Category:CORRESPONDENCE-LETTERS
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 ML20217J4971999-10-18018 October 1999 Requests Addl Info Re Results of Util Most Recent Steam Generator Insp at ANO-2 & Util Methodology Used to Predict Future Performance of SG Tubes ML20217J3871999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through SG, Rev 0 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs ML20217J3601999-10-15015 October 1999 Informs That Topical Rept BAW-10235P, Management Program for Volumetric Outer Diameter Integranular Attack in Tubesheets of Once-Through SG, Rev 1 Marked as Proprietary Will Be Withheld from Public Disclosure 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp ML20217D1721999-10-0808 October 1999 Forwards RAI Re 990729 Request for Amend to TSs Allowing Special SG Insp for Plant,Unit 2.Questions Re Proposed Insp Scope for Axial Cracking Degradation in Eggcrate Support Region Submitted.Response Requested by 991015 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included ML20212L0621999-10-0101 October 1999 Forwards Safety Evaluation & Exemption from Certain Requirements of 10CFR50,App R,Section III.G.2, Fire Protection of Safe Shutdown Capability 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR ML20212F5031999-09-22022 September 1999 Forwards SER Granting Relief Requests 1-98-001 & 1-98-002 Which Would Require Design Mods to Comply with Code Requirements,Which Would Impose Significant Burden Pursuant to 10CFR50.55a(g)(6)(i) 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments ML20212D9961999-09-16016 September 1999 Informs That on 990818,NRC Completed Midcycle PPR of Arkansas Nuclear One.Nrc Plan to Conduct Core Insps at Facility Over Next 7 Months.Details of Insp Plan Through March 2000 Encl 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211L4901999-09-0101 September 1999 Forwards Insp Repts 50-313/99-12 & 50-368/99-12 on 990711- 0821.No Violations Noted ML20211J2351999-08-31031 August 1999 Forwards Request for Addl Info Re SG Outer Diameter Intergranular Attack Alternate Repair Criteria for Plant, Unit 1 ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211F4181999-08-25025 August 1999 Forwards SE Accepting Licensee 980603 & 990517 Requests for Approval of risk-informed Alternative to 1992 Edition of ASME BPV Code Section Xi,Insp Requirements for Class 1, Category B-J Piping Welds ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves IR 05000368/19990111999-08-12012 August 1999 Forwards Insp Repts 50-313//99-11 & 50-368/99-11 on 990719-23.No Violations Noted.Insp Focused on Review of Licensed Operator Requalification Program & Observation of Requalification Exam Activities at Unit 1 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 ML20210L3581999-07-29029 July 1999 Ltr Contract,Task Order 43, Arkansas Nuclear One Safety System Engineering Insp (Ssei), Under Contract NRC-03-98-021 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D8131999-07-28028 July 1999 Forwards Request for Addl Info Re SG Tube End Cracking Alternate Repair Criteria for Plant,Unit 1 ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 ML20210C2191999-07-21021 July 1999 Forwards Insp Repts 50-313/99-08 & 50-368/99-08 on 990530-0710 at Arkansas Nuclear One,Units 1 & 2,reactor Facility.No Violations Noted.Conduct of Activities at Plant Generally Characterized by safety-conscious Operations ML20209H5251999-07-15015 July 1999 Informs That as Result of NRC Review of Licensee 980701 & 990311 Responses to GL 92-01,rev 1 & Suppl 1 & Suppl 1 RAI, Staff Revised Info in Reactor Vessel Integrity Database & Releasing Database as Rvid Version 2 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20209E5551999-07-0808 July 1999 Informs That as Result of NRC Review of Util Responses to GL 92-01,rev 1,suppl 1,staff Revised Info in Rv Integrity Database & Releasing Database as Rvid Version 2 1999-09-09
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEAR1CAN109906, Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 11999-10-19019 October 1999 Forwards Framatome Technologies,Inc non-proprietary TR BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheet of Once-Through Sgs, Rev 1 2CAN109902, Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs1999-10-15015 October 1999 Submits Withdrawal of Code Case N-593 for ANO-2 Replacement SGs 2CAN109903, Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp1999-10-14014 October 1999 Forwards Response to RAI Re Proposed Tech Specs Change for Special SG Insp 1CAN109905, Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included1999-10-0404 October 1999 Discusses Insp of Once Through SG Tubing Surveillance Performed During 1R15 Scheduled RFO on 990910.Category C-3 Results,Included 1CAN099908, Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria1999-09-30030 September 1999 Withdraws 990919 Exigent TS Change Request to Allow Continued Installation of re-rolls for One Cycle of Operation Through End of Cycle 16 in Conjunction with Addl Insp Criteria 2CAN099902, Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,20001999-09-29029 September 1999 Requests That NRC Assign CENPD-132,Suppl 4-P, Calculative Methods for Abb Cenp Large Break LOCA Evaluation Model, Review Priority So That Approval Will Be Granted No Later than Oct 31,2000 1CAN099903, Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.31999-09-27027 September 1999 Forwards Rev 0 to COLR for ANO-1 Cycle 16, IAW TS 6.12.3 1CAN099907, Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative1999-09-26026 September 1999 Requests That Alternative Be Allowed in Accordance with 10CFR50.55a(a)(3)(i) & (II) as Discussed in Encl 1.Encl 2 & 3 Stress Analysis & Flaw Evaluation Summaries Ref in Encl