Monthly Operating Repts for Nov 1990 for McGuire Nuclear Station Units 1 & 2
ML20065R719
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 11/30/1990
From: Moser S, Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20065R685 List:
References
NUDOCS 9012190148
Download: ML20065R719 (10)


Text

OPERATING DATA REPORT DOCKETNO 50 369 DATE December 14, 1990 OPEFATING STATUS COMPLETEDBY R.A. Willians TELEPHONE 704-373-5987

1. Unit Nase: McGuire 1
2. Reporting Period Novesher 1, 1990-Nevenber 30,1990
3. Licensed Thereal Power (MWt): 3411
6. Naseplate Ratiag (6ross MWe): 130$e Notes *Naceplate Rating I
5. Design Electrical Rating (Net MWe): 1180 (6ross MWe) calculated as
6. Marious Dependable Capacity (6tess MWe): 1171 1450.000 MVA .90 power
7. Matteus Dependable Capacity (Net MWe): 1129 factor per Page iii, B. If Changes Occur in Capacity Ratings (! tees Nuaber 3 Through 7) Since Last NURES-0020.

Report. Give Reasonsi

9. Power level 10 Which Restricted, if Any (Net MWe):
10. Reason for Restrictions, if any:

This Month Yr.-to-Date Cuaulative 11.HoursInReportingPeriod 720.0 8016.0 78988.0 12.' Nusber Of Hours Reactor Was Critical 378.5 4063.0 54921.9

'13. Reactor Reserve Shutdown Hours - --0-- --0--

10. Hours 6enerator On-Line 368.5 3977.2 54276.0
15. Unit Reserve Shutdown Hours --0-- --0-- --0--

'16. Gross Thereal Energy Benerated (MWH) 1146029 12316269 163717002

17. Gross Electrical Energy Generated (MWH) 394783 4112316 56339993
18. Net Electrical Energy Benerated (MWH) 369387 3985352 53771735
19. Unit Service factor- $1.2 49.6 68.8 20.UnitAvailabilityfactor _

51.2 49.6 68.8

21. Unit Capacity Factor (Using MDC Net) 45.4 42.9 58.9
22. Unit Capacity factor (Using DER Net) 43.5 41.1 57.B
23. Unit Forced Dutage Rate 48.8 20.7 13.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Nono 25.IfShutDownAttdtiOfReportPeriod.EstimatedDateofStartup

26. Units in Test Status (Prior to Coseercial Operation): Forecast Achieved INit!AL CRITICAllTY INiilAL ELECTRICITY COMMERCIAL OPERATION 901219014e 901214

{DR ADOCK 05000369 PDR

._ . , - . . . . . - - .= _. . . . . . ~ . ,

OPERATING DATA REPORT DOCKET NO 50-349 UNii McBuire 1 DATEDecesber 14,1990 COMPLETED BY _R. A. Williass TELEPHONE 704-373-5997

'MDNTH Novesber.1990

.El AVERABE DAILY PDWER LEVEL PA1 AVERAGE DAILY POWER LEYEL (MWe-Net) (MWe-Net) 1 0 17 145 2 0 1B 521 3 0 19 1058 4 0 .20  !!31 5- 0 21 1133 6 0 22 1140

.7 0 23 1140 0 0 24 1140 9 0 25 1140 10 0 26 1130 11 0 27 1139 12 = 0 28 1140

'13 0 29 1139  ;

14 0 30 1137 15 47l

' 16 1021-1

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 -

U N I T N A M E h w u 1 H t. 1 DATE 12/ 14/9o REPORT MONTH November 1090

~

. COMPLETED BY s. w. Most.R TELEPHONE ( / v4 } -3 / J-:> / bz (1) (4) (5) d)

(2 E

(3) dEt-HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E HOURS l' R/X NO. CODE CODE PREVENT RECURRENCE 16 90 1 S 264.00 A --

