MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
-
e VIRGINIA ELucrHic AND POWER COh!Pm Itirn>rown,Viienixir unuoi December 15, 1993 U. S. Nuclear Regulatory Commission Serial No.93-763 Attention: Document Control Desk NL&P/JMJ:jmj Washington, D.C. 20555 Docket Nos. 50-338 50-339 ,
License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of November 1993.
Very truly yours,
~ W M. L. Bowling, Manager l Nuclear Licensing & Programs l Enclosure cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station P l O P - ['
9312210155 931130 E
[DR ADOCK 05000338 prm 7G2 t iIs
i 4
VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT l
MONTH: November YEAR: 1993 i
J l
I Approved:
l A
Station Manager
l1 4 ,
6 DPERATING DATA REPORT DOCKET NO.: 50-338 DATE: Dec. 1, 1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 DPERATING STATUS
- 1. Un i t N ame : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N o r t h A nna 1
- 2. Repor t i ng Per i od: . . . . . . . . . . . . . . . . . . . . . . November 1993
- 3. Licensed Thermal Power (MWt):........ .... 2,893
- 4. Nameplate Rating (Gross MWe):............. 947
- 5. Design Electrical Rating (Net MWe):....... 907
- 6. Maximum Dependable capacity (Gross MWe):.. 959
- 7. Maximum Dependable capacity (Net MWe):.... 911
~ 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
- 9. Power level to which restricted, if any (Net MWe): ___N/A
- 10. Reasons for restrictions, if any: N/A This Month Y-t-D Cumulative
- 11. Hours in Reporting Period.................. .. ........ . 720.0 8,016.0 135,372.0
- 12. Number of Nours Reactor was critical.... .... ......... 720.0 5,730.9 99,661.7
- 13. Reactor Reserve Shutdown Hours... ........ ...... ....... 0.0 68.8 6,826.8
- 14. Hours Generator On-Line.................... ............. 720.0 5,700.2 96,696.9
- 15. Unit Reserve Shutdown Hours. . ......................... 0.0 0.0 0.0
- 16. Gross Thermal E nergy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . . . 2,082,025.1 16,124,569.0 256,300,755.9
- 17. Gross Electrical Energy Generated (MWH)........... ..... 687,090.0 5,280,062.0 84,206,967.0
- 18. Net E l ec t r ical Energy Generat ed (MWH ) . . . . . . . . . . . . . . . . . . . . 654,706.0 5,017,991.0 79,731,931.0
- 19. Unit Service Factor........ . ...... ...... ... ........ 100.0% 71.1% 71.4%
20, Unit' Availability Factor................ .... ......... . 100.0% 71.1% 71.4%
~ 21. Unit Capacity Factor (using MDC Net)..................... 99.8% 70.5% 65.9%:
- 22, Uni t Capac i ty F actor (us ing DER Ne t ). . . . . . . . . . . . . . . . . . . . . 100.3%~ 69.0% 64.9%
- 23. Forced Outage Rate............. ........... ...... ...... 0.0% 0.0% 10.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each)__N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup:_N/A-
- 26. Units in Test Status (Prior to commercial operation):
Forecast Achieved INITIAL CRITICALITY INIT!AL ELECTRICITY
' COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-338 Unit: NA-1 Date: Dec. 1, 1993
Contact:
G. E. Kane Phone: (703) 894-2101 MONTH: November 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) .;
1 909 17 910 2 908 18 910 ,
3 907 19 909 4 906 20 910 5 910 21 908 6 911 22 909 7 911 23 909 8 911 24 910 9 910 25 910 10 911 26 910 ,
11 910 27 910 12 902 28 910 13 911 29 910 14 '911 30 909 15 910 16 910 Instructions:
On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. . compute to the nearest whole megawatt. ;
._ _ . ._. . _ . . = . . . . _ _ . . . . . _ . __
. .- .i NORTH ANNA POWER STATION f
UNIT NO.: 1 MONTH: November
SUMMARY
OF OPERATING EXPERIENCE Page 1 of 1 ,
Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted' in significant non-load related incidents.
Date Time Data ,
November 01, 1993 0000 Began month with unit at 100% power, 954 MWe.
November 12, 1993 1054 Commenced unit ramp-down for TVFT.
1146 Unit stable at approximately 90% power, 870 MWe for TVFT. .
1232 TVFT completed satisfactorily. ,
1 1320 Commenced unit ramp-up to 100% power.
1556 Unit stable at 100% power, 954 MWe.. ;
November 30, 1993 2400 Ended month with unit at 100% power, 950 MWe.
9 r
l 1
l I
'l
, Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-338 ,
Report Month November Unit Name: NA-1 ,
Year: 1993 Date: December 1, 1993 l
Contact:
G. E. Kane
3
+
h s
a
.1 l
4
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.: 50-338 UNIT NAME: NA-1.
DATE: Dec. 1, 1993 REPORT MONTH: November 1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 t 1 2 3 4 5 No. Date Type Duration Reason Method'of Licensee System Component Cause & Corrective +
(hrs) Shutting Event Code Code Action to I Down Reactor Report # Prevent Recurrence l
ONo entry this month.
