ML19312C002

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Table 4.1-2 Changing Frequency for Testing Pressurizer & Main Steam Safety Valves
ML19312C002
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 12/31/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19312C000 List:
References
NUDOCS 7911270779
Download: ML19312C002 (1)


Text

)

. O..

Table 4.1-2 MINIMUM EQUIPMENT TEST FREQUENCY Item Test Frequency Control Rod Movement ( }

Movement of Each Rod Bi-Weekly 1.

2.

Pressurizer Safety Valves Setpoint 50% Annually 3.

Main Steam Safety Valves Setpoint 25% Annually 4.

Refueling System Interlocks Functional Prior to Refueling Main Steam Stop Valves ( )

Movement of Each Stop Monthly 5.

Valve 6.

Reactor Coolar:t System Evaluate Daily Leakage 7.

Condenser Cooling Water Functional Annually System Gravity Flow Test 8.

High Pressure Service Functional Monthly Water Pumps and Power Supplies 9.

Spent Fuel Cooling System Functional Prior to Refueling 10.

Hydraulic Snubbers on Visual Inspection Annually Safety-Related Systems (1) Applicable only when the reactor is critical.

(2) Applicable only when the reactor coolant is above 200*F and at a steady-state temperature and pressure.

7911370 [ 7 7 4.1-9