AA PENETR CONTROL ROOM VENTILATION SYSTEM INOPERABLE 17 90-11-12 F 7C.35 A --

SB HTEXCH ICE CONDENSER SYSTEM INOPERABLE 56-P 90-11-15 S --

H --

HB VALVEX SEQUENTIAL VALVE TRANSFER 18 90-11-17 F 17.12 A 3 HA INSTRU HIGH ELAUST HOOD TEMPERATURE (11F Forced (2) (3) (4)

Reason- Method: Ex1.ibit G - Instructions S Scheduled A-Equipment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of, Data 2-Manual Scram C-Refueling 3-Automatic Scram Even Sheets EntiT. Report (L2RFor Licensee D-Regulato g Restriction 4-Other (Explain) File (NUEG-0161) )

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error Exhibit I - Same Source H-Other (Explain) (Explain)

DOCKET No: 50 369 UNIT: McGuire 1 DATE: 12/14/90  :

NARRATIVE

SUMMARY

MONTH: November 1990-McGuire Unit 1 began the month of November shut down for repairs to the low pressure turbine. With the unit still shut down for the turbine repairs, both trains of the control room ventilation system were de:lared inoperable. The ventilation system work became critical path on 11/01. During this same time frame, the ice condenser system was declared inoperable. The ice condenser work became critical path on 11/12. The unit was placed on-line at 2221 on 11/14, and began a power  ;

increase. The unit was held at 30% power from 0830 to 0935 on 11/15 for sequential valve transfer. The unit reached 100% full power at 1845 on 11/16, and operated at 100% full power until 0320 on 11/17, when the unit tripped due to false indication of turbine high exhaust hood temperature. The unit returned on-line at 0830 on 11/19, and reached 100% full power at 1445 on 11/19. The unit operated at 100%

full power for the remainder of the month.

l Prepared by:

  • W. Moser Telephone: 704-373-5762 l

MONTHLY REFUELING INFORMATION REQUEST

1. Facility name: McGuire, Unit 1
2. Scheduied next refueling shutdown: August 1991
3. Scheduled restart following refueling: November 1991
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 443
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: March 2006 DATE: December 14, 1990 DUKE POWER COMPANY Name of

Contact:

J. A. Reavis Phone: 704-373-7567 i

(

I OPERAllN6 DATA REPORT DOCKET ND 50 370 DATE Deceeber 14,1990 Q((,RATINGSTATU3 COMPLETEDBY R.A. Williset_,,

TELEPHONE 704 373-5987

1. Unit Nase McGuire 2 .
2. Reporting Periodt hovesber 1, 1990-November 30,1990 3.LicensedthersalPower(MWt): 3411
4. Naseplate Fating (6ross MWe): 13056 Notes *Naseplate Rating
5. Design Electrical Rating (Net MWe): 1180 (6 toss MWe) calculated as

'6. Maxinus Dependable Capacity (Bross MWe): 1171 1450.000 MVA x .90 power

7. Marious Dependable Capacity (Net MWe): 1129 factor per Page lii, B. If Changes Occur in Capacity Ratings (Itees Nusber 3 Through 7) Since Last NURE6-0020.

Report.GiveReasons:

9. Power level 10 Which Restricted, if Any (Net NWeh
10. Reason For Restrictions, If any:

This Month Yr.-to-Dete Cueulative

11. Hours in Reporting Period 720.0 0016.0 59104.0
12. Nuster Of Hours Reat' Was Critical 0.0 5820.0 44522.8
13. Reactor Reserve Shui. sun Hours --0-- --0-- --0--
14. Hours Generator On-Line 0.0 5815.2 43743.3
15. Unit Reserve Shutdown Hours --0-- --0-- --0--
16. Bross Thereal Energy Generated (MWH) 0 19288414 142549684
17. Gross Electrical Energy Generated (MWH) 0 6731994 49914655
10. Net Electrical Energy 6enerated (MWH) -7012 6463423 47866320
19. Unit Service factor 0.0 72.6 73.9
20. Unit Availability factor 0.0 72.6 73.9.
21. Unit Capacity fartor (Using MDC Net) 0.0 71.4 70.4
22. Unit Capacity Factor (Using DER Net) 0.0 68.3 68.6
23. Unit Forced Outage Rate 0.0 0.4 9.0
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
25. If Sut Down At End Of Report Period. Estieated Date of startup December 21, 1990

