OPERATING DATA REPORT DOCKET NO. 50-369 DATE 2-15-82 C051PLETED BY J. A. Reavis TELEP110NE 704-373-8552 OPERATING ST ATUS -

Note >

1. Unit Name: McGuire Unit 1
2. Reporting Period. Januarv, 1982
3. Licensed Thennal Power S!Wti: 3 411 1 220
4. Nameplate llating (Gross 31Wel.
5. Design Electrical Rating INet 31Wel: 1 180
6. .\tasimum Dependable Capacity (Gross 31We):
7. Masimum Dependable Capacity iNet 31Wel:

S. If Changes Occur in Capacity Ratinp titems Number 3 Thraugh 7)Since Last Report.Gise Reasons:

9. Power Le el To which Rest:icted. If Any (Net 31We):
10. Reasons For Restrictions. If Any:

This 31onth Yr..to.Date Cumulative 744.0 744.0 1 488.0

!!. Ilours In Reporting Penod 675.7 675.7 721.3

12. Number Of liours Reactor % Critical - -
13. Reactor Resene Shutdown llours
14. Ilours G. nerator On Line 667.2 667.2 712.8
15. Unit Resene Shutdown llours
16. Gross Thermal Energy Generated (31Wil) 1 273 71; 1 273 713 1 358 668 450 940 ,,, 450 940 479 376
17. Gross Electncal Energy Generated (31Wil) 424 022 424 022 443 078 IS. Net Electrical Energy Generated (S!WH)
19. Unit Senice Factor 89.7 89.7 47.9
20. Unit Availability Factor 89.7 89.7 47.9
21. Unit Capacity Factor IUsing 31DC Net t 48.3 48.3 25.2 48.3 48.3 25.2
22. Unit Capacity Factor IUsing DER Net)
23. Unit Forced Outace Rate 10.3 10.3 52.1
24. Shutdowns Scheduled Oser Nest 6 \1onths (Type.Date,and Duration of Facht:

Eddy Current Testing - February 21, 1982 - three weeks

25. If Shut Down At End Of Report l'criod. Estimated Date of Startup:
26. Unit > In Test Status (Prior to Commercul Operation): Forecast Achiesed I

INIT! \ L CRITICA LITY (

INill AL ELEClRICITY CO\lSIERCl \ L Ol'f R A flON _q W77 3 8203190394 820215 PDR ADOCK 05000369 R PDR

DOCKET NO.

50-369 ..

UNIT SilUTI) OWNS AND POWER liEDUC110NS UNIT NAh!E McGuire Unit I DATE 2-15-82 CON!PLETED llY J. A. Reavis REPORT A!ONTil Januarv. 1982 704-373-8552 TELEPilONE c_ r.

s 3u5

, E 'A Licensee 5 4

.2 e _= -r, e7 Cann > & Corrective No. Dne 3, g j jg Even 7 Q, Ation to

  • 5 diU c$5 ~ di :

e Report #

o 5' '

Prevent Recurrence C

1 82-01-01 F 31.67 A -

IIA TURBIN Concletion of generator drying and hydrogen cooler replacement.

2 82-01-03 F 9.97 A .

3 EB REIAYX An electrical switchgear problem caused a trip of the "A" FhT)T

, resulting in a LO-LO steam generator level tripoing the reactor.

3 82-01-05 F 6.83 B 3 ZZ ZZZZZ~ Reactor tripped during a periodic test due to a procedure deficiency.

4 82-01-09 F 11.67 B 3 IIA TURBIN During maintenance to the turbine controls (DEII), the turbine / generator tripped, trinping the reactor.

5 82-01-11 F 11.15 A 3 IA INSTRU Frozen instrumentation caused a reactor trip and safety injection.

I 2 3 4 17: Forced Renon: htethod: Exhibit G - Instructions S: Scheiluted A Equipment Faih.. 'Lxplain) 141anual for Preparation of Data llataintenance or Test 241anual Scram. lintry Slieets for I_icemee C-Refueling 1 Automatic Scram. Event Report (I.Elt) File iNtlRI G-D Itegulatory Restriction 4 Other (Expl.iin) 0161)

Ibope.ator Training & Lcense lixamir:ation F-Ad minist rative 5 .

G Opeiational Es tor (Explain) Eshibit I Same Souice

(')/77) 1101her (E xplain) l 8

6 4 ,

l J [ t'

DOCKET NO.

50-369 ..

UNIT SilUTDOWNS AND POWER REDUC 110NS UNIT NAM E McGuire Unit I DATE 2-15-82 RI: PORT MONTil Januarv. 1982 COMPLETED IlY J. A. Reavis TELEPilONE 704-373-8552 e.