Alternative 2CAN099901, Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 9908271999-09-24024 September 1999 Informs That G Kendrick,License SOP-43658,no Longer Has Need to Maintain Operating License on Ano,Unit 2.Entergy Requests That License for Individual Be Withdrawn,Due to Resignation, Effective 990827 1CAN099906, Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data1999-09-24024 September 1999 Forwards 1R15 Growth Data Obtained & Analyzed Through 990922 & Includes Plus Point Voltages,Axial Extent & Circumferential Extent Patches,As Well as Preliminary Growth Conclusions Based on Analysis of Data 2CAN099904, Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR1999-09-23023 September 1999 Forwards Ano,Unit 2 10CFR50.59 Rept for Time Period Ending 990225.Rept Contains Brief Description of Changes in Procedures & in Facility as Described in Sar,Tests & Experiments Conducted & Other Changes to SAR 1CAN099905, Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments1999-09-17017 September 1999 Submits Supplemental Info in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria.Proposed TS Rev & Info Related to Use of Alternate Repair Discussed in Attachments 1CAN099902, Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld1999-09-15015 September 1999 Forwards Proprietary Rev 1 to Topical Rept BAW-10235P, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs, in Response to 990831 Rai.Proprietary Encl Withheld 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested1999-09-0909 September 1999 Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) 1CAN099901, Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments1999-09-0707 September 1999 Forwards Responses to 990831 RAI Containing follow-up Questions Discussed on 990823-26,in Support of SG Outer Diameter Intergranular Attack Alternate Repair Criteria. Revs to Proposed TSs Included in Attachments 0CAN099906, Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs1999-09-0101 September 1999 Forwards Comments on Ano,Units 1 & 2 Specific Reactor Vessel Info Contained in Rvid,Version 2,in Response to NRC 990708 & 0715 Ltrs ML20211E6161999-08-25025 August 1999 Forwards Amend 15 to ANO Unit 2,USAR,per 10CFR50.71(e) & 10CFR50.4(b)(6).Summary of 10CFR50.59 Evaluations Associated with Amend 15 of ANO Unit 2 SAR Will Be Provided Under Separate Cover Ltr with 30 Days 0CAN089905, Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 19991999-08-25025 August 1999 Forwards Arkansas Nuclear One Units 1 & 2 FFD Program Performance Data for Period Jan-June 1999 ML20211G0731999-08-19019 August 1999 Forwards Applications for Renewal of Operating License for Kw Canitz & Aj South.Without Encls 1CAN089904, Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl1999-08-19019 August 1999 Forwards Addl Info in Support of SG Tube End Cracking Alternate Repair Criteria,In Response to NRC 990728 Rai. Proposed TS Changes Encl ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 0CAN089903, Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves1999-08-12012 August 1999 Submits Addl Response to NRC Second RAI Re GL 95-07, Pressure Locking & Thermal Binding of Gate Valves 2CAN089901, Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 9907291999-08-0606 August 1999 Forwards Description of Planned Scope & Expansion Criteria for Special SG Tube Insp,In Support of Proposed ANO-2 TS Amend for 2P99 Special SG Insp Submitted on 990729 1CAN089902, Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License1999-08-0505 August 1999 Requests NRC Input on Encl Proposed Draft Format for ANO-1 License Renewal Application,Which Will Provide Option to Continue Operating Plant for Addl Twenty Years Beyond End of Current Operating License 2CAN089902, Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested1999-08-0404 August 1999 Informs That Tl Russell,License SOP-43587-1 & Jk Fancher, License OP-42300-1,no Longer Have Need to Maintain Operating License at ANO-2.Withdrawal of Licenses Requested 0CAN089901, Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 9906031999-08-0202 August 1999 Forwards Info Re Estimate of licensee-originated Licensing Actions for ANO-1 & ANO-2,in Response to Administrative Ltr 99-02,dtd 990603 0CAN089902, Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified1999-08-0202 August 1999 Submits 60 Day Response to GL 99-02, Laboratory Testing of Nuclear Grade Activated Charcoal. Proposed Actions That Will Be Taken on ANO Unit 1 RB Purge Filtration Sys & Unit 2 Containment Purge & Exhaust Sys,Clarified 1CAN079903, Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks1999-07-29029 July 1999 Forwards non-proprietary Addendum to Rev 0 of Topical Rept BAW-2346P,in Support of Proposed TS Changes Revising SG Tubing Surveillance Requirements to Provide Alternate Repair Criteria for Tube End Cracks ML20216D3561999-07-23023 July 1999 Discusses non-cited Violation Identified in Insp Rept 50-313/98-21,involving Failure to Have Acceptable Alternative Shutdown Capability for ANO-1 1CAN079901, Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages1999-07-14014 July 1999 Forwards Proposed Changes to Current Util 990409 Submittal Re Rev to RB Structural Integrity Requirements Contained in Plant Ts.Proposed Revs Affect ACs & Applicable Bases Re ISI Reporting for Containment Structures,Tendons & Anchorages 0CAN079902, Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl1999-07-14014 July 1999 Responds to NRC Telcon RAI Re Proposed Administrative Controls TS Changes.Revised TS Pages Which Replaces Pages Previously Provided in 981124 Submittal,Encl ML20210K1621999-07-0707 July 1999 Informs That Licensee in Process of Preparing Scope of Service Delineation for Environ Assessment to Be Performed for New Airport