MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20237B2401998-06-30030 June 1998 Revised Monthly Operating Rept for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8201998-06-30030 June 1998 Monthly Operating Repts for June 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236F0381998-05-31031 May 1998 Monthly Operating Repts for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236Q8251998-05-31031 May 1998 Revised MOR for May 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247K3851998-04-30030 April 1998 Narrative Summary Pages to Apr 1998 MOR for McGuire Nuclear Station ML20247L5981998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0681998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20247L6181998-03-31031 March 1998 Revised Monthly Operating Rept for Mar 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E3991998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for McGuire Nuclear Station,Units 1 & 2 ML20217B0811998-02-28028 February 1998 Revised Monthly Operating Repts for Feb 1997 for McGuire Nuclear Station,Units 1 & 2 ML20202G7531998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216E4111998-01-31031 January 1998 Rev 1 to Monthly Operating Repts for Jan 1998 for McGuire Nuclear Station,Units 1 & 2 ML20202G7741997-12-31031 December 1997 Revised Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station,Units 1 & 2 ML20198P2521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for McGuire Nuclear Station ML20203H6491997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for McGuire Nuclear Station,Units 1 & 2 ML20199D3221997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station ML20203H6601997-10-31031 October 1997 Revised Monthly Operating Repts for Oct 1997 for McGuire Nuclear Station,Units 1 & 2 ML20211P9841997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for McGuire Nuclear Station ML20216K1301997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for McGuire Nuclear Station,Units 1 & 2 ML20216K1561997-07-31031 July 1997 Revised Monthly Operating Status Rept for Jul 1997 for McGuire Nuclear Station,Units 1 & 2 ML20210L0691997-07-31031 July 1997 Monthly Operating Repts for July 1997 for MNS ML20149F2421997-06-30030 June 1997 Monthly Operating Repts for June 1997 for McGuire Nuclear Station,Units 1 & 2 ML20140H1171997-05-31031 May 1997 Monthly Operating Repts for May 1997 for McGuire Nuclear Station,Units 1 & 2 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217G7951999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for McGuire Nuclear Station,Units 1 & 2 ML20217F3661999-09-22022 September 1999 Rev 18 to McGuire Unit 1 Cycle 14 Colr ML20212D1911999-09-20020 September 1999 SER Accepting Exemption from Certain Requirements of 10CFR50,App A,General Design Criterion 57 Closed System Isolation Valves for McGuire Nuclear Station,Units 1 & 2 ML20216E8851999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Units 1 & 2 ML20211B1281999-08-31031 August 1999 Dynamic Rod Worth Measurement Using Casmo/Simulate ML20217G8101999-08-31031 August 1999 Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2 ML20211G5261999-08-24024 August 1999 SER Accepting Approval of Second 10-year Interval Inservice Insp Program Plan Request for Relief 98-004 for Plant,Unit 1 ML20211F3441999-08-17017 August 1999 Updated non-proprietary Page 2-4 of TR DPC-NE-2009 ML20210S2371999-07-31031 July 1999 Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20216E8951999-07-31031 July 1999 Revised Monthly Operating Repts for July 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209E4361999-07-0909 July 1999 SER Agreeing with Licensee General Interpretation of TS LCO 3.0.6,but Finds No Technical Basis or Guidance That Snubbers Could Be Treated as Exception to General Interpretation ML20196K6631999-07-0707 July 1999 Safety Evaluation Supporting Licensee 990520 Position Re Inoperable Snubbers ML20209H1631999-06-30030 June 1999 Monthly Operating Repts for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20210S2491999-06-30030 June 1999 Revised Monthly Operating Rept for June 1999 for McGuire Nuclear Station,Units 1 & 2 ML20209H1731999-05-31031 May 1999 Revised Monthly Operating Rept for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206T4771999-05-31031 May 1999 Rev 3 to UFSAR Chapter 15 Sys Transient