Monthly Operating Repts for Dec 1990 for McGuire Nuclear Station Units 1 & 2
ML20066E606
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/31/1990
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20066E586 List:
References
NUDOCS 9101220112
Download: ML20066E606 (10)


Text

_. .. _

t i .

OPERATING DATA REPORT l

DOCKET N0 1 E A9.

DATE houary 15. ?991  !

OPERAilWB STATUS COMPLETED BY R.A. Willians--

TELEPHONE 704-373-5987

1. Unit Naael McGuire 1
2. Reporting Period December l 1990-Decesber i 31, 1990
3. Licensed Thereal Power (MWt): 3411 C. Naseplate Rating (6 toss MWe): -13054 Notes INaseplateRating
5. Design Electrical Rating (Net MWe): 1180_ (Bross MWel calculated as
6. Marious Dependable Capacity (Bross MWe):  !!?! 1450.000 MVA .90 power
7. Mu inus Dependable Capacity (Net MWeli 1129 _factorperPagelii, B. If Changes Occur in Capacity Ratings (lleas Nusber 3 Through 7) Since Last- NUREG 0020. ,

Report. Give Reasons

9. Power Level To Which Restricted, if Any .(Net MWe):
10. Reason for Restrictions, If anyt i

t This Month Yr.-to-Date Cuaulative

11. Hours-In Reporting Feriod 744,0 8760.0 79632.0
12. Number Of Hours Reactor Was Critical 744.0 4807.8 55665.9'

--0--

13 Reactor Reserve Shutdown Hours --

0-- --0--

14. Hours Benerator On-Line 744.0 4721 2 55020.0
15. Unit Reserve Shutdown Hours --0-- --0-- --0-- '
16. Bross Thereal Energy Generated (MWH) 2518560 id34829 166235542
17. Gross Electrical Energy Generated (MWH) 082442 4994759- 57222435 >
18. Net Electrical Energy Generated (MWHl. 848269 4733621 54620004
19. Unit Service factor 100.0 53.9 69.1 20.UnitAvailabilityfactor 100.0 53.9 -69.1
21. Unit Capacity Factor (Using MDC Net) 101.0 47.9 59.3
22. Unit Capacity Fatter (Using DER Net) 96.6 45.0 50.1 23.UnitForcedOuta')eRate 0.0 19.0 12,9
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None

25. If Shut Dcwn At End Of Report Period. Estiaated Date of Startup:
26. Units in Test Status (Prior to Consercial Operation): Forecast Achieved-INITIAL CRITICAL!!Y INITIAL ELECTRICITY COMERCIAL OPERAi!0N 9101220112 910115 POR ADOCK 05000369 PDR y

p

1. . . _ - - .

~ --

I. l

~

4 .. l

' 1 r

OPERAllNS DATA REPORT 1

l l

DOCKET ND 50-369 .

UNIT Nc6uite 1 l DATEDnuary 15, 1990 -

COMPLETED BY R.A. Willians TELEPHONE 704-373-5987-ADNTH _ ,feceeber, 1990 QM AVERABE DAILY POWER LEVEL LA1 AVERABE DAILY POWER LEVEL (MWe Net) (MWe Net)-

1 1135 17- 1142 2 1140 18 1143 3 1140 19 1143 _

4 1140 20 1139 5 1t41 21 1139 6 1139 22' 1139 7 1134 23 1137 8 1142 - 24 1137 l 9 .l.142 25 1130 10 1143 ' 26 1137 l

11 1143 27 1136' ~

l .

12 _  !!43 28 -1138-13 ~1144 29 1139 _

14 1143 30 1140' . .

Ib list - 31 1141 d l

.I o

l l

. , -. ,, , .. . - - . . ~ - - . . , -, ...u,..,-....,.

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-36_9 .

UNIT NAME MLUU1Rb 1

.. DATE v1/Ad/91 REPORT MONTH December 1990 -COMPLETED BY s. w. Musta TELEPHONE i/v4)-J/J-D/b2

! (1.)

{2) _

(4) l (5)

E HOD -

T A OF LICENSE -

.N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O . P. DURATION O. DOWN REPORT TEM- COMPONENT ACTION TO- ' , ;. !

. -DATE E HOURS N- R/X NO. CODE CODE ..

PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S .l L

'i (1). . (2). . . .

(3 ...-=

F-Forced (4{xhibit G -- ' Instructions" R e a s '.r!' - .

... ethod:  !

'S-Scheduled- -A-EquipmentiFailure1(Explain) 1-Manual. . . . .

for Preparation of Data

-B-Maintenance or test '2-Manual-Scram Entry Sheets'For Licensee.

