MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
. - .
4 VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 i June 13,1990 U. S. Nuclear Regulatory Commission Serial No. 90 357 Attention: Document Control Desk NL&P/JYR Washington, D.C. 20555 Docket Nos. 50 338 50 339 License Nos. NPF-4 NPF 7 Gentlemen:
1-VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT l Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 l' - for the month of May 1990.
. Very truly yours,
' W. L. Stewart :
Senior Vice President - Nuclear Enclosures 4 l-L cc: 'U,S. Nuclear Regulatory Commission
- l. ' 101 Marietta Street, NW . "
l
' Suite 2900 Atlanta, GA 30323 Mr. M. S. Lesser NRC Senior Resident inspector l North Anna Power Station L
l 1
P k b $0"$0$$ b0 . ,$8 .
E R 1
.1 4L
.. \
.e - . \
l l
l VIRGINIA POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT t-MONTH: May YEARt. 1990 1
B I
l l
i 1
L l ~'
l-1 i ,
! t Approved:
i
/ Stfation Manager l
1
.1
r
?
, L t
, OPERATING DATA REPORT i
DOCKET NO.: 50 338 :
DATE: Jure 4, 90 (
COMPLETED BY: T. Phillips l PHONE: (703)894 5151 X2774 OPERATING STATUS
- 1. Unit Names................................ North Anna 1-
-. 2. Reporting Periods......................... May 1990 i
- 3. Licensed Thermal Power ( Wt) ............. 2,893 *
. 4.- Nameplate Rating (Gross We) ............. 947
- 15. Design Electrical Rating (Net We) ....... 907
- 6. Maxisue Dependable Capacity (Gross We) .. 959 (
- 7. ' Maxisun Dependable Capacity (Net We) .... 911 i L
- 8. If changes occur in Capacity Ratings (Items No. 3 thru 7) since last report, give reasons:
N/A ,
- 9. ; Power level to which restricted, if any (Net We): _ N/A
- 10. Reasons for restrictions, if any: N/A This Month YtD - Cunulative i
- 11. Hours in Reporting Period................................ 744.0 3,623.0- 104,675.0
- 12. Nu e er.of Hours Reactor was Critical..................... 744.0 3,611.4 74,853.9-
- 13. Reactor Rose.-ve Shutdown Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . -0.0 0.0 6,603.6 7
.14. Hours Generator 0n Line.................................. 744.0- 3,589.0 72,083.0 ;;
- 15. (Jnit Reserve Shutdown Hours.............................. 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (WH)..................... 2,134,193.8 10,328,906.8 192,219,684.8
- 17. Gross E lec t rical Energy Generated (WH). . . . . . . . . . . . . . . . . . 709,872.0 W 8,304.0 63,145,126.0
- 18. Net Elect rical Energy Gerarated (MWH) . . . . . . . . . . . . . . . . . . . . 674,272.0 ffi,981.0 -59,767,194.0
- 19. Unit Service Factor...................................... 100.0% 99.1%- 68.9%
- 20. Unit Availability Factor................................. =100.0% 99.1% 68.9%
- 21. Unit capacity Factor (using MDC Net)..................... 99.5% 99.1% 63.9%.
- 22. Unit Capacity Factor (using DER Net)..................... 99.9% 99.6% 63.0%
23.' Forced Outage Rate....................................... 0.0 0.9% 13.3%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each): N/A
- 25. If Shutdown at end of Report Period, estimated time of Startup: _N/A j
- 26. Units in Test Status (Prior to Commercial Operation): '
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~
f -- 'I AVERAGE DAILY UNIT POWER LEVEL a
i Docket No.: 50-3381 Unitt NA-1 Dates = June 4, 1990 i completed by: T. Phillins Phonet (703) 894-5151 x2774 l t
i MONTHt- May 1990 ,
DAY AVERAGE DAILY POWER DAY AVERAGE DAILY LEVEL :
LEVEL (MWe-Net) LEVEL (MWe-Net) 1 916 17 915 2 916 18 916 4 13 916 19 916 4 916 20 916 5 899_ 21 916 6 916 22 916 7- 916 23 916 8 915 24 916 L 9 915 25 915 10 915 26 915 11 724 27 906 '
12 833 28 916 13- 917 .29 915 ,
14 916 30 915 15 915 31 915 16 916 i
?
i l:
I' i
~
L n Instructions: t On'this format, list the average daily unit power level in MWe-L Net for each. day in the reporting month. Compute to the. nearest
)
whole megawatt.
i i
UNIT SHUTDOWNS AND POWER REDUCTIONS 7.