Analysis Methodology ML20196L1881999-05-31031 May 1999 Non-proprietary Rev 1 to DPC-NE-3004, Mass & Energy Release & Containment Response Methodology ML20195K3691999-05-31031 May 1999 Monthly Operating Repts for May 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206N3511999-05-11011 May 1999 Safety Evaluation Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety- Related Movs ML20195K3761999-04-30030 April 1999 Revised MORs for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20206R0891999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205L2341999-04-0505 April 1999 SFP Criticality Analysis ML20206R0931999-03-31031 March 1999 Revised Monthly Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P8991999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205C4171999-03-25025 March 1999 Special Rept 99-02:on 801027,Commission Approved for publication,10CFR50.48 & 10CFR50 App R Delineating Certain Fire Protection Provisions for Nuclear Power Plants Licensed to Operate Prior to 790101.Team Draft Findings Reviewed ML20207K2051999-03-0505 March 1999 Special Rept 99-01:on 990128,DG Tripped After 2 H of Operation During Loaded Operation for Monthly Test.Caused by Several Components That Were Degraded or Had Intermittent Problems.Parts Were Replaced & Initial Run Was Performed ML20204C8911999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20205P9021999-02-28028 February 1999 Revised Monthly Operating Repts for Feb 1999 for McGuire Nuclear Station,Units 1 & 2 ML20204C8961999-01-31031 January 1999 Revised Monthly Operating Repts for Jan 1999 for McGuire Nuclear Station,Units 1 & 2 ML20199E0301998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for McGuire Nuclear Station,Units 1 & 2 ML20216F9931998-12-31031 December 1998 Piedmont Municipal Power Agency 1998 Annual Rept ML20198A4481998-12-11011 December 1998 Safety Evaluation Concluding That for Relief Request 97-004, Parts 1 & 2,ASME Code Exam Requirements Are Impractical. Request for Relief & Alternative Imposed,Granted ML20198D7561998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 ML20199E0491998-11-30030 November 1998 Revised Monthly Operating Rept for Nov 1998 for McGuire Nuclear Station,Units 1 & 2 Re Personnel Exposure ML20199E9651998-11-24024 November 1998 Rev 1 to ATI-98-012-T005, DPC Evaluation of McGuire Unit 1 Surveillance Weld Data Credibility ML20196D4171998-11-24024 November 1998 Special Rept 98-02:on 981112,failure to Implement Fire Watches in Rooms Containing Inoperable Fire Barrier Penetrations,Was Determined.Repair of Affected Fire Barriers in Progress ML20196G0581998-11-0606 November 1998 Rev 17 to COLR Cycle 13 for McGuire Unit 1 ML20196G0761998-11-0606 November 1998 Rev 15 to COLR Cycle 12 for McGuire Unit 2 ML20198D7771998-10-31031 October 1998 Revised Monthly Operating Rept for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E5961998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154L6251998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20195E6021998-09-30030 September 1998 Revised Monthly Operating Rept for Sept 1998 for McGuire Nuclear Station,Units 1 & 2 ML20154B4131998-09-22022 September 1998 Rev 0 to ISI Rept for McGuire Nuclear Unit 1 Twelfth Refueling Outage ML20151W3521998-09-0808 September 1998 Special Rept 98-01:on 980819,maint Could Not Be Performed on FPS Due to Isolation Boundary Leakage.Caused by Inadequate Info Provided in Fire Impairment Plan.Isolated Portion of FPS Was Returned to Svc ML20154L6321998-08-31031 August 1998 Rev 1 to MOR for Aug 1998 for McGuire Nuclear Station,Unit 1 ML20153B3741998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236U1601998-07-31031 July 1998 Non-proprietary DPC-NE-2009, DPC W Fuel Transition Rept ML20237B2381998-07-31031 July 1998 Monthly Operating Repts for July 1998 for McGuire Nuclear Station,Units 1 & 2 ML20153B3931998-07-31031 July 1998 Revised Monthly Operating Repts for Jul 1998 for McGuire Nuclear Station,Units 1 & 2 ML20236P0451998-07-0808 July 1998 Part 21 Rept Re non-conformance & Potential Defect in Component of Nordberg Model FS1316HSC Standby Dg.Caused by Outer Spring Valves Mfg from Matl That Did Not Meet Specifications.Will Furnish Written Rept within 60 Days 1999-09-30
[Table view] |
Text
_. .. _
t i .
OPERATING DATA REPORT l
DOCKET N0 1 E A9.
DATE houary 15. ?991 !
