/~N,

-] -

VIRGINIA ELECTRIC AND POWER COMPA?iY NORTH AtitlA POWER STATION MONTHLY OPERATING REPORT N0tlTH .1,m n YEAR m (Revised 7-28-80)

SUBMITTED:

Sz b -

  1. 1Ji.

SUPERIrliEp5ENT - OPERATI0 tis ()

APPROVED:

ji i STATION MANAGER d 800805003)

k OPERATING DATA REPORT DOCKET NO. 50-338 DATE 7-28-80 COMPLETED BY W H IladIS00 '

TELEPHONE T70M R94-5151 OPERATING STATUS Notes

1. Unit Name: North Anna Unit 1
2. Reporting Feriod: June 1980 (Revised)
3. Licensed Thermal Power (MWt):

2775 ,

4. Nameplate Rating (Gross MWe): 947 '
5. Design Electrical Rating (Nei MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 880
7. Maximum Dependable Capacity (Net MWe): 850
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Item 6 was chanced from 928 to 880 and item 7 was changad frnm 909 tn RRO Thn chances reflect the present unit canability.

9. Power Level To Which Restricted,If Anv (Net MWe): N/A
10. Reasons For Restrictions,1f Any: N/A

\

This Month Yr to.Date Cumulative

!!. Hours In Reporting Period 720 4,367 18,144

12. Number Of Hours Reactor Was Critic.! 634.8 3,494.6 _

13.659.8

13. Reactor Reserve Shutdown Hours 10.9 52.8 201.1
14. Hours Generator On.Line 598.9 3,301.9 13.355.1
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) l.298,756 8,163,833 34,443,746
17. Gross Electrical Energy Generated (MWH) 398.AR7 _.
2. eda 319 in Rod f;97
18. Net Elec:rical Energy Generated (MWH) 370.F23 2.392.496 in 945 047'
19. Unit Service Factor 83.2 75.6 73.6
20. Umt Availability Factor 83.2 75.6 73.6 60,6 64.4' 66.4
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 66.8 _

60.4 62.3

23. Unit Forced Outa;s Rate 16,8 13.9 7.4
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each): .'

Refuelino; six weeks; December 1980 and January 1981

25. If Shur Down At End Of Report Period. Estimated Date of Startup: N/A
26. Units in Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

("/77)