Located Near Russellville,Ar,To Identify Anticipated Environ Impacts from Various Agencies 1CAN079902, Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation1999-07-0606 July 1999 Documents ANO-1 Position Discussed on 990705,with Members of NRC Staff & Formally Requests Enforcement Discretion from Requirements of TS 3.7.2.C to Allow Continued Power of Operation ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 0CAN069906, Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages1999-06-30030 June 1999 Forwards Corrected Pages to 1997 & 1998 Annual Radiological Environ Operating Repts, Issued 980430 (0CAN049804) & 990506 (0CAN059902).Ltr Number & Page Number Are at Top of of Corrected Pages to Replace Originally Pages 1CAN069905, Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs1999-06-17017 June 1999 Forwards non-proprietary Version of Rev 0 to TR BAW-10235, Mgt Program for Volumetric Outer Diameter Intergranular Attack in Tubesheets of Once-Through Sgs 0CAN069903, Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii)1999-06-10010 June 1999 Submits Rept of Each Change to or Error Discovered in Acceptable Evaluation Model or in Application of Such Model for ECCS That Affects Peak Cladding Temp,Iaw 10CFR50.46(a) (3)(ii) 2CAN069901, Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 20001999-06-0202 June 1999 Forwards Probabilistic Operational Assessment of ANO-2 SG Tubing for Cycle 14. Replacement of SGs Planned for Next Refueling Outage (2R14) Scheduled for Fall of 2000 1CAN069901, Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice1999-06-0202 June 1999 Submits 10CFR50.46 Rept Re Inconsistent Input in SBLOCA Analysis.Rept Submitted in Accordance with Recommendations Stated in Notice 0CAN059906, Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs1999-05-28028 May 1999 Forwards Response to NRC 990402 RAI Re GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs ML20207E4341999-05-25025 May 1999 Submits 30-day Written Rept on Significant PCT Changes in ECCS Analysis for ANO-1.CRAFT2 Limiting PCT for ANO-1 Was Bounded by 1859 F PCT Calculated at 2568 Mwt for Crystal River 3 Cold Leg Pump Discharge Break Size of 0.125 Ft 1CAN059904, Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn1999-05-20020 May 1999 Informs NRC That Wl Franklin No Longer Has Need to Maintain Operating License on Ano,Unit 1.Requests License for Wl Franklin Be Withdrawn 2CAN059906, Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-11999-05-18018 May 1999 Informs That ANO-2 UFSAR Will Be Revised to Include Comprehensive Discussions of Each Category of Containment Penetration Overcurrent Protective Devices,Per NRC Review of 980806 TS Change Request Re Relocation of TS Table 3.8-1 1CAN059902, Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program1999-05-17017 May 1999 Responds to NRC 990406 RAI Re risk-informed Inservice Insp Pilot Application,Submitted 980603.Approval of Alternative Is Requested Prior to End of July 1999,to Allow Sufficient Time for Util to Revise ANO-1 ISI Program 2CAN059905, Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative1999-05-14014 May 1999 Expresses Appreciation for Staff & Mgt Team Efforts in Aggressively Pursuing Risk Informed ISI Initiative ML20206P7681999-05-10010 May 1999 Forwards Applications for Renewal of Operating License (Form 398) for MW Little & F Uptagrafft.Without Encl 2CAN059903, Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance1999-05-10010 May 1999 Forwards Rev to Footnote Submitted to Provide Clarity to Aforementioned Guidance ML20206N1921999-05-10010 May 1999 Provides Revised Attachment 2 for Alternative Request IWE-02,originally Submitted 990429 Re Bolt Torque or Tension Testing of Class Mc pressure-retaining Bolting as Specified in Item 8.20 of Article IWE-2500,Table IWE-2500-1 ML20206H7121999-05-0606 May 1999 Forwards 1998 Annual Radiological Environ Operating Rept, for Ano.All Radionuclides Detected by Radiological Environ Monitoring Program During 1998 Were Significantly Below Regulatory Limits 1999-09-09
[Table view] Category:UTILITY TO NRC
MONTHYEAR2CAN099009, Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 9009251990-09-21021 September 1990 Requests Interim Relief from Inservice Testing Re Performing Partial Stroke Test for Check Valve 2SI-16A.Valve Currently Required to Be Tested by 900925 0CAN099002, Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP1990-09-14014 September 1990 Discusses Validation of Nonlicensed Operator Staffing,In Response to Insp Repts 50-313/90-01 & 50-368/90-01.Concludes That Current Level of Three Nonlicensed Operators Per Shift, Adequate to Meet Demands of Operations Under EOP 0CAN099007, Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-071990-09-14014 September 1990 Forwards Operator Licensing Exam Schedule for FY91 Through FY94,per Generic Ltr 90-07 2CAN099004, Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis1990-09-0707 September 1990 Forwards Response to 900809 Telcon Questions on CEN-386-P Re Extended Burnup,Including Criteria,Methods & Analysis 0CAN099001, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised1990-09-0707 September 1990 Responds to NRC Ltr Re Violations Noted in Insp Repts 50-313/90-19 & 50-368/90-19.Corrective Actions:Surveillance Procedures Reverified & Revised 1CAN099003, Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 19911990-09-0606 September 1990 Requests one-time Rev to Natl Exam Schedule for Operator License & Requalification Exams at Facility to Allow Testing in Aug,Rather than Feb of 1991 0CAN089009, Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg1990-08-31031 August 1990 Informs of Relocation to New Generation Support Bldg Just Outside Protected Area Southeast of Administration