OPERAilWB STATUS COMPLETED BY R.A. Willians--
TELEPHONE 704-373-5987
- 1. Unit Naael McGuire 1
- 2. Reporting Period December l 1990-Decesber i 31, 1990
- 3. Licensed Thereal Power (MWt): 3411 C. Naseplate Rating (6 toss MWe): -13054 Notes INaseplateRating
- 5. Design Electrical Rating (Net MWe): 1180_ (Bross MWel calculated as
- 6. Marious Dependable Capacity (Bross MWe): !!?! 1450.000 MVA .90 power
- 7. Mu inus Dependable Capacity (Net MWeli 1129 _factorperPagelii, B. If Changes Occur in Capacity Ratings (lleas Nusber 3 Through 7) Since Last- NUREG 0020. ,
Report. Give Reasons
- 9. Power Level To Which Restricted, if Any .(Net MWe):
- 10. Reason for Restrictions, If anyt i
t This Month Yr.-to-Date Cuaulative
- 11. Hours-In Reporting Feriod 744,0 8760.0 79632.0
- 12. Number Of Hours Reactor Was Critical 744.0 4807.8 55665.9'
--0--
13 Reactor Reserve Shutdown Hours --
0-- --0--
- 14. Hours Benerator On-Line 744.0 4721 2 55020.0
- 15. Unit Reserve Shutdown Hours --0-- --0-- --0-- '
- 16. Bross Thereal Energy Generated (MWH) 2518560 id34829 166235542
- 17. Gross Electrical Energy Generated (MWH) 082442 4994759- 57222435 >
- 18. Net Electrical Energy Generated (MWHl. 848269 4733621 54620004
- 19. Unit Service factor 100.0 53.9 69.1 20.UnitAvailabilityfactor 100.0 53.9 -69.1
- 21. Unit Capacity Factor (Using MDC Net) 101.0 47.9 59.3
- 22. Unit Capacity Fatter (Using DER Net) 96.6 45.0 50.1 23.UnitForcedOuta')eRate 0.0 19.0 12,9
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Dcwn At End Of Report Period. Estiaated Date of Startup:
- 26. Units in Test Status (Prior to Consercial Operation): Forecast Achieved-INITIAL CRITICAL!!Y INITIAL ELECTRICITY COMERCIAL OPERAi!0N 9101220112 910115 POR ADOCK 05000369 PDR y
p
- 1. . . _ - - .
~ --
I. l
~
4 .. l
' 1 r
OPERAllNS DATA REPORT 1
l l
DOCKET ND 50-369 .
UNIT Nc6uite 1 l DATEDnuary 15, 1990 -
COMPLETED BY R.A. Willians TELEPHONE 704-373-5987-ADNTH _ ,feceeber, 1990 QM AVERABE DAILY POWER LEVEL LA1 AVERABE DAILY POWER LEVEL (MWe Net) (MWe Net)-
1 1135 17- 1142 2 1140 18 1143 3 1140 19 1143 _
4 1140 20 1139 5 1t41 21 1139 6 1139 22' 1139 7 1134 23 1137 8 1142 - 24 1137 l 9 .l.142 25 1130 10 1143 ' 26 1137 l
11 1143 27 1136' ~
l .
12 _ !!43 28 -1138-13 ~1144 29 1139 _
14 1143 30 1140' . .
Ib list - 31 1141 d l
.I o
l l
. , -. ,, , .. . - - . . ~ - - . . , -, ...u,..,-....,.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-36_9 .
UNIT NAME MLUU1Rb 1
.. DATE v1/Ad/91 REPORT MONTH December 1990 -COMPLETED BY s. w. Musta TELEPHONE i/v4)-J/J-D/b2
! (1.)
{2) _
(4) l (5)
E HOD -
T A OF LICENSE -
.N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O . P. DURATION O. DOWN REPORT TEM- COMPONENT ACTION TO- ' , ;. !
. -DATE E HOURS N- R/X NO. CODE CODE ..
PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S .l L
'i (1). . (2). . . .
(3 ...-=
F-Forced (4{xhibit G -- ' Instructions" R e a s '.r!' - .
... ethod: !
'S-Scheduled- -A-EquipmentiFailure1(Explain) 1-Manual. . . . .
for Preparation of Data
-B-Maintenance or test '2-Manual-Scram Entry Sheets'For Licensee.
C-Refueling l 3-Automatic Scram. Event Report-- (LER'* :
- D-Regulatory Restriction- .. ,
'4-Other-(Explain) File-(NUREG-0161)
EM)perator . Training. G. License Examination -
F-Administrative- (5 G-Operator-Er or (Explain) xhibit I -LSame Source H-Other.(Explain).
q
.l 2i L -
I-'b,4 - . -..,.~.23-e_..- s.-
-~ . : h . %
+%#-"3.~.- - . - - - . , . - - - -- . . ~ . , w .- *.....~-_' -i.~!.___.... -
s - y. z._.e .L
_ .h . _. . . .- _ . . .
