Responds to NRC 821006 Ltr Re Violations Noted in IE Insp Rept 50-354/82-11.Corrective actions:step-off Pad Consisting of Clear Plastic Mat Covering Entire Clean Area at Point of Entry Installed & Full Compliance Noted on 820915
ML20028B239
Person / Time
Site: Hope Creek PSEG icon.png
Issue date: 11/24/1982
From: Martin T
Public Service Enterprise Group
To: Haynes R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML20028B236 List:
References
NUDOCS 8211300197
Download: ML20028B239 (2)


Text

i d e.-

> s'

/

mmes J. Mwtin Public Service Electric and Gas Company 80 Park Plaza Newark, NJ. 07101 201/4306316 Vice President -

Engineering and Construction Mr. Ronald C. Haynes, Administrator U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

Dear Mr. Ilaynes:

NRC INSPECTION REPORT 50-354/82-11 NO. 1 UNIT llOPE CREEK GENERATING STATION Your letter dated October 6, 1982, transmitted the above referenced Inspection Report which contained a Notice of Violation citing one item of noncompliance. The following response is provided in accordance with the Notice of l Violation.

As of September 8, 1982, a step-off pad was not in use at the entrance point of the Reactor Pressure Vessel (RPV) as required j

by General Electric I&SE Specification 160A01203.

Corrective Steps Taken and Results Achieved i

4 j The change room, at the entrance point of the RPV, has been effectively divided with a bench placed crosswise so r. hat personnel will put on or remove shoe covers prior to entering or leaving the clean area. Located on the RPV side of the bench is a step-off pad consisting of a clear plastic mat that covers the entire clean area at the point of entrance.

Instructions for personnel entering the vessel have been prominently posted in the area. , ,

, v ij

_ _ . - . . . . . . . - --~-- m ?-

_,82113001877 IB21124 - ~' l PDR ADOCK 05000354 G PDR.

4 ..~

R. C. Haynes 2 Corrective Steps Taken To Preclude Recurrence On September 15, 1982, General Electric I&SE conducted and documented training sessions in which the requirements of Specification 160A01203 were reviewed with supervisory and craft personnel. The training

> sessions included specific instructions in the use of a step-off pad in accordance with Paragraph 8.2.6 of the specification.

Date Of Full Compliance P

The date of full compliance was September 15, 1982.

Very truly yours, i i r

I

cc
Office of .nspection and Enforcement t Division of Reactor Construction - Inspection Washington, D. C.