Bldg 0CAN089006, Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual1990-08-30030 August 1990 Forwards Semiannual Radiological Effluent Release Rept for First & Second Quarters 1990 & Changes to ODCM & Process Control Manual 0CAN089008, Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d)1990-08-29029 August 1990 Forwards Facility fitness-for-duty Program Performance Data for Jan-June 1990,per 10CFR26.73(d) 0CAN089005, Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 9010011990-08-27027 August 1990 Requests Authorization to Use Inconel 690 Tubing & Bar Stock for Steam Generator Repairs at Plant.Approval Necessary to Support Planned Use of I-690 Sleeves & Plugs During 1R9 Scheduled to Begin on 901001 1CAN089011, Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers1990-08-16016 August 1990 Requests Relief from ASME Code Section XI Requirements Re Exercise & Stroke Time Testing for Low Pressure Injection Valves CV-1432 & CV-1433.Valves Located in Bypass Lines Around Decay Heat Coolers 2CAN089009, Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 9010311990-08-13013 August 1990 Requests Addl Time to Respond to NRC 900607 Request for Info Re Second 10-yr Interval of Inservice Insp Program. Response Will Be Submitted No Later than 901031 0CAN089002, Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 11990-08-0808 August 1990 Responds to Recommendations from Insp Repts 50-313/90-04 & 50-368/90-04 on 900202 That Reporting Format for Semiannual Radioactive Effluent Release Repts Be Revised to Comply W/ Reg Guide 1.21,Rev 1 05000313/LER-1989-041, Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria1990-08-0202 August 1990 Revises Commitment Completion Date for LER 89-041-00 Re Proper Method of Calibr of Startup Feedwater Control Valves CV-2623 & 2673 to 900915.Delay Due to Time Needed to Review & Implement New Calibr Guidance Criteria 2CAN089006, Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info1990-08-0202 August 1990 Forwards Steam Generator Tubing Inservice Insp Rept 2R7 Refueling Outage.No Tubes Plugged.Apologizes for Delay in Submitting Info ML20081E0891990-07-31031 July 1990 Advises That Since Guidance Contained in Reg Guide 1.97 Not Addressed in Submittals Re Generic Ltr 82-33,further Clarification of Position Re Compliance W/Generic Ltr Appropriate,Per .Ltr Will Be Submitted by 901215 0CAN079014, Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 9009301990-07-31031 July 1990 Amends Commitment Date for Mods to Svc Water Pump Design,Per Insp Repts 50-313/89-30 & 50-368/89-30.Project Scoping Rept Expected to Be Completed by 900930 0CAN079024, Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures1990-07-31031 July 1990 Forwards Revised Response to Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Specific Communication Meetings Will Be Conducted W/Staff Re Decontamination Practices & Procedures 0CAN079020, Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790)1990-07-31031 July 1990 Forwards Update to Status of Remaining Open Items on Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Encl Withheld (Ref 10CFR2.790) 0CAN079018, Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3)1990-07-24024 July 1990 Certifies That Info Contained in Rev 12 to QA Manual Operations Freighted to NRC on 900723 & Accurately Represents Changes Made Since Previous Submittal,Per 10CFR50.54(a)(3) 0CAN079021, Forwards Rev 12 to QA Manual Operations1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations 0CAN079019, Forwards Rev 12 to QA Manual Operations.W/O Encl1990-07-23023 July 1990 Forwards Rev 12 to QA Manual Operations.W/O Encl 0CAN079011, Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 9002161990-07-20020 July 1990 Suppls Response to Violations Noted in Insp Repts 50-313/88-47 & 50-368/88-47 Re Isolation Valve CS-26. Corrective Actions:Special Work Plan Developed & Valve Cs-26 Local Leak Rate Tested on 900216 2CAN079008, Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps1990-07-17017 July 1990 Forwards Response to NRC Questions on CEN-386-P Re Extended Burnup Rept & Statistical Treatment of Elastic Strain in Fuel Cladding at end-of-life & Measured Axial Fuel Rod pellet-to-pellet Gaps 0CAN079006, Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance1990-07-17017 July 1990 Provides Update to Util Providing Results of Comparison of Station Blackout Rule Submittals to NUMARC Guidance 2CAN079001, Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip1990-07-0505 July 1990 Submits Addl Info Re 890822 Tech Spec Change Request for RCS Safety Valves & Plant Sys Turbine Safety Valves. Tolerance of -3% in Combination W/Current High Pressurizer Trip Setpoint Ensures Valves Will Not Open Prior to Trip ML20043H5161990-06-19019 June 1990 Informs of Changes of Responsibility for Plant Emergency Plan,Effective 900605 ML20043H3121990-06-18018 June 1990 Forwards Responses to Remaining NRC Questions Re Seismically Qualified,Partially Protected,Condensate Storage Tank (Qcst).Analyses in Calculations Demonstrate That Qcst Tank Foundation & Drilled Piers Adequate W/O Mod ML20043F3321990-06-15015 June 1990 Submits Addl Info on Tech Spec Change Request for Seismic Instrumentation,Per 890809 Request.Licensee Concurs W/Nrc Recommendation Re Editorial Change ML20043G0661990-06-13013 June 1990 Responds to Deviations Noted in Insp Repts 50-313/90-11 & 50-368/90-11.Corrective Actions:Further Evaluations Conducted to Develop Optimum List of post-accident Instruments Requiring Identification on Control Panels ML20043H3471990-06-11011 June 1990 Forwards Rev 19 to Industrial Security Plan.Rev Withheld (Ref 10CFR73.21) ML20043G3801990-06-11011 June 1990 Responds to Violations Noted in Insp Repts 50-313/90-04 & 50-368/90-04.Corrective