Monthly Operating Repts for May 1993 for McGuire Nuclear Station,Units 1 & 2
ML20045B224
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/31/1993
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20045B220 List:
References
NUDOCS 9306160434
Download: ML20045B224 (10)


Text

_ . _ . ... _ .. _ __ __ _ . _ .

. i 1

0FERATINS DATA FEPDRT r

DDCKET ND 50-?69 I LATE kne 15. 1993  :

0FERATlh5 STATUS COMPLETED Bf R.A. Williaes i-TELEPHONE 704-252-5346 ~5

1. Unit Nase: McGuire 1 I
2. Repertir.; Ferir>d: May 1, 1993-May 31, 1993 l
3. Licensed Thersal Fener Wti: 3411 l[
4. Nueplate sating (Grcss MWe): 1305* Notes + Nameplate Rating.  !
5. Design Electrical Rating { Net MWe): 1100 (Eress N el calculated as-  !
6. Maxisus Deperdatle Capacity (Srcss Ne): 1171 1450.000 NA : .90 power
7. Maximus Dependable Capacity iNet N e): 1129 factor per Page iii,
9. If Chan;es 0:ccr :n Capacity Rat:ngs (itees Nuater 3 Through 7) Since Last NUREE-0020.  !  :

I Fepart. Elve feasons:

{

r

9. Fever Level Te Which Restricted, If Any thet Wel: .
10. Reasen fer Restn ctions, If any:  ;

I t

i This Month Yr.-to-Date Cuculative.

f f

11. Hcurs In Reptrting Period 7%,0 3623.0' 100799.0

. {

12. h eter Of Hours Featter Was Critical 0.0 1697.3 70543.5  ;
13. Reatter Reserve Shutdown Hours ~0- ~0- [
14. Hours Senerattr On-Line 0.0 1626.1 69002.6 {

' 15. Unit Reserve Shutdenn Hours - - ~ - -

16. Bress Thermal Energy Benerated WH) 0 5736006 215510047- i
17. Eress Electrical Energy Generated (NH) 0 1925633 74160968

-12. Net Electrical Energy Generated tNH) -6263 IB99720. 70916055 l

- 19. Unit Service Fatter 0.0* ' 46.5 - 69.3

20. Unit Availability factor 0.0 46.5 69.3
21. Unit Capacity Facter (Using MDC heti 0.0 ' 46.4 61.1
22. Unit Capacity factor (Using LER Net) 0.0 44.4 ~ 59.5- ,

23.UnitFercedOstageRate . .

0.0 0.0 13.3 .i

, b.' Shutd:wn Schehled Dver hext 6 Months iType, Date, and Duration of Each)-

Currentiv Refuelinn  !

~

25.IfSputDeanAtEndOfFeportFeried.EstimatedDateofStartup: June 13, 1993 ,

'26. Units in lest Status (Prict to Ctesertial Operatien): Forecast Achieved ~  !

h

-1 IklTIAL CRITICALITY  !

IhlTIAL ELECTRIC 111  !

CCMERCIAL DPERAT10N w  :

x; 9306160434 930615 ' f!

PDR ADOCK 05000369  ;

R PDR (d2- .,

4 4

0FERATING DATA REFORT l DDCfsET ND 50-369- i UNIT NcGuire 1 DATE June 15, 1993 CCMPLETED BY R. A. Willins TELEPHONE 704-382-5346 E 9

MDtiTH May, 1993 I

i DAY WEEAEE DAILY PDWER LEVEL DAY AVERAEE DAILY PDWER LEVEL (MWe-Net) (MWe-Net)

.[

l D 17 0 ,

t 2 0 18 0

'l 3 0 19 0  !

4 0 20 0 5 0 21 0 -!

r 6 0 22 0 7 0 23 0

{

-i 8 0 24 0  !

9 0 25 0 10 0 26 0 # ,

11 0 27 0 1

12 0 2B 0 l

13 0- 29 0 14 0 30 0 i i

15 0 31 0 1

16- 0 1

l r

n . - - , .

