MONTHYEARML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 ML20203F3531997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for North Anna Power Station,Units 1 & 2 ML20199C6871997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for North Anna Power Station,Units 1 & 2 ML20217H9201997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for North Anna Power Station,Units 1 & 2 ML20216H9141997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for North Anna Power Station,Units 1 & 2 ML20210K5501997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for North Anna Power Station,Units 1 & 2 ML20210K5581997-06-30030 June 1997 Revised Monthly Operating Rept for June 1997 for North Anna Power Station,Units 1,correcting Error Found on Shutdowns & Power Reductions Summary ML20140E5371997-05-31031 May 1997 Monthly Operating Repts for May 1997 for North Anna Power Station Units 1 & 2 ML20148B3771997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20141E2681997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for North Anna Power Station Units 1 & 2 ML20140D7551997-03-31031 March 1997 Monthly Operating Repts for North Anna Power Station,Units 1 & 2 ML20135F3111997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for North Anna Power Station,Units 1 & 2 ML20134H2961997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for North Anna Power Station Units 1 & 2 ML20133G5291996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for North Anna Power Station Units 1 & 2 ML20135E4961996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for North Anna Power Station Units 1 & 2 ML20134K5811996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for North Anna Power Station Unit 1 & 2 ML20128N1301996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for North Anna Power Station Unit 1 & 2 ML20117M0781996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for North Anna Power Station Units 1 & 2 ML20116J6431996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for North Anna Power Station Units 1 & 2 ML20115G2341996-06-30030 June 1996 Monthly Operating Repts for June 1996 for North Anna Power Station Units 1 & 2 ML20117M1811996-05-31031 May 1996 Monthly Operating Rept for May 1996 for North Anna 1 ML20117E7501996-04-30030 April 1996 Monthly Operating Rept for Apr 1996 for North Anna Power Station Units 1 & 2 ML20107C2951996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for North Anna Power Station Units 1 & 2 ML20106H0631996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for NAPS ML20097D5661996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for North Anna Power Station Units 1 & 2 ML20096C3041995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for North Anna Power Station,Units 1 & 2 ML20095D8611995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for North Anna Power Station ML20094H3601995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for North Anna Power Station ML20093D8781995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for North Anna Power Station Units 1 & 2 ML20092F5571995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for North Anna Power Station 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20197G8551998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for North Anna Power Station,Units 1 & 2.With ML20196G1381998-11-0303 November 1998 Safety Evaluation Authorizing Rev to Relief Request NDE-32 for Remainder of Second 10-yr Insp Interval for Each Unit ML20195D0571998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for North Anna Power Station,Units 1 & 2.With ML20154L0691998-10-14014 October 1998 COLR for North Anna Power Station Unit 1 Cycle 14 Pattern Xy ML20155J6911998-10-0909 October 1998 Staff Response to Tasking Memorandum & Stakeholder Concerns ML20154H4001998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for North Anna Power Station,Units 1 & 2.With ML20151X8011998-09-10010 September 1998 Special Rept:On 980622,groundwater Level at Piezometer P-22 Was Again Noted to Be Above Max Water Level by 0.71 Feet. Increased Frequency of Piezometer Monitoring & Installed Addl Piezometers at Toe of Slope Along Southwest Section ML20151W4711998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for North Anna Power Station Units 1 & 2.With ML20237A4341998-07-31031 July 1998 Monthly Operating Repts for July 1998 for North Anna Power Station,Units 1 & 2 ML20236V1251998-07-14014 July 1998 ISI Summary Rept for Naps,Unit 2,1998 Refueling Outage Owners Rept of Isis ML20236K5531998-07-0707 July 1998 SER Accepting Request for Change in ISI Commitment on Protection Against Pipe Breaks Outside Containment ML20236M3381998-06-30030 June 1998 Monthly Operating Repts for June 1998 for North Anna Power Station,Units 1 & 2 ML20248M1011998-05-31031 May 1998 Monthly Operating