Actions:Decision Made to Staff Unit 1 Exit Location Point W/Health Physics Technician 24 H Per Day ML20043F5121990-06-0808 June 1990 Forwards List of Directors & Officers of Entergy Operations, Inc.Operation of All Plants Transferred to Entergy on 900606 ML20043F4341990-06-0707 June 1990 Informs of Receipt of Necessary Approvals to Transfer Operating Responsibilities of Plant to Entergy Operations, Per Amends 128 & 102 to Licenses DPR-51 & NPF-6, Respectively.Extension of Amend Request Unnecessary ML20043E6561990-06-0707 June 1990 Requests That Listed Distribution Be Made on All Future NRC Correspondence.Correspondence to Ns Carns Should Be Addressed to Russellville ML20043E4991990-06-0505 June 1990 Provides Supplemental Response to Violations Noted in Insp Repts 50-313/89-02 & 50-368/89-02.Corrective Actions:Listed Program Enhancements Being Implemented to LER Process to Provide Timely Determinations of Condition Rept ML20043E3851990-06-0404 June 1990 Concurs w/900516 Ltr Re Implementation of SPDS Complete for Both Units & Requirements of NUREG-0737,Suppl 1 Met ML20043E3771990-06-0404 June 1990 Forwards Response to Concerns Re Control Room Habitability Survey.Addl Mods Identified Will Enhance Overall Reliability of Control Room Sys & Changes Designed to Increase Performance,Effectiveness & Response of Habitability Sys ML20043C0821990-05-25025 May 1990 Withdraws 900410 Request to Amend Tech Spec Table 3.3-1 Re Applicable Operational Modes for Certain Reactor Protective Instrumentation Operability Requirements ML20043B6531990-05-22022 May 1990 Forwards Rev to Industrial Security Plan to Eliminate Need to Protect Certain Vital Areas of Plant.Rev Withheld (Ref 10CFR73.21) ML20043B7091990-05-21021 May 1990 Forwards Revised Maelu Certificate of Insurance for Nuclear Onsite Property Insurance Coverage for 1990,changing Policy Number from X89166 to X90143R ML20043A5441990-05-16016 May 1990 Discusses Status of Safety & Performance Improvement Program Portion of B&W Owners Group EOP Review Project ML20043A5991990-05-15015 May 1990 Forwards Monthly Operating Rept for Apr 1990 & Corrected Repts for Feb & Mar 1990 for Arkansas Nuclear One,Unit 1 ML20042H0551990-05-0909 May 1990 Forwards Civil Penalty in Amount of $50,000 for Violations Noted in Insp Repts 50-313/86-23 & 50-368/86-24 Re Environ Qualification of Electrical Equipment Important to Safety. Comprehensive Corrective Actions Undertaken ML20043B0841990-05-0909 May 1990 Corrects 900309 Ltr Re Completion of Security Perimeter Improvement Project,Per Insp Repts 50-313/87-31 & 50-368/87-31.Design Change Package Addressing Perimeter & Interior Lighting Scheduled to Be Onsite Late Summer 1991 ML20043A8361990-05-0707 May 1990 Responds to Violations Noted in Insp Repts 50-313/90-05 & 50-368/90-05.Corrective Actions:Personnel Involved Received Counselling Re Incident & Operations Personnel Being Trained on Significance of Surveillance Requirements ML20042F4371990-05-0404 May 1990 Requests 90-day Extension to Provide Addl Time for Reviews of Amends 128 & 102 to Licenses DPR-51 & NPF-6,respectively, Re Ownership Transfer ML20042G4771990-05-0404 May 1990 Forwards Summary of Util Exercise Critique Board Evaluation of Radiological Emergency Preparedness Exercise REX-90,per Insp Repts 50-313/90-08 & 50-368/90-08 ML20042F3351990-05-0303 May 1990 Forwards Nonproprietary Suppl 1 to CEN-386-NP & Proprietary Suppl 1 to CEN-386-P, Responses to Questions on C-E Rept CEN-386-P, 'Verification of Acceptability of 1-Pin Burnup Limit....' Proprietary Rept Withheld (Ref 10CFR2.790) ML20042F2701990-04-30030 April 1990 Provides Exam Schedules for Reactor Coolant Pumps a & B in Revised Inservice Insp Program Plan.Insps Scheduled for Refueling Outages 1R10 & 1R12 for Pump a Exams & Refueling Outages 1R10,1R12 & 1R14 for Pump B Exams 1990-09-07
[Table view] |
Text
NRC ""STRIBUT.'ON
'~ FOR PART 50 DOCV
~~ .iATERI AL i j '
' (fEMPORARY FORM)
~
- l CONTROL NO- 10 e' :
FILE: -
FROM: Arkansas Power & Light Co. DATE OF DOC DATE REC'D LTR TWX RPT Littl'e Rock, Arkansas OTHER J.H. Woodward ~
12-31-75 1-8-76 'XXX
-TO: .
ORIG CC OTHER EE SENT h'RC PDR D.L. Ziemann ^^A 1 Sianed 30 SENT LOCAL PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
XXX 40 50-313 ~
DESCRIPTION: l ENCLOSURES-Lettertranstheibibk89 our}etterof11-27-7E ,
F.e'tter W/ Attached responses concerning Re-
, Evaluation of ECCS Performance.......
(40 Cys. Recieved) .
. THIS D0COMENT CONTAINS POOR QUAL.lTY PAGES PL ANT NAME: Arkansas # 1
- FOR ACTION /INFORMATION SAB 1-9-76 DUTLER (L) SCHWENCER (L) c2Ti31 ANN (L) REGAN (O W/ Copics W/ Copies REID(L)
W//,,Copics W/ Copies W/ COPIES CLAR K (L) STOLZ (L) DICKER (E) LEAR (L)
W/ Copics . W/ Copies W/ Copies W/ Copies PAR R (L)
W/ Copies VASSALLO (L)
W/ Copies KNIGHTON (E) s?IES ACKNOWLEDGED W/ .Copics -
KNIEL (L) PURPLE (L) ' YOUNGBLOOD (E) ~W/
Lyn Copies DO W- vT *EiE7E ~~
W/ Copics W/ Copics W/ Copics W/ ~ Copies '
INTERNAL DISTRIBUTION
@ FILD TECH REVIEW DENTON _LIC ASST A/T IND; c.imL FuH SCHROEDER GRIMES p, ROOM P 506A MACCARY GAMMILL MIGGS (L) BRAITMAN s.GCSSICK/STAF F H. GEARIN (L) SALTZMAN '
KNIGHT KASTNER M PAWLICKl BALLARD E. GOULBOURNE (L)
P. KREUTZER (E)
ME LTZ
~
t . SHAO ,
SPANGLER J. LEE (L) PLANS l
c.ACYD cSrTTLLO MCORE (L) HOUSTON M. RU3HER00K(L) MCDONALD ENVIRO S. REED (E) CHAPMAN DEYOUNG (L) dtOVAKC) MULLER M. SERVICE (L) (Ltr) '
SKOVHOLT (L) MS DICKER S. SHEPPARD (L) OUPE GOLLER (L) (Ltr) IPPOLITO l KNIGHTON M. SLATER (E) PETERSON P. CO LLINS 'JEDESCO DENISE
- YOUNGBLOOD ' H. SMITH (L) HARTFIELD (2)
J. COLLINS REGAN S. TEETS (L) KLECKER
_R E G O P R c.kA'TNAS PROJECT LDR EISENHUT GJ WILLI AMS (E) tSIM& REGION (2) BENAROYA d RAosfiA V. WILSON (L) NTON HIPC . VOLLMER H AP.' ESS
i R. INGR 'M (L) .