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-369 UNIT NAME Mt'uulub i DATE u6/1d/9a REPORT MONTH May 1993 COMPLETED BY N. C. 51MMUNS TELEPHONE (/uqJ-auz-5Joa (1) 2) _

(4) (5)

E HOD T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

, DATE E HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 1 93 1 S 744.00 C --

RC FUELXX END-OF-CYCLE 8 REFUELING OUTAGE

-(l)F Forced (2)

Reason *

(3)

Method:

(4)

Exhibit G - Instructions S Scheduled A-Equihment FailureB-Maintenance or test (Explain) 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets For Licensee

.C-Refueling D-Regulatory Restriction 3-Automatic Scram 4-Other (Explain) Eyent (LER File Report (NUREG-0161))

E-Operator Training & License Examination F-Administrative G-Operator Error (5)

Exhibit I - Same Source H-Other (Explain) (Explain)

-)

i i

i MONTHLY REFUELING INFORMATION REOUEST i

1. Facility name: McGuire. Unit 1  !
2. Scheduled next refueling shutdown: Current 1v Refuelina [

-l

3. Scheduled restart following refueling: June 1993 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF l ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 [

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4. Will refueling or resumption of operation thereafter require a f technical specification change or other license amendment?  !

If yes, what will these be? [

If no, has reload design-and core configuration been reviewed by l Safety Review Committee regarding unreviewed safety questions?

5. Scheduled date(s) for submitting proposed licensing action and ,

supporting information.  !

6. Important licensing considerations (new or different design or f supplier, unreviewed design or performance analysis methods,  !

significant changes in design or new operating procedures). j

7. Number of Fuel assemblies (a) in the core: 193  :

(b) in the spent fuel pool: 583 i

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---  !
9. Projected date of last refueling which can be accommodated by i present licensed capacity: March 2006 l DUKE POWER COMPANY DATE: June 15, 1993 i,

Name of

Contact:

N. C. Simmons Phone: 704-382-5263 i

?

i

?

l

-l i

l l

l l

i

h i

DOCKET: 50-369 i UNIT: McGuire 1 Date: 06/15/93 NARRATIVE

SUMMARY

j i

MONTH: May 1993  !

McGuire Unit 1 began the month of May in end-of cycle 8 refueling outage. The unit was in the refueling outage for the entire month. r i

I p

t i

I i

)

t i

t f

Prepared by N. C. Simmons Telephone: 704-382-5263 l t

[

I i

I l

i

. i OPEEATING DATA REFORT D0trET N0 t>0-370 DATE June 15. 1993 OPE m INS STATUS COMPLETED BY P.A. Williaes TELEPHONE 704-3E!-5346

1. Unit Naee; McGuire 2
2. Feporting feriod: May 1, 1993-May 31, 1993
3. Licensed Thersal Power (MWt): 3411
4. Naseplate Rating (Gross MWe): 1305* Notes #Naseplate Rating
5. Design Electrical Pating (Net MWel: 1150 (Eross MWe) talculated as
t. Maxinus Dependable Capacity (Bress MWe): 1450.000 MVA x .90 power

]

1171 .. !

7. Masteus Dependable Capacity (Net NWe): 1129 fattor per Fage lii, 1 E. If Chan;es 0: cur in Capacity Ratings (itees Wcater 3 Through 7) Since Last NUREE-0020.

lL Featrt. Give Reasons:

9. Foner Level To Wnith Festricted, if Any (Ket MWel

( IL Feason For Festrictions, If any:

l This Month Yr.-to-Date Cusulativa I 11. lims in Reporting Feriod 744.0 3623.0 81095.0

12. Osur Of t%rs Featter Was Critical 744.0 3591.9 6299B.2
13. Rea:ter Eeserve Shtdown Heurs --0-- --0-- - 14. ikurs Senerater Cn-Lirie 744.0 3574.9 62072.0 .
15. hit Faern Shuthun Hours --0-- --0-- --0--
16. Eross Thersal Energy Eererated (fWH) 2465E61  !!B2937B 203236934 -
17. Eross Electrical Erergy Generated iMWM 857156 4148133 71047834
19. Net Electrical Energy Generated (f9H) E24206 39E6201 68147166

,. 19. h it Service fatter 100,0 98.7 76.5 l 20. hit Availatihty facter 100.0 98.7 76.5 l

21. Unit Ca;atity Tacter iusin; MC Aet) 99.1 97.5 73.5
l. 22. h it Capa:lty factor (Us:r; DER Net) 93.9 93.2 71,2 l E3. Unit ferced Outage Eate 0.0 1.3 7.3
24. Shuthwn kr>edaled Over Kent 6 8or,ths (Type, Date, and Duration of Each);