DOCKET.NO.: 338
UNIT NAME: NA-1 DATE: June 4,T1990
-REPORT MONTH: (May.1990 COMPLETED BY: T. Phillips?
PHONE: .(703)894-5151 x2774 1 2 3 4 5 No. Date' Type Duration Reason Method of Licensee System- Component Cause & Corrective (hrs) Shutting Event. Code Code Action to ..
Down Reactor Report # Prevent Recurrence
l l
l
[
1: Type. 2: Reason 3: Method 4:
i F=Ferced A= Equipment Failure (explain) 1= Manual Exhibit F'- Instructions-
! S= Scheduled B= Maintenance or Test '2= Manual Scram for preparation of' Data l C= Refueling 3= Automatic Scram Entry Sheets for Licensee l D= Regulatory Restriction 4= Continuations Event Report (LER) File i E= Operator Training & License Examination 5= Load-Reduction (NUREG-Ol61)
L 'F= Administrative -9=Other i G= Operational ~ Error .5:
l H=Other (explain) Exhibit H Same-Source!
i
_ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ~ . _ _ _ _ _ _ _ - _ _ . _ _ , d-- ,- - - ;c ~- --~- ..-- ~ ~ - - ,- l l- ~ , , - -- ~ - , - ,
i h
- .. i
.. o i
i Page '1 of __1 l
l UNIT SHUTDOWN AND POWER REDUCTIONS l Explanation Sheet )
'l l
Docket No.: 50-338 '
1 Report Nonth May Unit Name: NA-1 _
Year 1990 Date: June 4, 90 Completed by: Todd Phillies
?
w I
l L !
l I
~
,a .
j l
NORTH ANNA POWER STATION -]
UNIT NO. 1 NONTH: May t
f
SUMMARY
OF OPERATING EXPERIENCE i i
Listed below in chronological sequence is a summary of !
operating experiences for this month which required load reductions !
or resulted in significant non-load related incidents. !
h Date Tint Data ,
May 01, 1990 0000 Began month with Unit at 100%, 965MW.
May 05, 1990 0153 Removed 1-SD-P-1A for maintenance, MW l reduced, i
May 05, 1990 1439 1-SD-P-1A returned to service, normal operating MW restored.
May 11,'1990 0030 Commenced ramp down to 80% power for "A" Feed train maintenance.
0253 Unit stabilized at 759 MW for "A" Feed train maintenance.
May 12, 1990 -0815 Commenced ramp up to 100% power. l l
1100 Unit stabilized at 962 MW, 100% power.
May 31, 1990 2400 Ended month with Unit at 100%, 965MW.
1 1
t t.:
-* OPERAflWG DAto REPORT DOCKET NO.: 50 339 DATE: June 4, 90 COMPLETED BY . T. Phillips -
PHONE: (703)S94 5151 x2774
+
OPERATING STATUS
' t. Un i t N ame s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . N o r t h Anna 2 g - 2. ' R epor t i rgi Per i od s . . . . . . . . . . . . . . . . . . . . . . . . . May 1990 -
- 3. ~ L icensed Therrael Power (Wt ) . . . . . . . . . . . . . 2893
- 4. -Nameplate Rating (Gross MWe) ............. 947
- 5. Desten Electrical Rating (Net MWe):.......- 907
' 6. Maximum Dependable Capacity (Gross We) .. 957
- 7. Maximum Dependable Capacity (Net We) .... 909
- 8. If changes occur in Capacity Ratings (Itoss No. 3 thru 7) since last report, give reasons:
I N/A
- 9. Power level to which restricted, if any (Net We): _ N/A
- 10. Reasons for restrictions, if any N/A This Month Yt0 Cumulative
- 11. Hours:I n R epor t i ng P e r i od . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 3,623.0 82,943.0-
- 12. Number of Hours Reac t or was cr i t i ca t . . . . . . . . . . . . . . . . . . . . . 744.0 3,623.0 67,745.1
- 13. React or Reserve Shut down Hours . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 5,854.9
- 14. H ours Genera t or 0n L i ne . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 744.0 3,623.0- 66,874.9
- 15. Uni t R eserve Shut down H our s. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 0.0 0.0 0.0 -
- 16. . Gross Thermal Energy Generat ed (MWH) . . . . . . . . . . . . . . . . . . . . . 2,150,934.1 10,474,663.8 178,621,010.8
- 17. Gross Elect rical Energy Generat ed (MWH). . . . . . . . . . . . . . . . . . 709,212.0- 3,459,647.0 58,465,164.0
- 18. Net Electrical Energy Generated (MWH).................... 673,842.0 3,291,469.0 56,130,292.0 19.' Unit:$ervice Factor...................................... 100.0% 100.0% 80.6%
20.: Unit Avallability Factor................................. 100.0% 100.0% 80.6%
- 21. Unit Copecity Factor (using MDC Net)..................... 99.6% 99.9% 75.3%
22.; Unit Capacity Factor (using DER Net)..................... 99.9%. 100.2% 74.6%
- 23. Forced Outage Rate....................................... 0.0% 0.0% 6.6%
24.' Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- U2-pefueling/10 year ISI Outtage scheduled 09/07/90
- 25. If Shutdown at end of Report Period, estimated time of Startup _N/A
> 26. Units'In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 1
FG f
9 Y t I
W n., *
' AVERAGE DAILY UNIT POWER' LEVEL Docket No. - 50-339 Unitt NA-2 Date t - June 4. 1990 completed by: T. Phillies Phonet (703) 894-5151 x2774 !