,. M. D.UNCAM M K. '
EXTERNAL DISTRIBUTION
- OCAL PDR_Russ.al.1ville Arkansas
-J.lC (ABERNATHY) (1)(2)l10)- NATIONAL LABS 1 - PDR SAN /LA/NY y- f; SIC (E UCHANAN) 1 - W. PENNINGTON, Rm E.201 GT 1 - BROOKHAVEN NAT LAB 1 - ASLB *~
1 - CONSU LTANTS 1 - G. ULRIKSON ORNL 1- ewton Anderson NEWM ARK /B LUM E/AG B ABI AN .
- ACRS MUMX;U/SENT to L.A. R. Diggs
) ,
42 () .
,. m '
s g
Ed,cyr l Y H ELPIN G BLJILO ARKANSAS W
ARK ANS AS POWER & LIGHT COMPA NY STH & LOUISIAN A ST AEETS . LITTLE ACCK. A AK ANS AS 72203 .(5011 371-4000 December 31, 1975
' N
& q e:mm y uswa JA iszg >
Director of Nuclear Reactor Regulation ATTN: Dennis L. Ziemann, Chief U,fC i Operating Reactors Branch #2 b U. S. Nuclear Regulatory Commission #
Washington, D. C. 20555 *"
Subject:
Arkansas' Power S Light Company Arkansas Nuclear One-Unit 1 Docket No. 50-313 License No. DPR-51 Re-Evaluation of ECCS Performance Gentlemen:
Attached find responses to those items contained in your letter of November 27, 1975 to Mr. J. D. Phillips concerning the above subject.
As stated in our initial submittal of July 9,1975, your expeditious review, comments and/or approval is requested.
ery truly yours, h d-e9 J. H. Woodward Director, Power Production JHW:ay Attachment O s or 4 g
,_ w .3 . t^b u Fei
- & Nk,i?%cGyg ~$5 xq w_ f 142 ~
Attachment.to L9tter Woodward to Ziemann December 31, 1975 NRC-Question 1-It.is the staff's position that Mode I should not be attempted as the primary method- to control- boron concentration in the core during long-term cooling. 'lhe possibility of gas or steam entrainment in the decay heat suction nozzle can result in severe damage to the decay heat removal pump. -Long-term heat removal requirements can exist for long durations (days or months) after the accident and continuous operation of one train of the decay heat removal system is required. In the event of a equipment malfunction in this train, no method is available to remove the decay heat if the other train has been previously damaged. Therefore, implementation of Mode 1.should not be attempted since this action could result in the decrease of required safety equipment. To verify that gravity draining for boron dilution for Mode 2 is possible, provide the elevations of the piping and other components in the decay heat drop line from the hot leg nozzles through each of the trains to the reactor building sump.
Response
Mode 1, if attempted and successful, would have the following desirable features:
- 1. If the LOCA break were a cold leg break, bbde 1 would produce enough forced flow through the core to stop boiling in the core.
- 2. Mode 1 could determine whether the break elevation is high enough to shut off the other LPI string taking suction from the sump. This would stop coolant from spilling out of the break which should enhance reactor building entry, repair and cleanup.
Of course, break location may be determined at some point in time by personnel entry into the reactor building.
Mode 1 will not be attempted until conditions (radiation level) in the auxiliary building permit a plant operator to be near the LPI pump to observe ~ the pump for symptoms of cavitation and entrainment of vapor or gas. - Also, operational changes (such as shutting down the other LPI pump) will not be attempted unless an operator can be near'the LPI pump to observe the pump for signs of cavitation.
Mode -1:is a ^ desirable method of operation and will only be considered the primary method of controlling boron concentration when the above conditions for operation are met.
]
In: regard to the last sentence of NRC Question 1, the following elevations apply to ANO-1:
t
. -+
,~
- Elevation of Decay Heat Letdown-Nozzle in Hot Leg - I365'9"
- Elevation : of containment- penetration of D.11. Letdown Line -- 362'0" -
' ' Elevation of_ suction piping ion D.11. pumps .-- 323'
. Elevation of moto'r -operated- valves in R. .B. sump -- 333'
- At no point in tho' piping system does the elevation of any component
' exceed the clovation-of the decay heat letdown nozzle in the hot Icg.
t a
.. -1 i
4
~j s u _
_ a;
.- 2 : ,
m
--~' l - ., , . , , - , , , , . . -
NRC Question 2 With regard to the single failure analysis, the analyses did not consider the failure of any one of the four valves in the decay heat drop line and the resulting effect to ECCS performance. Expand your single failure analyses to include spurious signals and the resulting consequences for all EtD valves in the CCCS. Confirm that post-IDCA long-term cooling requirements were considered (i.e., systems needed to limit boric acid
-concentration in the reactor vessel).
Response
The analysis concerning single failure criteria for manually-controlled electrically-operated valves did consider the failure of each of the three EMO valves -in the decay heat drop line (there are only three valves in this line rather than four as stated in the question). All EMO valves in the ECCS were analyzed; however, valves with "ES" signals were not included l in our transmittal as they are evaluated in the single failure analysis in l Section 6 of the SAR.
l The tabulation below addresses valves in systems needed to limit boron l concentration in the reactor vessel.
f l Valve Description Failure Evaluation l Dil drop line valves Closed Mould prevent Modes 16 l (CV1050, CV1410, or CV1404) 2, Mode 3 unaffected.
j Emergency sump outlet valve. Closed Would prevent Mode 2, (CV1405 or CV1400) Modes 1 6 3 unaffected.
j LPI flow control alve Closed tised for flow control in (CV1428 or CV1429) Mode 1, can tse cooler bypass valve (CV1433 or CV1432) instead.