No. Date

, 3E "h Y Licensee [-t, "t Cause & Corrective i 5g i i~s Event 3,7 93 Action to H

5: $ jdg Report a mU j' -

Prevent Itceurtence 6

1-p 82-01-14 F --

11 -- .CB lifEXQi Reduced to 50% power until an outage for further inspection and analysis of steam,gener:itor condition, 6 82-01-15 F 5.55 A 2 IA IN'STRU Operator tripped reactor on indication of "B" reactor coolant' pumn high vibration as pmcedure instructed.

2-p 82-01-15 F -- 11 --

CB IfrEXOI IIolding at 50% power until an outage for further inspection and analysis of steam generator condition.

I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A Equipment Failure (Explain) 1 -Man ual for Preparation of Data Il Maintenance of Test 2 Manual Scram. Entey Sheets for I.ieensee C Refueling .t-Automatic Scram. Esent Report (LI:Rij File INtiltEG-D Regulatory Resirietion 4-Ot her (Explain) 0101)

E-Ope ator Training 1 License Examination F Administrative 5 .

G Opeiational Eiror (Explain) Eshibit I. S.ime Source 19/77) ll Other i Explain) 5

. 1

. i g a ** A _ _ _ . . t l -

O DOCKET NO. 50-369 (Jgj7 McGuire Unit _1 2-15-82 DATE

~

AVERAGE DAILY UNIT POWER LEVEL MONTil January, 1982 AVERAGE DAILY POWER LEVEL AVERAGE D AILY l'OWER LEVEL DAY (MWe ner) ,

DAY (MWe-ne t)

- 17 503 1

183 18 638 2

613 510 19 3

525 20 510 4

491 21 510 5

944 22 sl a 6 ..

993 23 516 7 ~

~~

841 24 516 8

496 25 517 9

634 26 437 10 313 27 546 11 824 28 543 12 1 075 29 527 13 30 536 14 1 067 31 541 15 333 502 16 DAILY UNTT POWER LEVEL FOR\1 INSTRtR'TIONS On this fonn, list the averare daily unit power lesel in MWe net for each day m the reporting n.onth.

Compute to the nearest wnole megawatt.

These figures will I e useJ to plot a graph lor each reportmg month. Note..tthat by using easions whenmaximum flie daily dependable capaesty for the net electrical ratin : the of the urut there mas be restristed power lesel boe) in such c.nes, the average power leset estreds the itJ01 Ime (or average. daily unit power output sheet sliould be footnoted to t splam the app.uent anomaly.

DOCKET NO: 50-369 UNIT: McGuire Unit 1 DATE: 2-15-82 NARRATIVE

SUMMARY

MONTil: Ja r.ua ry , 1982 ,

McGuire 1 returned to service on January 2 and increased to 75% power. ~

' - ~ ~ ~ ~

A switchgear problem resulted in the loss of the unit on January 3.

It was returned to service the following day and increased in power to 90% for teating.

On January 5, a procedure deficiency caused a reactor trip during a periodic test. The unit was returned to 90% power the same day and testing continued. Following completion of testing at 90%, power was reduced to 75% on January 7, to await confirmation of a procedure change before escalating to 100% power.

Another trip of the unit occured on January 9 while maintenance was in progress on the turbine control (Dell) system. It was returned to 75%

power on January 10. Freezing instrumentation lines resulte,d in a recator trip on January 11. It was returned to service the same day.

The reactor was increased to 100% power on January 13, for a twenty four (24) hour period. Power was then reduced to 50% until an outage for further inspection and analysis of the steam generator condition.

.i By procedural instructions, the reactor was manually tripped on January 15, due to an indicated high vibration on one of the reactor coolant pumps.

The indication was false and the unit was returned to the 50% power level within a few hours.

Increased to 75% power on January 18, to meet system demand. After peak the unit was reduced to 50% power and continued at this level the remainder of the month.

t

.a

MONTHI.Y REFUEIANG INFORMATION REQUEST

1. Facility name: McGuire Unit 1 _
2. Scheduled next refueling shutdcun: June, 1983 _
3. Scheduled restart following refueling: .
4. W115 refueling or resumption of operation thercafter require a technical. .___,_

specification change or other license amendeent? .

If yes, what will thes'c be?

If no, has reload design and core configuration been reviewed by Safety Review Co=mittee regarding unreviewed safety questions? .

If no, when is review scheduled? .

5. Scheduled date(s) for submitting proposed licensing action and supporting ,,

inf o rma tion: .

6. I=portant licensing considerations (new or different design or supplict, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7. Number of fuel assemblies (a) in the core: 193 ,

(b) in the spent fuel pool: 20 .

8. Present licensed fuel pool capacity: 500 _.

Size of requested or planned increase: .

9. Projected date of last refueling which can be accoccodated by present licensed capacity: .

\

DUKE Pb'JER COMPANY Date: February, 1982 . .