-Refueline - July 01. 1993'- 75 days

25. If Shut Dean At End Of Eeport Period. Estisatea Date of Startup
26. W its In Test Status (Frist to Cenaercial 0;erationi: Forecast A hieved 1NITIAL CfdTICALITY INITIAL ELECTRICITY CEMEPCIAL 0FEFATION

i OPERAilNS LATA FEFDRT-DDCLET ND 50-370 UNIT McGuire 2 DATE June 15, 1993 CDNFLETED SY F.A. Williers IELEFHONE 704-3E2-5346 NDNih "ay, 19E3 EAf AVEEASE 0AILY F0iER LEVEL DAY AVEEA5E DAILY POWEF LEVEL (Ne-he t ) (bedet) 1 7E9 17  !!42 2 1106 IB 1140 3 11=3 19 1140 4 1169 20  !!34 5  !!50 21 1135 6 1151 E2 1135 7 1146 23  !!15 E 1146 24  !!1B i  !!46 25 1119 10 1147 26  !!39 11 1147 27 1135 IE '147 2B  !!36 13 1142 29 1136 14 _

1!44 30 1012 15 __.

1143 31  ?!4 16 11 4

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME ~ Muuulut, z DATE U b/1 D/ 9 3 ,

REPORT MONTH May 1993 COMPLETED BY I4 . c. s 1MMurds TELEPHONE t/v4)-38z-Dzo; (1) 2) _

(4) (5)

E HOD

.T A OF LICENSE N Y S SHUT EVENT SYS- CAUSE AND CORRECTIVE O P DURATION O DOWN REPORT TEM COMPONENT ACTION TO

. DATE E. HOURS N R/X NO. CODE CODE PREVENT RECURRENCE 12-P 93 1 S --

B --

HD HTEXCH EROSION WORK ON 'A' BLEAD LINE OF THE HEATER EXTRATION LINE 13-P 93 1 S --

B --

HD HTEXCH EROSION WORK ON 'A' BLEED LINE OF THE HEATER EXTRACTION LINE 14-P 93- 5-31 S --

C --

ZZ FUELXX UNIT HELD AT 65% POWER TO MOVE END-OF-CYCLE 8 REFUELING OUTAGE TO JULY 1, 1993 (1) (2) (3) (4)

F Forced Reason: Method: Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram EntW Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER D-Regulatory Restriction 4-Other (Explain) File (NUREG-0161))

E-Opera or Training & License Examination F-A min strativ (5)

G-Operator Error (Explain) Exhibit I - Same Source H-Other (Explain)

. . ~. . -- -. - . - .. ~,

t l

l

^

MONTHLY REFUELING INFORMATION REOUEST  !

1. Facility name: McGuire. Unit 2
2. Scheduled next refueling shutdown: July 1993 f
3. Scheduled restart following refueling: Sente.mber 1993 .

THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF  :

ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4  !

THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT. j r

4. Will refueling or resumption of operation thereafter require a j technical specification change or other license amendment?

i If yes, what will these be?

If no, has reload design and core configuration been reviewed by i

) Safety Review Committee regarding unreviewed. safety questions?  ;

S. Scheduled date(s) for . submitting proposed licensing action -and  :

supporting information. t

6. Important licensing considerations (new - or different design or supplier, unreviewed design or performance analysis methods,  :

significant changes in design or new operating procedures).  !

7. Number of Fuel assemblies (a) in the core: 193  ;

(b) in the spent fuel pool:-741  ;

i

8. Present licensed fuel pool capacity: 1463 Size of requested or planned increase: ---
9. Projected date of last refueling which can be accommodated by i present licensed capacity: December 2003  ;

DUKE POWER COMPANY DATE: June 15, 1993 -

Name of

Contact:

N. C. Simmons Phone: 704-382-5263 l 3

i r

I i

~

4 l

i DOCKET: 50470  ;

i UNIT: McGuire 2 f Date: 06/15/93 NARRATIVE

SUMMARY

MONTH: May 1993 ,

McGuire Unit 2 began the month of May operating at 100% full power. The unit started a power decrease on 5/1 at 0200, the unit held at 62% power from 0000 to 0730 to do erosion work on the "A" bleed line of the heater extraction line. The unit reduced power and held at 55% power from 0927 to 1935 for erosion ,

work on the "A" bleed line of the heater extraction line. The unit was retumed to 100% power on 5/2 at 0735. The unit started a power decrease on 5/30 at 0813 to 65% power, the unit reached 65% power on  !

5/31 at 0000. The unit is holding at 65% power to move the end-of-cycle 8 refueling outage to July 1,1993. !

The unit operated at or near 65% for the remainder of the month.

i.

i Prepared by N. C. Simmons 1 Telephone: 704-382-5263 j i