r OPERAllN6DATAREPORT DOCrEl ND 50-369 DATE Eebruary 15. 1991 OPEMilNS STATUS COMPLETEDBY R.A. Willi ns TELEPHDNE '704 373-5987
- 1. Unit Nase: Mc6uire 1
- 2. Reporting Ferit-d January 1, 1991 January 31,1991
- 3. Licensed Thersal Power (MWt): 3411
- 4. Waseplate Ratlog (Stoss MWell 1305a- Notes _aNatcplate Rating _
5.DesignElectricalRating(NetMWe): 1190 - (BrossHWelcalculated.as
- 6. Manteus Dependable Capacity (Bross MWelt 1171 1450.000 MVA a .90 power
- 7. Manisue Dependable Captity (Net MWe): 1129 factorperPage111,
- 9. If Changcs Occur in Capacity Ratings (liens Nusber 3 Through 7) Since Last NURE6 0020.
Report. Give Reasons:
9.Powertevel10WhichRestricted,ifAny(NetMWe):
- 10. Reason For Restrictions, if any:
ThisMonth yr.-to Date Cuculative ,
- 11. Hours in Reporting Period 744.0 744.0 80376.0
- 12. Nueber Of Hours Reactor Was Critical 744.0_ _ 744.0 56409.9 .!
- 13. Reactor Reserve Shutdonn Hours - .- -- 0--
- 14. Hours Generator Dn*Line 744.0 744.0 55764.0 15.UnitReserveShutdennHours --0--
- --0--
16,6tossThersalEnergyGenerated(MWHi 2519888- 2519888 168755450 17.GrossElectricalEnergyGenerateo(MWH) .003404 883484 58105919 19.NetElectricalEnergyBenerated(MWH) 850359 850359 $5470363
- 19. Unit Service Factor 100.0, 100.0 69.4
- 20. Unit Availability Factor 100.0- 100.0 69.4
- 21. Unit Capacity Factor (Using MDC Net) 101.2 ~ 101.2 59.7
- 22. Unit Capacity Factor (Using DER Net) 96.9 96.9_ 58.5
- 23. Unit Forced Outage Pate 0.0 L
- 0.0 12.7
- 24. Shuldean Scheduled Over Nett 6 Months (Type, Date, and Duration of Each! .
Nnnn
- 25. If Shut Down At End Of Report Period. Estiested Date of Startup
' j
- 26. Units in Test Status (Prior to Coamercial Operation) - Forecast Achieved- ;
1 INIT'ALCRiflCAlliY IN111ALELECTRICITY COMMERCIALOPERATION 9102200037 910215 PDR ADOCK 05000369 R PDR *
[L -
=
1
t 0FERAi!N6DATAR(PORT DDCLET NO $0-369 UN!i Mt6ulte 1 -
= DAlt f ebruary 15. 1991 -
COMPLETEDBY P.A. Williset !
TELEPHONi 704-373 5907 _
M0hTH hacary,1991 E AVERA6EIA!LYPOWikLEVEL M AVERABE DAILT 00WEP LEVEL
{NWeNet) (MWe-Net) .
t I 1140 17 1143 2 1140 10 1142 3 1140 19 ,
1143 4 1142 20 1143 i 5 1163 21 -1143 _ _
6 1143 22 1163 7 1163 23 1143 8 1141 24' 1162-9 1143-. 2$ !!44 -
10 11'4 26 1144 11 1143 2? 1144 12 1142 28 1147 f
13 1144 29- 1146 14 1144 - 30 1145 15- 1144- 31 1145 r 16 l'l39 4 ,,--.i ,- , . , - . ,
H' UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 -
UNIT NAME m_t,u i xt, 1 DATE uz/13/ 31 .
~'
REPORT MONTH January 1991 COMPLETED BY s. w. ruudt;K TELEPHONE tiusj-aea-3ide (1) 2) 3 (4) (5)
E HOD
-T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE 4 -O. .
P' DURATION O DOWN REPORT TEM- COMPONENT ACTION TO
. DATE E -HOURS N R/X NO. CODE CODE PREVENT RECURRENCE
'NO SHUTDOWNS OR REDUCTIOF S 4
p .
t 2
l t
[
-i l E(1)F-Forced (2)i -
(3) '(4)
S Scheduled:
Reason:- -
. Method: .
