ML20052H736

From kanterella
Jump to navigation Jump to search
LER 82-015/03L-0:on 820210,surveillance Requirement Per Tech Spec 4.5.J.2.b on Svc Water Pump 1P41-C001C Not Performed After Pump Seal Repair.Caused by Unintentional Omission by Licensed Personnel
ML20052H736
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 02/25/1982
From: Baxley S
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20052H732 List:
References
LER-82-015-03L, LER-82-15-3L, NUDOCS 8205210386
Download: ML20052H736 (2)


Text

NRC FORM 3S6 U. S. NUCLEAR REGULATORY COMMISSION (7 77)

LICENSEE EVENT REPORT i COTJTROL BLOCK: l l l l l l l (PLEASE PRINT OR TYPE ALL REQUIRED INFORMATION) 1 6

' _ [o d8 l9 G l ALICENSEE 7

l E l CODE I l H l 141 l@l 15 0 l 0 l - l 010 l 0 l 0 l 0 l- 101026 l@l LICENSE NUMBER 26 4 l1 l1 l1 l 1 l@l57 CAT LICENSE TYPE JO l l@

58 CON'T lolil 7 8

$[RC60l L l@l 01510 61 l 01013 l M21169 l@lEVENT OOCKET NUMBER 01211 D ATE InlaI?l@l0l2l2l518l2l@

74 75 REPORT DATE 80 EVENT DESCRIPTION AND PROB ABLE CONSEQUENCES h lOl2l l During normal power operation the IC Plant Service Water Pumo IP41-C001C was taken I i 10:3i j out for pump seal repair at 0555 on 2-10-82 and the Tech. Specs. surveillance re- I l

l O i 4 l l quirement per 4.5.J.2.b was not performed. This is a non-repetitive occurrence. l lO isi [There were no effects upon public health and safety due to this event. I 10161l l 10171 l l 10181l I i CODE C0De' S0s* CODE COMPONENT CODE SU8C D'E SU E

&L9J8 lW lA l @ [A j @ l_A_J @ l Zl Zl Z l Zl Zl Zl @ LZ_] @ LZj @

, 7 9 to 11 12 13 18 19 20 LER EV E NT 'Y E AR REP RT O ODE T N

@ sgg'RO ! 81 21 a

1-1 I olil si I/l lolaI LLJ L-J Loj

_ 21 22 23 24 26 27 28 M 30 31 32 KEN A T ON ON PL NT MET HOURS SB IT D FOR 8. SU PL E MANUFACTLRER lG 33 lg[34Z_J@ l Z l@

35 l% Z l@ l0l010l0l 3/ 40

[JJ@

41

[N_J@

42

[Zj@ lZl919l91@

43 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS h i

ii io l lThe missed surveillance requirement was an unintentional omission on the part of the I

, i i l licensed personnel on shift. Upon discovery of the missed surveillance at 1645 on I i, ,,i[02-10-82, the required surveillance was started. The "C" PSW pump was returned to l

i,i3i l operable status at 1800 and the LC0 was terminated. l Ii I4 I I l s 7 8 9 80 A S  % POWER OTHER STATUS IS O RY DISCOVERY DESCRIPTION l115 l [f_J@ l 0 l 6 l 8 l@l NA l [,A_J@l Plant Personnel Observation l ACTIVITY CO TENT I RELE ASED OF RELEASE AMOUNT OF ACTIVITY LOCATION OF RELEASE i l 1 16 i LZ_J @ LZj@l NA l l NA l PE RSONN E L f X POS ES NUMBE R TYPE nESCRIPTION l1171 l0 l0 l0 l@lZ l@l13 NA 80 l

7 8 9 11 12

[U BER "$ESCRIP TIONg 5210386 820225 li la 8l 9l0 l0 l0 l@l NA s M M 05000 l 7 _11 12 80 TYPE DESC PT ON i 9 NA l

[Z_J@l 7 8 9 10 80 2 O tsetj; LN @DE l CRIPTION NA l lllll1llI1lll1 7 8 9 10 68 69 80 5 NAME C'F PREPARER S. X. Baxley, Supt. of Operations pgoys 912-367-7781 E,

)

LER #: 50-321/1982-015 Licensee: Georgia Power Company Facility Name: Edwin I. Hatch Docket #: 50-321 Narrative Report for LER 50-321/1982-015 During normal power operation on 2-10-82 at 0555, the IP41-C001C was tagged out to allow Maintenance to repair a seal leak on the Plant Service Water pump. Due to personnel error, the required immediate surveillance per Tech. Specs. 3.5.J.2.b was not performed. At 1615 on 2-10-82, it was discovered that the required surveillance was not performed. At 1645 the required surveillance was started on the A, B & D Plant Service Water pumps and was completed at 1700 on 2-10-82.

The IP41-C001C Plant Service Water pump was returned to operable status-at 1800 on 2-10-82.

A revision to the LC0 Status Sheet (HNP-901, Figure 1) has been sub-mitted which will allow logging the required immediate action or sur-veillance to be performed and the subsequent action to_ be performed while -

LC0 is in effect. Also, provisions were made to indicate the required date and time of the next surveillance. This change will allow the Shift Foreman and Shift Supervisor to determine if the required surveil-lance has been performed and the time and date of the next required surveillance.

f

-. __ ~-- , _ - . -