1: Type 2: Reason 3: Method 4:
F= Forced .A= Equipment Failure -(explain) 1= Manual Exhibit F- Instructions S= Scheduled B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory Restriction 4= Continuations Event' Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
F= Administrative 9=Other G= Operational Error 5: t H=Other (explain) Exhibit H - Same Source
.t l
l
_ _ . __ _ _ _ _ _ _ _ _ . _ _ . _ _ _ _ _ . _ -. . . _ _ _ . . _ . . - . . _ .. . ___ ,, . . .__. . ~ . . ._ . _ . _ _ _ _ . , _ _
, . . .. , , . . -- . . . .. -- . - - - -. -, ~-
P
. OPERATING DATA REPORT DOCKET NO.- 50-339 DATE: Dec. 1, 1993 ,
CONTACT: G. E. Kane (
PHONE: (703) 894-2101 OPERATING STATUS L
.1' ' Unit Name:.......... ........... .. ... .. North Anna 2
- 2. . Reporting Period:................... ..... November 1993 t
- 3. Licensed Thermal Power (MWt):............. 2893
- 4. Nameplate Rating (Gross MWe): ............ 947
.5. Design Electrical Rating (Net MWe):. ... . 907 ,
- 6. Maximum Deperidable Capacity (Gross MWe): . 957
' 7. Maximum Dependable Capacity (Net MWe): ... 909
- ?.
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons: ,
- 9. Power level to which restricted, if any (Net MWe): _ N/A
- 10. Reasons for restrictions, if any: N/A .,
.p i
I This Month Y-t-D Cumulative-
- 11. Hours in Reporting Period.. ..................... ....... 720.0 8,016.0 113,640.0 ~
- 12. Number of Hours Reactor was Critical..................... 720.0 6,585.4 93,629.6 !
- 13. Reactor Reserve Shutdown Hours. ... ..................... 0.0 168.8 6,413.2 !
- 14. Hours Generator On-Lino..... ......................... .. 720.0 6,560.3- 92,573.4 !
- 15. Uni t Reserve Shutdown H ours. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 0.0 '
- 16. Gross Thermal Energy Generated (MWH) .................... 2,080,127.8 17,950,028.9 250,074,793.4
- 17. Gross Electrical Energy Generated (MWH).................. 675,760.0 5,859,245.0 81,895,961.0
- 18. Net Electrical Energy Generated (MWH)....... .. ....... . 643,158.0 5,559,594.0 78,384,075.0 i
- 19. Unit Service Factor..... ....... ........................ 100.0% 81.8% 81.5%
- 20. Unit Availability Factor............................ .... 100.0% 81.8% 81.5%'
- 21. Unit Capacity Factor (using MDC Net).............. ..... - 98.3% 76.3% 76.5%
- 22. Unit Capacity Factor (using DER Net).......... .......... 98.5% 76.5% ..76,0%
- 23. Forced Outage Rate........................................ 0.0% 3.6% 5.4%
- 24. Shutdowns Scheduled Over Next 6 Months.(Type, Date, and Duration of Each):_N/A l
- 25. If Shutdown at end of Report Period, estimated time of Startup: '
N/A 26.. Units in Test Status (Prior to Commercial Operation):
Forecast . Achieved INIT!AL CRITICALITY INITIAL ELECTRICITY
. COMMERCIAL OPERATION
AVERAGE DAILY UNIT POWER LEVEL Docket No.: 50-339 Unit: NA-2 Date: Dec. 1, 1993 .
Contact:
G. E. Kane Phone: (703) 894-2101 MONTH: November 1993 DAY AVERAGE DAILY POWER DAY AVERAGE DAILY POWER LEVEL (MWe-Net) LEVEL (MWe-Net) 1 886 17 896 2 892 18 895 3 892 19 895 4 875 20 896 5 886 21 896 6 893 22 896 7 884 23 897 ,
8 881 24 897 9 883 25 897 10 893 26 897 11 897 27 897 12 897 28 898 13 898 29 896 14 897 30 896 15 897 ;
16~ 897 '
l
- )
1
.i Instructions:
On this format, list.the. average daily unit power level in MWe-Net for each day in the reporting-month. Compute (to the nearest
- whole megawatt.
l l
.m n ,, y
." l
. 4 NORTH ANNA POWER STATION l UNIT NO.: 2 MONTH: November ;
1
SUMMARY
OF OPERATING EXPERIENCE ;
i Page 1 of 1 Listed below in chronological sequence is a summary of operating experiences for this month _which required load reductions or resulted in significant non-load _-related incidents'.
Date Time Data
. November 01, 1993 0000 Began month with unit at 98% power, 927 MWe, in a power ramp-up from refueling outage. )
1 1230 Unit stable at 100%' power, 934 MWe. j November 30, 1993 2400 Ended month with unit at 100% power, 940 MWe.
1
.i l
}
-o t
Page 1 of 1 I UNIT SHUTDOWN AND POWER REDUCTIONS Explanation Sheet Docket No.: 50-339 Report Month November Unit Name: NA-2 e
1993 Year: Date: December 1, 1993
Contact:
G. E. Kane
A r
9 1
p P
S t
r.g- -.
UNIT SHUTDOWNS AND POWER REDUCTIONS .
DOCKET NO.: 50-339 UNIT NAME: NA-2 DATE: Dec. 1, 1993 REPORT MONTH: November 1993 CONTACT: G. E. Kane PHONE: (703) 894-2101 1 2 3 4 5 No. Date Type Duration Reason Method of Licensee System Component Cause & Corrective (hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence ONo entry this month.
1: Type 2: Reason- 3: Method 4:
F= Forced A= Equipment Failure (explain) 1= Manual Exhibit F - Instructions S= Scheduled, B= Maintenance or Test 2= Manual Scram for preparation of Data C= Refueling 3= Automatic Scram Entry Sheets for Licensee D= Regulatory-Restriction 4= Continuations Event Report (LER) File E= Operator Training & License Examination 5= Load Reduction (NUREG-0161)
.F= Administrative 9=Other G= Operational Error 5:
H=Other (explain) Exhibit H'- Same Source I