANI A POWE R & LIGHT COMPANY