Repts for May 1998 for North Anna Power Station,Units 1 & 2 ML20248C8831998-05-29029 May 1998 SER Accepting Alternatives Proposed by Licensee for Use of Code Case N-535,pursuant to 10CFRa(a)(3)(i) in ASME Section XI Inservice Insp Program ML20247K9281998-05-15015 May 1998 Special Rept:On 980428,letdown PCV Exhibited Slow Response When C RCP Was Started.Cause to Be Determined.Review of Operating Procedure Will Be Performed to Determine If Enhancements Are Necessary ML20216A8971998-05-0606 May 1998 Rev 0 to Cycle 13 Pattern Ud COLR for North Anna Unit 2 ML20247F4441998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for North Anna Power Station,Units 1 & 2 ML20217B5321998-04-20020 April 1998 Safety Evaluation Supporting Proposed Alternative to ASME Code for Surface Exam of Seal Welds on Threaded Caps for Plant Reactor Vessel Head Penetrations for part-length CRDMs ML20217H9611998-04-0707 April 1998 Special Rept:On 980216,groundwater Level at Piezometer P-22, Again Noted to Be Above Max Water Level by 0.41 Feet.Design Package for Installation of Addl Standpipe Piezometers at Toe of Slope Southeast Section,Developed ML20216B1891998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for North Anna Power Station,Units 1 & 2 ML20216E8801998-03-0606 March 1998 Safety Evaluation Authorizing Licensee Request for Relief from ASME Code Requirements,Paragraph IWA-2400(c) (Summer Edition W/Summer 1983 Addenda),For Upcoming Naps,Unit 1 Outage,Per 10CFR50.55a(a)(3)(ii) ML20216E2561998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for North Anna Power Station,Units 1 & 2 ML20199J6431998-02-0202 February 1998 Safety Evaluation Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 SW Piping for North Anna,Unit 1,as Submitted in ISI Relief Request NDE-46 on 971218 ML20202D5811998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for North Anna Power Station,Units 1 & 2 ML20198S7571998-01-15015 January 1998 Safety Evaluation Accepting Licensee Request for Approval to Repair Flaws IAW GL-90-05 for ASME Code Class 3 Svc Water Piping ML20198P1351997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for North Anna Power Station,Units 1 & 2 1999-09-08
[Table view] |
Text
.
Y1RGINIA EttcTunc AND Pows:n COMPANY RICHMOND, VIRGINIA 23261 December 14, 1989 U. S. Nuclear Regulatory Commission Serial No. 89 847 Attention: Document Control Desk NO/JMJ:jmj Washington, D.C. 20555 Docket Nos. 50-338 50 339 License Nos. NPF-4 NPF-7 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for North Anna Power Station Units 1 and 2 for the month of November 1989.
Very truly yours,
(
W. L. Stewart Senior Vice President - Nuclear Enclosures cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, NW Suite 2900 Atlanta, GA 30323 Mr. J. L. Caldwell l
NRC Senior Resident inspector North Anna Power Station {
i
- 'l i g 22 gg{f $$hi g8 l R
, js .. -
. i i
1 l
l I
VIRGINIA POWER COMPANY 1
NORTH ANNA POWER STATION ,
f
.Molmit.Y OPERATINC REPORT ,
i
)
1989 MONTH NOVEMBER TEAR
\
i l
APPROVED:
_ N v
cynycy l
l
,v .
%,,'.e -,
e '
F .-
"" t m
OPERATING DATA REPORT DOCKET No. 50-338
- _ DATE 12-06-89 COMPLETED BY Bob T111ack ;
F TELEPHONE (703) 894-5151 X2632 V i J, OPERATING STATUS ;
, 1. Unit Namet North Anna 1 -
L 2. Reporting Period NOVEMBER 1989 h L3. Licensed Thermal Power (MWt): 2893 C 4.- Nameplate Rating (Gross MWe): 947 :
[ L5. ' Design Electrical Rating (Net MWe): '
907 _
t-
- 6. Maximum Dependable Capacity (Gross LA'e): 963 ,
, 7. ' Maximum Dependable Capacity (Net MWe): 915 f 18.' .If Changes occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report',
Cive Reasonst N/A 9.- Power Level To Which Restricted. If Any (Net MWe): N/A ,
.10. Reasons For Restrictions, If Any N/A _
t This Month Yr.-to-Date- Cumulative 'i
- 11. .!!ours_In Reporting Period ,
720 8,016 100,308 12.' Number of Ilours Reactor k'as Critical 720 4,639.4 .
~~
70,858.8
- 13. Reactor Reserve Shutdown Hours 0 94.8 6.552.1 !
'14. Hours Generator On-Line 720 4,601.8 68,116.3
- 15. '. Unit Reserve Shutdown llours 0 0 __ 0 216 Gross Thermal Energy Generated (MWU) 2,064,616 12,720,657 180,880,650
- 17. Cross Electrical Energy., Generated (MWH) 681,200 4,200,161 59,374,510-18 '. Net Electrical Energy Generated (MWH) 648,771 3,987 787 56,179,679
-19. Unit Service Factor 100 57.4 67.9 20.' Unit Availability Factor 100 57.4 67.9
.21. Unit Capacity Factor'(Using MDC Net) 98.5 54.4 62.7
.22. Unit Capacity Factor (Using DER Net) 99.4 54.8 61.8 r l =23. Unit-Forced Outage Rate 0 _
3.8 14.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
l Maintenance / Snubbers, 02-29-90, 25 Days
, n ;
25.' If Shut Down At End Of Report Period, Estimated Date of Startup:
- 26. ' Units In Test Status (Prior to Commercial Operation): '
Forecast Achieved INITIAL CRITICALITY ~
INITIAL ELECTRICITY COMMERCIAL OPERATION I
_ _ _ < _ o.