1
'. i DOOKET NO: 50 369 L
UNIT: McGuire 1 DATE: 1/15/91 NARRATIVE
SUMMARY
MONTH: December 1990 McGuire Unit 1 began the month of December operating at 100% full power.
The unit: operated at 100% full power for the entire month, and ended >
the month operating at 100% full power. ?
.;JTE : Thi strative summary for McGuire Unit 1 for the month of November, 1990 contained an incorrect on line date and time corresponding to a trip that occurred on 11/17. The unit was placed back on line at 2027.on 11/17.
j l
' Prepared by: S. W. Moser l
Telephone: 704-373 5762 i
s . _ -~.
1 M3NTHLY REFUELING INFORMATION REQUEST I
l
- 1. Facility name: McGuire, Unit 1
- 2. Scheduled next refueling shutdown: August 1991 )
- 3. Scheduled restart following refueling: November 1991
- 4. Will refueling or resumption of-operation thereafter require a technical-specification change or other license amendment?
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?
- 5. Scheduled date(s) for submitting proposed licensing' action and_suppr-tin,,
information:
- 6. Important licensing consideration 6 (now or different. design or supplier, unreviewed design or performance analysis methods, signiff. cant changes in design or new operating procedures).
Ti!E PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGts OR LICENSE AMENDMENT. QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
- 7. Number of fuel assemblies (a) in the core: 193 (b) in-the spent fuel pool 443
- 8. Present licensed fuel pool capacity:- 1463 Size of requested or planned increase ---
- 9. . Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 1
i DUKE POWER COMPANY DATE: January 15, 1991 1 Name of
Contact:
J. A. Reavis Phone: 704-373-7567
( 1 4
-<- ,. u a < v , e - r , e,+ ~4, 4
- . . . . - - - ,- - ~. . - - . -. . . .
. e OPERATIN3 OATA REPORT.
DOCKET NO - 50-370 DATE lancary 15. 1991 OPEPAtlNS STATUS : COMPLETED BY R.A. Willlaes TELEPHONE 704-373 5987
- 1. Unit Names McGuire 2
- 2. Reporting Periodi Deceabtr 1, 1990-December 31,1990
- 3. Licensed Thersal fomer (MWt): 3411
- 4. Naseplate R. ting (Bross MWe h .13055 Notes 'Nastplate Rating
- 5. Design Electrical Rating (Net MWe): 1 00 (Gross MWel calculated as
- 6. Maxleus Dependable Capacity (Gross MW ): !!71- 1450.000 MA .90 power
- 7. Maxieus Dependable Capacity (Net MWe): 1129.. .
factor per Page ill,
- 8. If Changes Occur in Capacity Ratings (lteas Nueber 3 Through 7) Since last NURE6-0020.
Report. Give Reasons __
- 9. Power Level to Which Restricted, if Any (Net MWe)l
- 10. Reason For Restrictions, if any:
o This Month Yr.-to-Date Casulative
- 11. Hours in Reporting Period 744,0 8760.0 59928.0
- 12. Nueber Of tWs Reactor Was Critical 117.3 5937.3 44640.1'
- 13. Reactor Reserie Shutdown Hours - - --0-- --0--
- 14. Hours Genera'ar Dn-Line 59.5 5874.7 43802.5
- 15. Unit Reser* , Shutdown Hours 3-0--
--0-- --0--
- 16. L m iiieraal Energy Benerated (MWH) 55107- 19343521 142604791
- 17. C.ws Electrical Energy Generated (MWH) 14546 6746540 49929201 18.h2tElectricalEnergyBenerated(MWH) -1874 6461549 47664446
- 19. Unit Service Factor 8.0 67.1 .73.1 <
l 20. Unit Availability Factor - 8.0 67.1 '73.1
, 21. Unit Capacity Factor (Using MDC Net! 0.0 65.3 6'7.5 .
l 22. Unit Capacity factor (Using DER Net) 0.0 62.5 67.7 l 23. Valt Forced Outage Rate '47.0 1.3 9.i -1
- 24. Shetdna kheduled Over Next 6 nonths (Type, Date, and Duration of Each) - I ynnn
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Status (Prier to Cocaercial Operation): Forecast Achieved L
INiilAL CRITICALITY INiilAL ELECTRICIT*
COMMERCIAL OPERATION
~L
+
N j
- - . , . . ~ , . . -. _ .. . . ....