1-Manual' Exhibit G - Instructions for Pre ration of, Data A-EquigmentFailure B-Main enance or tes - Explain) . .2-Manual . Scram Entry S ts For Licensee 1 i
C-Refueling 3-Automatic Scram Event Re rt (LER)
D-Regulator Restriction , 4-Other.(Explain): File ( -0161) 'i
- E-Operator rainin g & License Examination 1- F-Administrative '(5)
~
! G-Operator Error-(Explain). Exhibit I - Same Source l H-Other (Explain)
,4 d
1 a'
k
. _ _ . . . _ _ _ _ _ _ ~ . _ _ . _ _ _ _ __ _
4 DOCKET NO: 50 369 UNIT: McGuire 1 DATE! 2/15/91 NARRATIVE SUMPM Y MONTH: January 1991 McGuire Unit 1 began the month of January operating at 100% full power.
The unit operated at 100% full power for the entire month, and ended the month operating at 100% full power.
i l
.I l
l
.j Prepared by: S. W. Moser Telephone: 704 373 $762
'1
g h T
.. i Y
J MCNDILY klFtELItC INIOR%TICN RE0l5ET t t
- 1. Pacility name: Machire, Unit 1 -
- 2. Scheduled next refueling shutdcunt September 1991
- 3. Scheduled restart folicwing refueling: Novenber 1991 *
- 4. Will refueling or restmpticri of operation thereafter require a technical-specification change or other license L.~.Zi.-it? -
If yes, what will these be? i If no, has reload. design and mre configuration been reviewed by Safety Review Committee regarding unreviewed safety questicris?.
- 5. Scheduled date(s) for. subnitting proposed-licensing action and supporting infora tion:
- 6. Inportant licensing considerations (new or different design or supplier, unreviewed- design or performance analysis metixxis, significant changes in design or new operating procedures).
TfE PIGHUr MANACER liAS IEEN ADVISED BY SEPARATE CG90NICATION CF ANY T.S. CIAtCE CR LICENSE AMENEMENT. QUESTIONS 4 'n!HOLGI 6 WIIL .!
10 IItCER IE MAINTAINED IN TIIIS PMOrt.
- 7. Number of fuel assenblies (a) in the core 193 .
I (b) in the spent fuel pool: 443 .
- 8. Present licensed fuel pool capacity: 1463-Size of requested or planned increase; -- -
- 9. Projected date of last refueling which can be accw.icdated by prosent licensed capacity: March 2006 -
DUKE IOWER 00MPANY DATE: - Fehntary - 15, 1991 -
- Name of Cbntact: J. A. Reavis. Phone _704-373-7567 .._
l
, , .- . - . ~~ _ . - _ . . , ._ . _ ,
t 0FERAllN6DATAREP0ki D0tt(TND $0370 Daft [t}ruary 13. 1991 GPERtifiNGSTATU1 COMPLET[D l'Y _ R. Ad),llint .
iLLtPHONE 70 H 73-5907 - i
- 1. Unit hase: McGuire 2
- 2. teporting Feritd: January 1,1991 January 31,19F 3.Licensediterutfoerr(MWt): 3411
- 6. Naseplate Rating (Brou MVe): 1305a - Notes sN ueplate Ratthg ,
- 5. Design Electrical Rating (Net MWe): 1180 16ross MWel calculated n
- 6. Matteus tependable Capstity (Bross NWelt '1171 1450.000 MVA .90 power
, 7. Mnists $tpendable Capacity (Net MWeh !!29 .
factorperPageIli,
- 9. If Changes Occur in Capacity katings (ltral Nusber 31hrough 71 Binte Last NURE6-0020..