C-Refueling l 3-Automatic Scram. Event Report-- (LER'* :

D-Regulatory Restriction- .. ,

'4-Other-(Explain) File-(NUREG-0161)

EM)perator . Training. G. License Examination -

F-Administrative- (5 G-Operator-Er or (Explain) xhibit I -LSame Source H-Other.(Explain).

q

.l 2i L -

I-'b,4 - . -..,.~.23-e_..- s.-

-~ . : h .  %

+%#-"3.~.- - . - - - . , . - - - -- . . ~ . , w .- *.....~-_' -i.~!.___.... -

s - y. z._.e .L

_ .h . _. . . .- _ . . .

1

'. i DOOKET NO: 50 369 L

UNIT: McGuire 1 DATE: 1/15/91 NARRATIVE

SUMMARY

MONTH: December 1990 McGuire Unit 1 began the month of December operating at 100% full power.

The unit: operated at 100% full power for the entire month, and ended >

the month operating at 100% full power.  ?

.;JTE : Thi strative summary for McGuire Unit 1 for the month of November, 1990 contained an incorrect on line date and time corresponding to a trip that occurred on 11/17. The unit was placed back on line at 2027.on 11/17.

j l

' Prepared by: S. W. Moser l

Telephone: 704-373 5762 i

s . _ -~.

1 M3NTHLY REFUELING INFORMATION REQUEST I

l

1. Facility name: McGuire, Unit 1
2. Scheduled next refueling shutdown: August 1991 )
3. Scheduled restart following refueling: November 1991
4. Will refueling or resumption of-operation thereafter require a technical-specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing' action and_suppr-tin,,

information:

6. Important licensing consideration 6 (now or different. design or supplier, unreviewed design or performance analysis methods, signiff. cant changes in design or new operating procedures).

Ti!E PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGts OR LICENSE AMENDMENT. QUESTIONS 4 TilROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.

7. Number of fuel assemblies (a) in the core: 193 (b) in-the spent fuel pool 443
8. Present licensed fuel pool capacity:- 1463 Size of requested or planned increase ---
9. . Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 1

i DUKE POWER COMPANY DATE: January 15, 1991 1 Name of

Contact:

J. A. Reavis Phone: 704-373-7567

( 1 4

-<- ,. u a < v , e - r , e,+ ~4, 4

- . . . . - - - ,- - ~. . - - . -. . . .

. e OPERATIN3 OATA REPORT.

DOCKET NO - 50-370 DATE lancary 15. 1991 OPEPAtlNS STATUS  : COMPLETED BY R.A. Willlaes TELEPHONE 704-373 5987

1. Unit Names McGuire 2
2. Reporting Periodi Deceabtr 1, 1990-December 31,1990
3. Licensed Thersal fomer (MWt): 3411
4. Naseplate R. ting (Bross MWe h .13055 Notes 'Nastplate Rating
5. Design Electrical Rating (Net MWe): 1 00 (Gross MWel calculated as
6. Maxleus Dependable Capacity (Gross MW ):  !!71- 1450.000 MA .90 power
7. Maxieus Dependable Capacity (Net MWe): 1129.. .

factor per Page ill,

8. If Changes Occur in Capacity Ratings (lteas Nueber 3 Through 7) Since last NURE6-0020.

Report. Give Reasons __

9. Power Level to Which Restricted, if Any (Net MWe)l
10. Reason For Restrictions, if any:

o This Month Yr.-to-Date Casulative

11. Hours in Reporting Period 744,0 8760.0 59928.0
12. Nueber Of tWs Reactor Was Critical 117.3 5937.3 44640.1'
13. Reactor Reserie Shutdown Hours - - --0-- --0--
14. Hours Genera'ar Dn-Line 59.5 5874.7 43802.5
15. Unit Reser* , Shutdown Hours 3-0--

--0-- --0--

16. L m iiieraal Energy Benerated (MWH) 55107- 19343521 142604791
17. C.ws Electrical Energy Generated (MWH) 14546 6746540 49929201 18.h2tElectricalEnergyBenerated(MWH) -1874 6461549 47664446

- 19. Unit Service Factor 8.0 67.1 .73.1 <

l 20. Unit Availability Factor - 8.0 67.1 '73.1

, 21. Unit Capacity Factor (Using MDC Net! 0.0 65.3 6'7.5 .

l 22. Unit Capacity factor (Using DER Net) 0.0 62.5 67.7 l 23. Valt Forced Outage Rate '47.0 1.3 9.i -1

24. Shetdna kheduled Over Next 6 nonths (Type, Date, and Duration of Each) - I ynnn
25. If Shut Down At End Of Report Period. Estinated Date of Startup:
26. Units In Test Status (Prier to Cocaercial Operation): Forecast Achieved L

INiilAL CRITICALITY INiilAL ELECTRICIT*

COMMERCIAL OPERATION

~L

+

N j

- - . , . . ~ , . . -. _ .. . . ....