Open Would prevent Mode 1.
For Modes 2 6 3, should be closed; CV1401 or CV1400 can be closed, which accomplishes intended function.
LPI cooler bypass valve .Open Would prevent Mode 1.
_ (CV1433 or CV1432) For Mode 2 should be closed; CV1401 or CV1400 can-be closed, which accomplishes intended function.
'l I
.3- !
E LPI injection valve Closed Would prevent .'fode 1.
(CV1401 or CV1400) Blodes 2 6 3 are not
.a f fect ed .
Open For blodes 2 li 3, should he closed. Iloweve r ,
CVI,128 or CVI.129 c:m be closed, which accomplishes intended function.
Pressuri:cr main spray Open No effect. For blode 3, line block valve (CV1009) CV1008 is closed, which accomplishes intended function.
Pressurizer main spray Open No effect. For Node 3, line control valve (CV1008) CV1009 is closed, which accomplishes intended function.
l l
l l
1 m .
NRC-Question 3 For a core flooding tank (CFT) line break and an inadvertent closure of a valve in the unaffected low pressure injection line, the LPI-to-LPI crossover would be rendered ineffect;ve. Station Technical Speci ficat ions must require that power be disconnected and breakers locked open to LPI motor-operated valves downstreu of the LPI-to-LPI crossover (valves normally open) and that a periodic test be performed to warn of abnormal leakage of the check valves in the _ LPI injection lines inside the contain-ment. These changes provide further assurance that abundant core cooling is available for a CFT line break and minimi::e the potential for a 1DCA outside containment. Discuss the above concerns and submit the required Technical Specification change if necessary.
Response
As shown in Figure 6-1 of the Arkansas Nuclear One-Unit 1 FSAR and drawing M-230, Rev.13. (transmitted to you by our letter of September 4, 1975),
there are no motor-operated or power-operated valves located downstream of the LPI-to-LPI- crossover at ANO-1. Also, the LPI-to-LPI crossover is located inside the reactor building. Therefore, this question is not
- applicable to ANO-1.
I l
I I
i l
i
- S -- ,.
L - . -
NRC Question 4 It is noted that motor-operated valves CV1407 and CV1408 on drawing M-232, {
Rev. l 11, from the I!WST are shown norma 1ly elosed. J t appears that, as- l
- snming sufficient static head were availabic, the potential for a wat er '
hanner when liCC is injected into a dry line would lic reduced considerably if these valves were .normally open. Discuss this concern and indicate your position in this matter.
Respons_c,e If CV1407 and CV1408 were normally open then a flow path would be opened from the BNST to the suction of makeup pumps P36A and C, respectively.
We consider this to be an undesirable situation. Also, with these valves open, chere .would be only one isolation valve between the BWST and the Reactor Building sump, another undesirable situation. It is our position that these lines will remain full of water and ensure this through periodic
. pump (IIPI,- LPI, and RBS) testing recirculating to the BNST, periodic valve cycling, and normal decay heat removal operations.
M
p . .
NRC Question 5 1hc operating methods to control boric acid concentration in the core iluring long-term cooling require operator action in areas where radiation close ,leveis may lie excessive. Since operator actions may be delayed ilne to inaccessibility. to manual valves, provide analyses ol' the boron. concen-tration in the core as a function of time assuming the maximum possibic time delay to implement the required systers.
Response '
As stated in our April 21, 1975 letter to you we feel that the answer provided'to Question 120 in BAW-10091, Rev. I adequately responds to the concern of analyses performed. Figure 10-4 of BAW-10103, Rev. I shows the boron concentration versus time for operator inaction and action situations.
- Valve lineups may be m complished for Mode 3 with no excessive radiation dose being received by the operators. The valves which will be necessary 1 to be aligned are outside of containment in the piping penetration room at Elevation 360'.
Valve' lineups for Modes l' and 2 will be accomplished in the Decay !! cat Pump Room at Elevation 317'. Dose rate calculations have been performed based on the assumptions stated in FSAR Section 14.2.2.5.6. The source term used for the 14" 10S decay heat removal pump pipe (the primary source from which an operator would ~ receive radiation while operating va! 'es in the decay heat pump room following LOCA) is the iodine fission product inven-tory given in Tdble 14-49 of the FSAR. The source term was diluted by the volume' cf the primary system and the refueling water storage tank. Assuming, conservatively, that an operator would be in the room for 15 minutes (no '
more than 10 minutes is actually expected) and that the surface dose rate is that which he will receive (valve stem length will ensure that he is not at the surface), at 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> following LOCA the dose which would be received is 27 Rem. We feel that this is not excessive in that it will be a-oneLtime dose, and the operator would perform no other functions in the plant following this action. To further ensure that the doses received in this area is not excessive, more than one operator could perform the operation, i.e. one person at a time would be in the room for a short dura-
~t ion. and would be replaced by another operator, etc. to complete the opera-tion of valve lineup. Also, we feel that this dose estimate is conservative and will not actually be roccived based on the assumptions stated above.
l l
l 1
I 1
< l
- - 7 -. l
_ . ~ _ , _ .
. l ;, .. . .
NRC Question 6a
, With regard to partial loop analysis:
Discuss the consequences of a break in an active cold leg of the
~ fully active loop.
I
Response
During steady state, 3-pump operation, the pump in the active cold leg-inactive loop supplies 44.6% of system flow compared to the pump-in the
. active cold Icg-active loop which supplies 34% of system flow. Figure 1 shows the Reactor Coolant System flow for 3-pump operation. 1herefore, placing the break at the discharge of the pump in the active cold leg-inactive loop instead of the active cold Icg of the fully active loop, would yield the most degraded positive flow through the core during the first half ~of the blowdown. This 'is due to the loss of the largest source of positive flow and this would result in higher cladding temperature.