.- i AVERACE DAILY UNIT POWER LEVEL i
DOCKET NO. 50-338 UNIT NA-1 DATE 12-06-89 COMPLETED BY Bob Tillack i TELEPl!ONE 703-894-5151X2632 HONTil November 1989 e DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 910 17 911 ,
2 910 18 911 3 911 19 911 4 911 20 904 5 911 21 893 6 911 22 888 i 7 911 23 889 6 911 24 889 9 911 25 890 10 911 26 891 11 892 27 889 _
12 911 28 890 13 855 _
29 890 14 910 30 888 -
15 911 31 16 912 INSTRUCTIONS On this format. list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
UNIT SHUTDOWRS AND POIER REDUCTIONS DOCKEY RO. 50-338 UTIT NAME North Anna 1 DATE 12-06-89 REPORT MON 111 NOVEMBER 1989 COMPLETED BT Bob T111ack TELEPHONE (703) 894-5151 12632 1 2 No. Date Type Duration Reason- Method of Licensee System Component Cause and Corrective (Hours) Shutting Emt M Ne * **
3 4 5 Down Reactor Report i Prevent Recurrence NO ENTRY THIS MONTH 1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scran Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-Ol61)
E-Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source O
--_,-,,a- , - - - - . - _n- .x-
- , .m; -- - - , - -
Page 1 of 1 UNIT SHUTDOWN AND POWER REDUCTIONS EIPIANATION SHEET DOCKET NO. _ , 50-338 REPORT MONTH NOVEMBER UNIT NAME NA-1 YEAR 1989 DATE _ 12-06-89 COMPl.ETED BY Bob Tillack NO ENTRY THIS MONTl!
I
,gr., r 4 .
NORTil ANNA POWER STATION UNIT NO. 1 M0lmi NOVEMBER
SUMMARY
OF OPERATING EKPERIENCE Listed below in chronological sequence is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
DATE TIME DATA November 1, 1989 0000 Began the month with Unit at 960 MW - 100%
power.
November 11, 1989 0244 #4 Covernor Valve cyc1fng.
0312 Commencing rampdown to shut #4 Governor Valve.
0402 #4 Goveinor Valve shut. Secured ramp at 91%
, power, 874 MW.
0622 Replaced f4 Governor M000 valve, commencing ramp up to 100% power, 960 MW. ,
0715 Unit stabilized at 100% power, 960 MW.
1113 #4 Covernor Valve cyc1dng 1130 Ramping down to close f4 Governor Valve.
1230 #4 Covernor Valve closed, unit stabilized at 89% power, 854 MW.
1345 Instrument Department tightened screws on #4 Governor Valve LVDT. Commencing rampup to 100%, 960 MW.
1449 Unit stabilized at 100% power, 960 MW.
)
p y, m ,
1:t. ; r%: %. s) .,
+- * ,
Yll ' L.
- a November'13, 1989 =0916: Commencing ~rampdown to 90% power, 860 MW-due to low EHC pressure (1730 psig).
1005 Unit stabilized at 91%: power, 879 MW.
Commenced testing / trouble shooting EHC
-system and Covernor Valves.
nL 1455 Completed Turbine Valve Freedom Test satisfactory.
2147: Commenced rampup to'100% power, 960 MW.
'2400 Unit stabilized at 99.5% power. 953 MW.
November 20. 1989 0910- Commenced Tave reduction IAW Design Change 89-15-3.
1928- .Tave at 580.8'F, Rx power 98.7% 937 MW, pending safety analysis review of Tavg.
Maintaining f4 Governor Valve at 32% on valve limiter.
November. 31, 1989 0257 f4 Governor Valve came wide open, electrical:
, load increased 15 MW, EHC System indicated
- 4 Governor Velve on the limiter, lowered limiter until #4 Governor Valve at 30%. Rx power stabilized 98%, 934 MW.