. . . . ~ . . . . - . .
It 4
, -OPERATINB DATA REPORI.
SOCKETNO- 50 370 UNil McGutte 2
~ DATE hwary 15J 1990
~
COMPLETED BY -' R. A. Willises -
TELEPHONE 704-373 5907 PONTH Deceeber,1990 ._
QQ AVERABEDAILYF0WERLEVEL RE AVERABE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 IB 0 3 -0 19 0
+ .
0 ._ 20 0 ._:
5 0 21 0 6 0 22 , , , 0 7- 0 23' 0:
8 0 24 0 l 9 20 25 0- !
10 0 26 0 11 _,_
0 27 0 12 _
-0 - 20 0 _
13 0 29 12 14 0 30 223 15 0 31 262 16 0 e
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mwulut; z DATE v1/13/91 REPORT MONTH December 1990 COMPLETED B'l s. w. muser TELEPHONE (/U4)-J/J-D/b2 (1)
R (2)l(3) MET-(4) (5)
E '
HOD T A LICENSE OF N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO
. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE
) 3 90 1 S 631.70 B --
HA TURBIN SCHEDULED OUTAGE EXTENSION DUE TO LOW PRESSURE TURBINE WORK 4 90-12-27 F 52.80 A 2 RB CONROD SHUTDOWN BANK 'E' DROPPED INTO CORE -
- REACTOR MANUALLY TRIPPED 27-P 90-12-29 S --
B --
. IA INSTRU HOLDING POWER TO SET NUCLEAR INSTRUMENTATION REACTOR TkIP SETPOINT 28-P 90-12-30 S --
B --
IE INSTRU NUCLEAR INSTRUMENTATION PERFORMANCE TESTING 29-P 90-12-30 S --
B --
HG HTEXCH HOLDING POWER FOR SECONDARY SIDE BORON SOAK (1) (2) (3) (4)
F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equioment Failure
.B-Maintenance or test (Explain) 1-Manual for Preparation of Daca 2-Manual Scram Ent W Sheets For Licensee C-Refueling D-Regulatory Rystriction 3-Automatic Scram 4-Other (Explain)
Event Report (LER E-Operator Trztining & License Examination
, File ' (NUREG-0161) )
F-Administrative (5)
G-Operator Error Exhibit I - Same source H-Other ._ (Explain) (Explain)
DOCKET NO: 50 370 UNIT: -McGuire 2 DATE: 1/15/91 NARRATIVE SUMuRY MONTH: December 1990 McGuire Unit 2 began the month of December shut.down for its end-of-cycle "6" refueling outage. The unit was placed on line at 1230 on-12/29 to end this outage. ~The outage was extended approximately 37 days Approximately 35 days of this over its originally scheduled. duration.
extension were due to the low pressure turbine replacement. 'An additional delay in startup was due to control rod shutdown' group "E"
dropping into the core during~cero power physics testing. The; reactor was manually tripped at this event. After placing the unit.on line and beginning a load increase, the unit was held at' approximately 10% power from 1345 to 2240 on 12/29 to set nuclear instrumentation reactor trip setpoint. The next hold was at approximately 15% power from 0222 to-0800 on 12/30 for nuclear insrumentation performance testing. The unit ;
l- was then held.at approximately 30% power from 1036 on 12/30 to 2133 on 12/31 for secondary side boron soak and nuclear instrumentation calibration. The unit was in a power increase from 30%. power-as the month ended.
{
Prepared by: S. W. Moser Telephone: 704-373-5762-i
l l
l l
-1 l
MONTilLY REFUELING INFORMATION REQUEST
- 1. Facility name: McGuire, Unit 2
- 2. Scheduled next refueling shutdown: December 1991
- 3. Scheduled restart following refueling: March 1992 ,
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?'
If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?
- 5. Scheduled date(s. "or submitting proposed licensing, action and supporting information:
- 6. Important licensing considerations (now or different design or supplier, ,
unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TIIEREFORE, QUESTIONS 4 TIIROUGil 6 WILL NO LONGER BE MAINTAINED IN TIIIS REPORT.
- 7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuci pool 589
- 8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase ---
- 9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 I
DUKE POWER COMPANY DATE: January 15, 1991 Name of
Contact:
J. A. Reavis Phone: 704-373-7567~
1 l
i I
w