'26. Units In Test Status (Prior to Consercial Operation): Forecast Achieved INiilALCRiflCALITY INiilAL ELECTRICITY COMNERCIALCPERA110N

e OPERAi!NSDATAREPORT DOCLET NO 50-370 UNii McGuire P DATEDeceeber 14. 1990 i- COMPLETEDBY R.A. Willi m TELEPHONE 704-373 59B7 i

MONTH Novesber,1990 QM. AVERAGE DAILY POWER LEVEL pal AVERABE DAILY POWER LEVEL

, (MWa-Net) (NWe-Net) 1 0 17 0 2- _

0 IB 0 3 0 19 0 i

4 0 , 20 0 5 0 21 0 6 0 22 0 7 0 23 0 0 0 24 _

0 9 0 25 0

' 10 0 26 0 11 0 27 0_

, 12 0 28 0 13 0 29 0 14 -0 30 0 15 0 16 0

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370' -

UNIT NAME nu,ulxt, 2 DATE- 12/14/90  !

REPORT MONTH November 1990 COMPLETED BY s. w. nudt.M TELEPHONE i / u4 } -a / 3-:: / oz

(1) 2) _

(4) (5) i -

E HOD i T A OF LICENSE i N -Y S SHUT EVENT SYS- CAUSE AND. CORRECTIVE O P ' DURATION O DOWN REPORT TEM COMPONENT ACTION TO '

. DATE E HOURS N- R/X NO. CODE CODE PREVENT RECURRENCE-2 90 1 S: 504.00 'C 1- RC FUELXX END OF CYCLE'6 REFUELING OUTAGE I 3 90-11-21 S 216.00 B --

HA TURBIN- SCHEDULED OUTAGE EXTENSION DUE TO LOW PRESSURE TURBINE WORK i

~

e 1

l .

I (1) (2) (3) (4) [

F Forced Reason- Method: Exhibit G - Instructions'  ;

S Scheduled A-Equihment FailureB-Maintenance or. test (Explain) 1-Manual for Pieparation of, Data i 2-Manual Scram Entry Sneets For Licensee t i

C-Refueling 3-Automatic Scram Event Report (LER  !

D-Regulatory Restriction 4-Other (Explain) File ~-(NUREG-Ol61)) .t E-Operator Training & License Examination i F-Administrative -(5)  !

G-Operator-Error (Explain) Exhibit I - Same Source  !

H-Other (Explain) f E

i i

[

f f

[

t I

DOCKET NO: 50-370 UNIT: McGuiro 2 DATE: 12/14/90 NARRATIVE

SUMMARY

MONTM: November 1990 i McGuire Unit 2 began the month of November shut down for its end of-cycle "6" refueling outage. The outage was extended past its scheduled on line date of 11/21 due to an enlargement in the scope of work involved with the low pressure turbine rotor replacement. The unit remained' shut down for the entire month.

i l

Prepared by: S. W. Moser Telephone: 704 373 5762 l

1

MONTHLT REIUhLING INFORMATION REQUEST

1. Facility name: McGuire, Unit 2
2. Scheduled next refueling shutdown: Unknown
3. Scheduled restart following refueling: ----
4. Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be? k If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 (b) in the spent fuel pool: 589
8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by present licensed capacity: December 2003 s

DATE: December 14, 1990 DUKE POWER COMPANY

-Name of

Contact:

J. A. Reavis Phone: 704-373-7567 l

. - - _ _ _ _ _ _ _ _ _