ML20028A502

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1982
ML20028A502
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 11/15/1982
From: Reavis J
DUKE POWER CO.
To:
Shared Package
ML20028A495 List:
References
NUDOCS 8211220235
Download: ML20028A502 (6)


Text

_ _ ,

OPERATING DATA REPORT DOCKET NO. _50-369 DATE _l.1-15 CO.\lPLETED BY .J. A. Reavis TELEPilONE 704-373-7433 OPERATING STATUS McGuire Unit 1 Note > *f10TE : flameplate Rating

1. Unit Name:

l om, (Gross MWe) calculated as

2. Reporting Period: Octnhor 1. 1 QR7 nc te,hnv. 11 ' ---

1450.000 MVA x .90 power 3411

3. Licensed Theruul Power t5thsi: factor per Page iii,
4. Nameplate itatmg (Grow 31We):

1305* fiUREG-0020.

5. Desien Electrical nating iNet 31Wei: 1180
6. 313ximum Dependable Capacity (Grow 31We):
7. Masimum Dependable capacity (Net .\tWe): 1180 S. If Changes Occur in Capacity Rating litems Number 3 Through 7)Since Last Report.Give Reasons:

None None

9. Power Level To Which Restricted.lf Any (Net MWe):
10. Reasons For Restrictions. lf Any:

This Month Yr..to.Date Cumulative i1. Ilours In Reportine Period 745.0 7296.0 8040.0

12. Number Of liour[ Reactor was Critical __ 729.5 6038.3 6084.0
13. Ileactor Resene Shutdown llours
14. Ilours Generator On.Line 728.0 5997.7 6043.3
15. Unit Resene Shutdown flours
16. Gross Thermal Energy Generated (31Wil) 1 338 949 11 623 747 11 708 702 -
17. Gross Electrical Energy Generated (31Wil) 461 89_2 _,

3 983 587 4 012 023 IS. Net Electrical Energy Generated (31Wii) 432 639 3 733 708 3 752 764

19. Unit Semce Factor .

97.7 82.2 75.2

20. Unit Asailability Factor 97.7 82.2 75.2
21. Unit Capacity Factor (thing SIDC Neti 49.2 43.4 39.6
22. Umt Capacity Factor (Using DER Net) 49.2 43.4 39.6 2.3 17.8 24.8
23. Unit Forced Outace Rate
21. Shutdowns Scheduled Oser Nest 6 Stonths (Type. Date.and Duration of Each t:

Eddy Current Testing - November 5 - 2 Weeks

25. If Shut Down At End Of Repori Ptrind. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercul Operation): Forecast Achiesed INITl \ L CRITICA LlTY INll l A l.1 L111 R ICI T Y CO\l\ll.RCI A L Ol'I'.it A flON 8211220235 821115 PDR ADOCK 05000369 P1/771 R PDR

DOCKET NO. 50-369 UNIT McGuire 1 DATE 11-15-82 AVERAGE DAILY UNIT POWER LEVEL MONTil October, 1982 AVERAGE DAILY POWER LEVEL AVERAGE D AILY POWER LEVEL DAY (MWe-net) DAY (Mwe. net) ,

549 17 548 1

551 18 684 2

551 549 3 19 774 549 4 m 867 550 5 21 865 551 ,

6 22 .

864 412 7 23 108 8 24 547 25 498 9

546 552 10 26 548 27 553 11 548 555 12 28 555 13 29 548 30 555 14 545 554 15 31 549 1S DAILY UNrr POWER LEVEL FOR\1 INSTRtR~TIONS On this fonn, hst the averare daily umt power lesel in MWe net for e.:ch day in the reporting n.onth.

Compute to the nearest wnote megawatt.

Thesc Ogures will l e used to plot a graph I'or caeh reporting month. Note that by umi maximum

.t easions when the daily dependable capacity f or the net electrical rating of the unit theri; may be average power levet enceth the 1001 ime f or the restricted power lesel huel. In such c.ises the average daily unit power output sheet should be footnoted to (splain the appasent anomaly.