2400 Ended month with Unit at 98%' power, 935 MW.
Continuing to investigate and troubleshoot EHC System.
m h
2
-?. e i
OPERATING DATA REPORT DOCKET NO. 50-339 DATE 12-06-89 COMPLETED BY Bob Tillack TELEP110NE (703) 894-5151 X2632 OPERATING STATUS
- 1. Unit Name North Anna 2 Reporting Period:
2, NOVEMBER 1989
- 3. Licensed Thermal Power (MWt): 2893 4 Nameplate Rating (Gross MWe): 947
- 5. Design Electrical Rating (Net MWe): 907
- 6. Maximum Dependable Capacity (Gross MWe): 963
- 7. Maximum Dependable Capacity (Net MWe): 915 8, If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons:
N/A 9, Power Level To Which Restricted, If Any (Net MWe): N/A 10.. Reasons For Restrictions If Any: N/A This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720 ~~
8016 78,576 12.' Number of Ilours Ronctor Was Critical 720 6174.9 63,378.1
- 13. Ecuctor Reserve Shutdown Hours 0 152.8 5,854.9
- 14. Hours Cencrator On-Line 720 6143.7 62,507.9
- 15. Unit Reserve Shutdown 11ours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 2,081.696 16,653,235'~~ 165,994.234 17, Gross Electrical Energy Generated (MWil) 687.140 5,503.922 54,295.551
- 18. Net Electrical Energy Cencrated (MWil) 654,679 5,220.169 52,162.492
- 19. Unit Service factor 100 ~
76.6 79.6
- 20. Unit Availability Tactor 100 76.6 79.6 21; Unit Capacity Tactor (Using MDC Net) 99.4 71.2 74.0
- 22. Unit Capacity Factor (Using DER Net) 100.3 71.8 73.2
-23. Unit Forced Outage Rate 0 0 7.2
- 24. Shatdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved 1NITIAL CKlTICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION
~n
. s 4
AVERAGE DAILY UNIT POWER LEVEL DOCKET No. 50-339 UNIT NA-2 DATE 12-06-89 COMPLETED BY Bob Tillack TELEP110NE 703-894-5151X2632 MONTH NOVEMBER 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAG' f '1LY POWER LEVEL (MWe-Net) n'e-Ne t )
1 909 17 893 2 907 18 911 3 896 19 911 4 909 20 911 5 909- 21 912 6 _ _
909 22 911 7: 909 23 911 8 909 24 911 _
9 908 25 911 10 910 26 912 11 911 27 911 12 911 28 911 13 911 29 912 14 910 30 911 15 910 31 16 910
' i INSTRUCTIONS On this format, list the average daily unit power IcVel in MWe-Net for each dey in the reporting month. Compute to the nearest whole megawatt.
UNIT SRUTDOWNS AND PUWER REDUCTIONS DOMET NO. 50-339 UNIT NAME North Anne 2 DATE 12-06-89 REPORT MONTH NOVEMBER 1989 COMPLETED BT Beh 7111acit TELEPHONE (703) 894-515I K2632 No. Date Type Duration Reason Method of Licensee Systen Component Cause and Corrective (Hours) Shutting Emt M % #**I** **
3 4 5 Down Reactor Report i Prevent Recurrence NO ENTRY THIS MONTH I 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scran. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)
E-Operator Training / License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) 5 H-Other (Explain) Exhibit H - Same Source O
4
.w-. .--
w:-
. S.
,- a
\
t Page 1 of 1 IINIT SNUTDOWN AND POWER REDUCTIONS EXPLAMATION SHEET DOCKET No. 50-339 REPORT MONTH NOVEMBER UNIT MAME NA-2 YEAR 1989 DATE 12-06-89 COMP 1.ETED BY Bob Tillack NO ENTRY TilIS MONTil
{
l-l l.
l l
l?_
i i
NORTH ANNA POWER STATION P
h UNIT NO. 2 MONTH NOVENBER i
SUMMARY
OF OPERATING EXPERIENCE Listed below in chronological sequence in a summary of operating experiences for this month which required load reductions or resulted in '
significant non-load related incidento.
DATE TIME DATA November 1, 1969 0000 Began Month with Unit at 952 MW - 100%
power.
November 2, 1989 0118 Secured liigh Pressure lleater. Drain pump 1A for maintenance on associated IIP lleater ^
Drain Tank, Unit lost 15 MW.
November 3, 1989 1509 Maintenance complete started llP lleater Drain pump 1A. Unit regained 15 MW.
November 17, 1989 1137 Cotimence rampdown to 860 MW, 90% power for Turbine Valve Freedom Test.
1222 Unit stabilized at 89% power, 857 MW.
1330 Completed Turbine Valve Freedom Test satisfactorily.
1441 Commence rampup to 100% power.
1730 Unit stable at 100% power, 953 MW.
November 30, 1989 7400 Ended month with unit at 100% power, 950 MW.