Name of

Contact:

J. A. Reavis .

McGUIRE NUCLEAR STATION Operating Status Report

1. Perionnel Exposure - . - , - - ,

For the month of December, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

2. The total station liquid release contribution to whole body dose for December has been compared with the Technical Specifications annual value of 3 mrem; the total release for December was less than 10 percent of this limit.

The total station gaseous release contribution to any organ dose for December has been compared with the derived Technical Specifications annual value of 15 mrem; the total release for December was less than 10 percent of this limit. ,

. y

  • .a

CORRECTED COPY OPERATING DATA REPORT DOCKET NO. 50-369 l

DATE 2-15-82 C051PLETED BY J. A. Reavis TELEPilONE 704-373-8552 OPERATING STATUS .~

Notes

1. Unit Name: McGuire Unit 1
2. Reporting Period: December, 1981
3. Licensed Thennal Power (Sthti: 3 411
4. Nameplate Rating (Gross SIWel.

1 220

5. Design Electrical Ratin: tNet alwel: 1 180
6. Stasimum Dependable Capacity LGross >!We):
7. 51asimum Dependable Capacity (Net Slhe): 820 S. If Changes Occur in Capacity Ratinp tilems Number 3 Through 7)Since Last Report. Gise Reasons:
9. Power' Level To Whwh Restricted. lf Any t' Net 31We):
10. Reasons For Restrictions. If Any:

'^

This alonth Yr..to.Date Cumulative

!!. Iloursin Reporting Period 744.0 744.0 744.0

12. Number Of liours Reactor was Critical 45.7 45.7 _

45.7

13. Reactor Resene Shutdown flours
14. Ilours Generator On.Line 45.7 45.7 45.7
15. Unit Resene Shutdown flours ~
16. Gross Thermal Energy Generated (>lWil) 84 955 84 955 84 955' .
17. Gross Electrical Energy Generated (>lWil) 28 436 _,

28 436 28 436 IS. Net Electrical Energy Generated (SIWil) 19 056 19 056 19 056

19. Unit Service Factor 6.1 6.1 6.1
20. Unit Asailability Factor 6.1 6.1 6.1
21. Unit Capacity Factor (Using SIDC Neti 2.2 2.2 2.2
22. Unit Capacity Factor (Using DER Net) 2.2 2.2 2.2
23. Unit Forced Outage Rate 93.9 93.9 93.9
24. Shutdowns Scheduled Oser Nest 6 \lonths (Type.Date.and Duration of Facht:

Bearing Inspection S/G Eddy Current Testing to February is shutdown

_Online March 7, 1982

25. If Shut Down At End Of Report Period. Estimated Date of Startup: January 2, 1982
26. Units In Test Status (Prior to Commercial Operation): Forecast Achiesed

. INITI AL CRITICA!.lTY .

k INITIAL ELEC1RICITY COstNIERCI A L Ol'LR A flON _,

(0/771

_ _ - _ . _ _ _ - _ _ ]

CORRECTED COPY '

50-369 -

UNITSilUTUOWNS A: D POWER REDUCllONS DOCKET NO.

UNI T NAME McGuire Unit 1*

pag t 2-15-82 COMPLETED HY J. A. Reavis REPORT A!ONTil December. 1981 704-373-8552 TELEPIIONE i

= c.

, .5 ? 3' .$ .E 5 Licensee Eg **

go Cause & Coirective No. Date 5? is& Event i i g7 c- 1 Action to jE c) j gf; g Report u viv 8' Prevent Reentrence O

  • 1-p 81-12-01 S --

B --

ZZ ZZZZZZ Holding at 75% power for poker escalation testing.

1 81-12-02 F .33 B 3 ZZ ZZZZZZ During shutdown to cddy current steam generator tubes, t-he unit tripped .

while performing a loss of offsite power test. ,

2 81-12-02 F 218.00 B --

CB ITTEXCH Eddy current of selected tubes in the "A" steam generator.

3 81-12-12 F 480.00' A --

HA 'IURBIN Extension to steam generator outage for replacement of electrical generator hydrogen cooler.

'l 2 3 4 F: Forced Reason: Method: Exhibit G. Instrucatons S: Scheduled 'A Equipment Failure (Explain) I Manual fin Preparation of Data 11-Maintenance of Test 241anual Seram. Entry Sheets for 1.ieensee C-Refueling -

1 Automatic Scram. Event Report (LER) Fde (NilREG-D Itegulatory Restriction 4 Other (Explain) 01bl)

E-Ope.ator Training & License Examination 2

' F Administrative S G Opeiational Error (Explain) Eshibit I Same Somce (9/77) iI Other (Explain) -

a .a MJett t' I