Thus, analyzing this break . location will ensure that the most conservative assumptions affecting core flow have been considered.
9 m
- 8.- '
O U "
[ [
A !
14 % g :
's)
- e l l
- 1 44.6 % 34 7 %
. FIG 111!!! 1 Ileactor Coolant Syst;n Flou fo r 3-pumps operatin): ( pe r'cen t o f t o t a l system' flow) . <>
NRC Question 6b Two pump operation will not be permitted unless an analysis is provided to support this mode of operation. Compare a break in the inactive cold leg to a break in the active cold leg.
Response
Based on the arguments presented below, conformance to the ECCS acceptance criteria given in 10CFR50.46 is assured for 2-pump operation. llowever, since no analysis has been performed, Technical Specifications for 2-pump operation will be revised to allow operation in the mode for a period not to exceed 5 days.
With 2-pumps operating, one in each loop, the maximum power level will be 51'4 of full power which includes 2% for uncertainty. The system flow rate is reduced to 50*6 of normal 4-pump operation at steady state conditions. The idle pumps in each loop are locked in position because flow is reversed in each of the inactive cold legs. About 18.8% of the RC flow from the downcomer plenum is directed back in each inactive cold leg. If the flow reverses to the positive direction during the transient the idle pump would act as a free spinning roter with no power.
The core flow for a break in an inactive leg with 2-pumps operating should be similar to a break in the active cold leg-inactive loop with 3-pumps ope rat ing. During the LOCA transient, the positive driving force for both breaks is with 2-pumps and therefore the core flow should be approximately the same. The raflooding rates for the 2-pump case should be greater than the 3-pamp case because the core power is lower, 51% versus 77% of full power rating, thus a lower cladding temperature rise after the End of Blowdown (E0B) would be expected for 2-pumps operating.
A break at the pump discharge of either one of the active cold legs will cause a loss in positive flow during the first half of the transient compared to the above case. The transition from positive to negative flow should occur earlier. The negative flow would be substantially increased due to the decrease frem 2 to 1 active pumps trying to force positive flow into the core region. The high negative flow rate through the core during the blowdown phase should provide good core cooling and remove a significant amount of stored energy in the fuel. Thus the cladding temperature during this phase of the LOCA should be maintained at a relatively low temperature.
The reflooding phase,should have the same improvement in clad temperature as described for the previous 2-pump case, i.e., a lower cladding temperature rise after the E0B would be expected.
' 4 ,
0*
- i. . , . ,
t
'therefore, the maximum cladding temperature for 2-pump -operation should be_'approximately equal to or less than that calculated for 3-pump operation.
Sin'ce the calculated peak cladding ' temperature for a LOCA that occurs during 3-pump operation gives a large margin (434F) relative to the 2200F limit, l 2-pump operation will easily comply to-the acceptance criteria for the ECCS set forth in 10CFR50.46..
9 I
l t .
f,
~
I i
l' l
l I'
4
+
I r 1"_
u s-
- i. '
.: P. q '.
9
-f- it y i ---l . g- , . - + --v., -- ,~ , , y -. _ 'Y -.- .g, e-.-. . ,
e m .
NRC Question 6e Indicate and justify the worst-case pump status assumed at' the time of the LOCA (tripped vs. powered).
Response
The partial 1.oop analysis was performed assuming the worst case break (8.55 ft2 DE,1:D = 1.0, pumps powered) reported in BAW-10103. Based on the results given in section 5.5. of BAW-10103, it was found that the pumps-powered case produced the highest peak cladding temperature (2114F vs. 2080F). The dif-forence of 34F indicates that the 00CA analysis is relatively insensitive
, to assumptions regarding electrical power availability to the pump.
The effect of whether pumps tripped or pumps powered is the worst case has been essentially an'alyzed by the two cases that were analyzed in the partial loop analysis. . Core flow for a break in the inactive loop-active cold leg
. and inactive loop-inactive cold leg is similar to the core flow with pumps tripped and powered, respectively, as can be seen by comparing Figures 2 and 4 of- the partial loop analysis to Figure 5-7 of BAW-10103. Comparing results for the two partial loop cases illustrates that the results would be insen-sitive to a change in pump status. Since the maximum cladding temperature calculated for the partial loop analysis is only 1766F, which is 313F less ,
than the same break at full power and flow conditions, the pump status would !
not adversely affect the results. '
i l
9 Y
~ 11 -
s .
_ NRC Question 6d Provide assurance that the PCT versus break size curve in BAW-10103 would not be'significantly altered by either mode of partial loop operation.
Response
l l The partial loop analysis was . performed assuming the worst case break (8.55 ft2 DE, C 1) repo.rted in BAW-10103 at the maximum Kw/ft limits shown in Figure 2-2. DIl =istorically, the above break has resulted in the highest cladding tem-i perature for _ LOCA analysis. In general as the break size decreases, the l
duration of the blowdown increases which results in decreased maximum cladding l temperature.- Tabic 6-1 of BAW-10103, Summary of Break Spectrum, verifies
- this statement, i.e., the maximum claddgng temperature decreased 195F when l the discharge coefficient for a 8.55 ft DE break was changed from 1.0 to 0.6.
As mentioned in response to Question 6.c, the core flow for the partial loop cases are similar to those shown in BAW-10103. Therefore, core flow for smaller breaks during partial loop operation would'be similar to that shown in Section 6 of BAW-10103. With similar flows, the peak clad temperature (PCT) l versus break si:e curve should exhibit the same trend, i.e., decreasing PCT with break size. Since the PCT for the partial loop analysis is 313F less I
than that given for the worst break in BAW-10103, smaller , breaks will exhibit j large margins of safety relative to the 2200F criteria, t
e
+
l l l l
l l
i
!~
l 1
l i
l c .
.