Report. 6sve Reasonii
- 9. Fower Letel le Which Restricted, if Any (Net flWelt,,,,
10.ReasonForRestrictions,ifanyt Thishonth Yr. to Date. Cueulative
!!. Hours In Reporting Feriod 744.0' : 744.0 60672.0
- 12. Wusber Of Hours Reatter Was Crititel 744.0 -744.0 45304.1
- 13. Reactor Re prve Shutdown Hours --0-- --0-- ~
- 14. Hours Generator On-Line 744.0 ~ 744.0 44546.6
!$.UnitRnerveShuldeenHours --0-- - --0--
- 16. Gren Theraal (nergy Benerated IMWH) 2425B25 242b825 145030616 17.GrossElectricalEnergyGenerated(MWH) 854761 B54?B1 50703902 16.NetElectritalEnergyGenerated-(MWH) 623948 623948. 406BB394
- 19. Unit Service Fatter 100.0 100.0 -73.4
- 20. Unit Availability Fatter 100.0 100.0- -73.4.
- 21. Unit Capacity Factor (Using MDC N00 98.1 98.1 - 69.9 22.DnitCapacityFactor(UsingSERNet) 93,8 93.B 68.0
- 23. Urlt Forced Outage Rate 0,0 0.0 0,9
- 26. Shutdown Echeduled Over Next 6 Months (type, late, and Duration of fathl Nnno
- 25. If Shut town At End Of Report Period. Estimated Date of Startupi
- 26. Units in Test Statut (Prior to Ceanertial Operationi: Forecast Achieved .
i IN111AL CRITltAllif-L INlilALELitiRICITY l - COMMERCIALOPERATION I'
y .v-.g#- cw , y- w-9 y y m , -ww a a.g., -e- , ,e --y q-.. y--,- -
v
i 4
OPERAllNBDATAREPOPt f
1
.DDCrEtNO $0370 i llNil - McGuire 2 -
DATL f ebruarv 15. 1991 , ;
COMPLETEDBY R.A. Williaes TELEPHONE __ 704-573-5987 MONTH h neary 19el '
r M $
AVERABEDA!LYPDWERLEVEL MRAGE DAILY f'0WER LEVEL W e hel) (NWe-hell. ,
1 1 543 17 1160 j
2 _
061 19 1154 l 3 929 19 1157 4 1144 20 1159 l
1152 21. 1161 i 6 1152 22 1161 7 1154 23 949 [
B __ 1153 . 24 1001 9 1157 25 1163 [
t 11 1151 27 1161 !
12 1131 2B 1162 l l 13 1159 29 ~ l!62 l 14 1160 30 1161 l
t 15 1161 31 1165: i 16 __ 1130 .
l E
l
-=
i
.. . e. _. .,
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 i UNIT NAME Mu,u lut. 2 DATE uz/13/ 91 -
PAGE 1 OF 2 REPDRT MONTH January 1991 COMPLETED BY s. w. rivs t.H TELEPHONE (/v41-;/J-didz i
(1) 2) (3 (4) (5)
M -
E HOD T A OF LICENSE
- N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT PICURRENCE 1-P 91 1 S -
B -
RC RTELXX HOLD PER REACTOR GROUP 2-P 91 1 S --
B -
RC FUELXX HOLD PER REACTOR GROUP - CORE FLUX MAPPING 3-P 91 1 S --
B --
RC FUELXX HOLD PER REACTOR GROUP 4-P 91 l S --
E -
RC FUELXX HOLD PER REACTOR GROUP 5-P 91 2 S --
B --
RC FUELXX HOLD PER REACTOR GROUP 6-P 91 2 S -
B -
RC FUELXX HOLD PER REACTOR GROUP 7-P 91 2 S -
B --
RC FUELXX HOLD PER REACTOR GROUP 8-P 91 2- S --
B --
RC EUELXX HOLD PER REACTOR GROUP - CORE FLUX MAPPING '
Forced eason- ethod: xhibit G - Instructions S Scheduled A-Equihment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data 2-Manual Scram Entry Sneets For Licensee C-Refueling D-Regulatory Restriction 3-Automatic Scram Event Renort (LER E-Operator Training & License Examination 4-Other (Explain) File (NUI(EG-Ol61))
F-Administrative (5)
G-Operator Err 9r (Explain) Exhibit I - Sane Source H-Other (Explain)
__..-.-.-x...-- ---_---___..----..--.,w--________._.___._--_._a. - - _ . _ _ _ _ . _ _ -.- .. -.,-..,- __._-- . - - - . . - - - _ . . - _ . _ . - - _ . - _ . - _ _
-_..-.w-
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Muw i xt. 2 DATE u z/13/ y 1 -
PAGE 2 OF 2 REPORT MONTH January 1991 COMPLETED BY s. w. Fivst,x TELEPHONE tiun -> o-diuz (1) f2) g_ (4) (5)
E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 9-P 91- 1-23 F --