50-369 UNIT SilUTDOWNS ANI)I'OWEit if EDUCTIONS DOCKET NO. -

UNIT NAME l'1cGuire 1 DATE 11/15/82 itE!,OitT MONTil October, 1982 COMPLETED BY J. A. Reavis TELEPl!ONE 704-373-7433

= r. ,, 3 5

-, .2 _e s '.s _

., .s 'A Licensee c't e% Cause & Contretive

]

N' ' - D He r-5? $ 2s5 Event u?

ifi0 h Action to c3 5 $ jdg Report r

}O Prevent Iteentrence 6

14-P 82/10/01 F --

H --

CB HTEXCH Operation at 75% power completed by 10/18. Unit operated at 50% power remainder of month.

19 82/10/23 F 16.97 H 1 SB XXXXXX Shutdown unit to install spray system to assist the lower containment vent-ilation system maintain temperature.

I 2 .1 4 F: Finced Itcamn: Metimd: Exhibit C -lintructions S. Scheduled A l'iluipment Failure (Explain) 1 Manual for Picparatant of Data II. Maintenance of Test 241.moal Scram. 1.ntry Sheets sin I.ieemec C itefocling -

1 Autem.itic Sciam, lisent luport (1.liR) File INLIRI.G-D Itegulatory iteststerion -I Other (!!xplain) 01611 E Ope.utor Training 11.icense Examination F-Administrative S G Opeiational !istor (lixplain) Ihlutni 1 - Sanie Somee P)/77) Il Other (lixplaisil t

N.

MONTHLY REFUELING INFORMATION REQbTST

1. Facility name: McGuire Unit 1 .
2. Scheduled next refueling shutdown: January, 1984 .
3. Scheduled restart following refueling: .
4. Will refueling or resumption of operation thereaf ter require a technical specification change or other license amendment? N/A .

If yes, what will these be? ,,,

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A .

5. Scheduled date(s) for submitting proposed licensing action and supporting information: N/A .
6. Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures). N/A
7. Number of fuel assemblies (a) in the core: 193 ,

(b) in the spent fuel pool: 27 .

8. Present licensed fuel pool capacity: 500 .

Size of requested or planned increase: .

9. Projected date of last refueling which can be accommodated by present licensed capacity: .

DUKE POWER COMPANY Date: November 15, 1982 .

Name of

Contact:

J. A. Reavis Phone: 704-373-7433 4

m _ __ _ _ _ . _ . , _ _. , _ . _ , , _ , . . , . . . _ , -.. . , , , , _ ,

.=. . _ ... .. -

DOCKET NO: 50-369 UNIT: McGuire 1 DATE: 11/15/82 NARRATIVE SUM 1ARY lionth: October, 1982 McGuire l entered the month at 50% power. Up to 'l23 hours between 50% and

, 75% power remained, at that time. This time was utilized from October 4 to 2

October 8, and on October 18. The remainder of the month power was limited to 50%.

I Saturday, October 23, the unit shutdown to install a spray system to assist the lower containment ventilation system in maintaining lower containment temperature.

The unit returned to service October 24.

McGuire l ended the month at 50% power and will be limited to that level until further analysis of the steam generator is complete.

j _..

,, .. i 1

McGUIRE NUCLEAR STATION l Operating Status Report

1. Personnel Exposure 1

For the month of September, no individual (s) exceeded 10 percent of their allowable annual radiation dose limit.

i 2. The total station liquid release contrictulon to whole body dose for September has been compared with the Technical Specifications annual I value of 3 mrem; the total release for September was less than 10 percent

, of this limit.

! The total station gaseous release contribution to any organ dose for September has been compared with the derived Technical Specifications j annual value of 15 mrem; the total release for September was less than i 10 percent of this limit.

l 4

i i

l l

i i

l l

l l

l 1

i i

- - - - - . , , , . . - - - . - _ _ . . . . . _ , . - , -. _ . - - - - - . - - . . , , . . - _ _ - - . , . - , - - _ . .- - . . . . - _ - , , - - . - . _ _ - ,,