. . . . ~ . . . . - . .

It 4

, -OPERATINB DATA REPORI.

SOCKETNO- 50 370 UNil McGutte 2

~ DATE hwary 15J 1990

~

COMPLETED BY -' R. A. Willises -

TELEPHONE 704-373 5907 PONTH Deceeber,1990 ._

QQ AVERABEDAILYF0WERLEVEL RE AVERABE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 0 2 0 IB 0 3 -0 19 0

+ .

0 ._ 20 0 ._:

5 0 21 0 6 0 22 , , , 0 7- 0 23' 0:

8 0 24 0 l 9 20 25 0-  !

10 0 26 0 11 _,_

0 27 0 12 _

-0 - 20 0 _

13 0 29 12 14 0 30 223 15 0 31 262 16 0 e

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mwulut; z DATE v1/13/91 REPORT MONTH December 1990 COMPLETED B'l s. w. muser TELEPHONE (/U4)-J/J-D/b2 (1)

R (2)l(3) MET-(4) (5)

E '

HOD T A LICENSE OF N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE

) 3 90 1 S 631.70 B --

HA TURBIN SCHEDULED OUTAGE EXTENSION DUE TO LOW PRESSURE TURBINE WORK 4 90-12-27 F 52.80 A 2 RB CONROD SHUTDOWN BANK 'E' DROPPED INTO CORE -

- REACTOR MANUALLY TRIPPED 27-P 90-12-29 S --

B --

. IA INSTRU HOLDING POWER TO SET NUCLEAR INSTRUMENTATION REACTOR TkIP SETPOINT 28-P 90-12-30 S --

B --

IE INSTRU NUCLEAR INSTRUMENTATION PERFORMANCE TESTING 29-P 90-12-30 S --

B --

HG HTEXCH HOLDING POWER FOR SECONDARY SIDE BORON SOAK (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equioment Failure

.B-Maintenance or test (Explain) 1-Manual for Preparation of Daca 2-Manual Scram Ent W Sheets For Licensee C-Refueling D-Regulatory Rystriction 3-Automatic Scram 4-Other (Explain)

Event Report (LER E-Operator Trztining & License Examination

, File ' (NUREG-0161) )

F-Administrative (5)

G-Operator Error Exhibit I - Same source H-Other ._ (Explain) (Explain)

DOCKET NO: 50 370 UNIT: -McGuire 2 DATE: 1/15/91 NARRATIVE SUMuRY MONTH: December 1990 McGuire Unit 2 began the month of December shut.down for its end-of-cycle "6" refueling outage. The unit was placed on line at 1230 on-12/29 to end this outage. ~The outage was extended approximately 37 days Approximately 35 days of this over its originally scheduled. duration.

extension were due to the low pressure turbine replacement. 'An additional delay in startup was due to control rod shutdown' group "E"

dropping into the core during~cero power physics testing. The; reactor was manually tripped at this event. After placing the unit.on line and beginning a load increase, the unit was held at' approximately 10% power from 1345 to 2240 on 12/29 to set nuclear instrumentation reactor trip setpoint. The next hold was at approximately 15% power from 0222 to-0800 on 12/30 for nuclear insrumentation performance testing. The unit  ;

l- was then held.at approximately 30% power from 1036 on 12/30 to 2133 on 12/31 for secondary side boron soak and nuclear instrumentation calibration. The unit was in a power increase from 30%. power-as the month ended.

{

Prepared by: S. W. Moser Telephone: 704-373-5762-i

l l

l l

-1 l

MONTilLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire, Unit 2
2. Scheduled next refueling shutdown: December 1991
3. Scheduled restart following refueling: March 1992 ,
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?'

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions?

5. Scheduled date(s. "or submitting proposed licensing, action and supporting information:
6. Important licensing considerations (now or different design or supplier, ,

unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TIIEREFORE, QUESTIONS 4 TIIROUGil 6 WILL NO LONGER BE MAINTAINED IN TIIIS REPORT.

7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuci pool 589
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 I

DUKE POWER COMPANY DATE: January 15, 1991 Name of

Contact:

J. A. Reavis Phone: 704-373-7567~

1 l

i I

w