A --
EA CKTBRK REPAIR OF ONE PHASE OF 'B' BUSLINE MOTOR OPEPATED DISCONNECTS I
(2 (3 (4 (1hForced eason: ethod: xhibit G - Instructions A-Equipment Failure (Explain) 1-Manual- for Preparation of, Data S Scheduled 2-Manual Scram Entry Sheets For Licensee B-Maintenance or test Event Re rt (LER C-Refueling 3-Automatic Scram D-Regulatory Restriction , ,
4-Other (Explain) File ( G-Ol61))
E-Operator Araining Er License Examination F-Administrative (5)
G-Operator Error Exhibit I - Sane Source H-Other (Explain) (Explain)
4 DOCKET NO: 50 370 UNIT: McGuire 2 DATE: 2/15/91 NARRATIVE SUKHARY MONTH: January 1991 McGuire Unit 2 began the month of January at 364 power and increasing load following its end of cycle "6" refueling outage. The unit was held at 40% power from 0116 to 0135 and at 50% power from 0645 to 1100 on 01/01 for reactor group data collection. From this point, the unit was j held after every 2.56 power increase until approximately 80% power per '
the reactor group. The unit wac held at 7't power from 1930 on 01/02 to 1345 on 01/03 for flux mapping. After reachit. 906 power, the unit was held from 1930 to 2258 on 01/03 for reactor group data collection. At 0202 on 01/04, the unit was held at 97.5% power for reactor coolant flow test. A load increase was commenced at 0520 on 01/04, and the unit reached 100% full power at 0610 on 01/04. The unit operated at or i near 100% full power until 1130 on 01/23, when a load reduction was '
commenced to repair the "2BY" motor operated disconnect. The unit was held at $5% power from 1606 on 01/23 to 0352 on 01/24. During the subsequent power increase, the unit was held at 80s power from 0659 to 0736 on 01/24 and at 904 power from 0830 to 0925 on 01/24 for nuclear instrumentation calibration. The unit was next held at 95% power from 1105 to 1725 on 01/24 for reactor protection system testing. The unit reached 100% full power at 2010 on 01/24, and operated at 100% full power for the remainder of the month.
1 prepared by: S. W. Moser Telephone: 704 373 5762 l
e Marnrix RIrtvitm ItarsNATIrs imotnsT
- 1. Pacility name McGuire,11 nit 2
- 2. Scheduled nest refueling rhutdown: January 1991
- 3. Sclxxtuled restart follwing refueling: March 1992
- 4. Will refueling or resumption of operation thereafter require a technice.1 gocification change or otter license amendment */
If yes, what will these be,' __
If no, has reload design and oore configuration been revicwed by Safety review Ccmmittee regarding unrwiewed safety questions:
- 5. Scheduled date(s) for adinittire proposed licensing action and supporting information:
- 6. Inportant licensing considerations (new or different design or supplier, unreviewcx1 design or performance analysis methods, significant changes in design or new operating procedures) .
TIE Pin 7DCT MANAGE IIAS IErd AINISED BY SEPATATE OmMLNICATICN OF ANY T.S. CIAIGE OR LICENSE AWMMlWI'. 71IERrJORE, OLIESTICES 4 TIIIOUGI 6 WIIL 10 IINGER IE MAINTAINED IN '11[IS R12 ORT.
=
l l 7. Number of fuel assenblies (a) in the corus 193 in the spent E l pool (b) 589 l 8. Present licensed fuel pool capacity: 1463 l
Size of requested or planned increases ~-
! 9. Projected date of last refueling which can be accu 4ated by present licensed capacity: Deccmber 2003 I
I: UKE POER CDMPANY DATE: February 15, 1991 Name of
Contact:
J. A. Reavis Phone 704-373-7567