VIRGINIA ELECTRIC AND POWER COMPANY

, NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MONTH DECEMBER YEAR 1981 f

\

l APPROVED:

/

/

STATIONMANA/ER

\

R RkhahK03 020114 0500033g PDR

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 01-05-82 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2510 l

OPERATING STATUS Notes -

1. Unit Name: North Anna 1
2. Reporting Period: December 1981
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross HWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 918
7. Maximum Dependable Capacity (Net MWe): 865
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:

NA

9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A t'

This Month Yr.-to-Date Cumulative 744 8,760 31,321

11. Hours In Reporting Period 23,828.3 744 5,855.2
12. Number of Hours Reactor Was Critical 234.9
13. Reactor Reserve Shutdown Hours 0 21.8 744 5,704.9 23,353
14. Hours Generator On-Line 0 0 0
15. Unit Reserve Shutdown Hours 60,314,252
16. Gross Thermal Energy Generated (MWH) 2,048,091 15,145,549 Gross Electrical Energy Generated (MWH) 664,807 4,910,610 19,245,522
17. 18,122,916 Net Electrical Energy Generated (MWH) 630,518 4,637,913 18.

100 65.1 74.6

19. Unit Service Factor 74.6
20. Unit Availability Factor 100 65.1 98.0 61.2 66.9
21. Unit Capacity Factor (Using MDC Net) 63.8
22. Unit Capacity Factor (Using DER Net) 93.4 58.4 0 .9 4.8 I
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 05-21-82 thru 07-02-82 NA

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast ,

Achieved f INITIAL CRITICALITY INITIAL ELECTRICITY l COMMERCIAL OPERATION l

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 01-05-82 COMPLETED BY L.L. Rogers TELEPHONE 703-894-5151X251C MONTH December DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 832 17 849 2 838 18 849 3 849 19 847 1

4 849 20 848 i 5 848 21 847 6 848 22 847 7 849 23 846 8 850 24 847 9 849 25 848 10 850 26 846 11 850 27 848 12 849 28 847 13 850 29 843 14 849 30 848 15 850 31 851 l

l 16 850

\

r INSTRUCTIONS l

On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i l- - . . . . -.:.-. - . - - - -

i UNIT SHUTDOWNS AND POW,lLREDUCTIONS DOCKET NO. 50-338 UNIT NAME North Anna 1 DATE 02-05-82 REPORT MONTH DECEMBER COMPLETED BY L. L. ROGERS .i TELEPHONE (703)<894-5151 X2510 No. Date Type Duration Reason 2 Method of Licensee System Component Cause & Corrective (Hours) Ehutting 3

  • 4 Code 5

Action to  !

Down Reactor Report # Prevent Recurrence  !.

t t

i l

t I

'l i

i i

\

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions C S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee '

C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other 5

G-Operational Error (Explain)

. H-Other (Explain) Exhibit H - Same Source ,

4

_ _ _ _____._._a

Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH DECEMBER UNIT NAME NA-1 YEAR 1981 DATE 01-05-82 COMPLETED BY L. L. ROGERS f