i MONTH: Mav- 1990 i l
.x !
n ,f i
DAY AVERAGO DAILY POWER DAY AVERAGE DAILY LEVEL LEVEL-(MWe-Net) LEVEL (MWe-Net) 1 906 17 905 2 907 18 906 -l
~3 907 19 908 )
4 906 20 906 5 905 21 905' 6 905 22 906 ,
7 906 23 907 i
'8 908 24- 906 9
l 906- 25 888 l I 10 906 -26 907 1 11 906 27- 907- !
- 12. 907 28 907 l 13 907- 29 907 l 14 906 30 907 i
): 15 905 31 907 R
n 16 905 ,
L i t
L l l i- .!
1 r
h Instructionst
" On'this format, list the average daily unit power level in MWe-Net for=each day in the reporting month. Compute to the nearest whole megawatt.
r L.
l!
i-
ae F
~
UNIT SHUTDOWNS AND POWER REDUCTIONS ..
DOCKET NO.' -
339' UNIT NAME: NA-2 DATE: June 4,.1990 a
-REPORZ MONTH: May.1990 COMPLETED BY: "T. Phillips
" PHONE:. ..(703)894-5151 x2774 1 2 3 4 5
'No. Date Type Duration _ Reason Method of Licensee System Component Cause & Corrective' -
(hrs) Shutting Event Code Code Action to Down Reactor Report # Prevent Recurrence ONo entry this month t
le Type 2: Reason '3: Method 4:
F=Forcad A= Equipment Failure (explain) 1= Manual Exhibit'F - Instructions S=Schedulea .B= Maintenance.or Test 2= Manual Scram for preparation of Data ,
C= Refueling'. .. 3= Automatic Scram. Entry Sheets for' Licensee D= Regulatory Restriction 4= Continuations Event. Report (LER): File E= Operator Training & License-Examination 5= Load Reduction. '(NUREG-0161)'.'
F= Administrative 9=Other.
G= Operational Error ~ 5: .
H=Other'(explain) Exhibit H - Same Source
-. ~ . - . . . . . . :. . ..
i l
,;e - * %L l 1
Page 1 of __1
)
UNIT SHUTDOWN'AND POWER REDUCTIONS Explanation Sheet ,
Docket No.: 50-339 Report Nonth _ May Unit Names NA-2 i Years 1990 Date: June 4. 90- .
completed by: Todd Phillios
s 1
1 1'.
f-1 l
1
j, , .=
NORTH ANNA POWER STATION UNIT NO. 2 MONTH: May
SUMMARY
OF CPERATING EXPERIENCE ,
Listed' below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
Datt TiRR DR1R l May 01, 1990 0000 Began month with Unit at 100%, 953MW.
-May 25, 1990 0905 Commenced ramp-down to 90% power for ,
2-PT-34.3, Turbine Valve Freedom Test. l 1100 Unit stabilized at 870 MW for Turbine Valve Freedom Test. I i
1105 Completed Turbine Valve Freedom Test satisfactorily.
1305 Commenced ramp-up to 100% power.
1625 Unit stabilized at 100% power.
May 31, 1990 2400 Ended month with Unit at 100%, 955MW. !