ML20045F072

From kanterella
Jump to navigation Jump to search
Rev 9 to Corporate Process Control Program Manual.
ML20045F072
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/07/1993
From: Vaught M
DUKE POWER CO.
To:
Shared Package
ML15224A266 List:
References
PROC-930407, NUDOCS 9307060377
Download: ML20045F072 (4)


Text

s' u ooom m c.m Fras pa ,aap w s tasas J

DUKE POWER COMPANY l

PCP REVISION APPROVAL.

Revised PCP Section:

Corporcie PCP, Rev. .

ONS PCP. Rev. L MNS PCP, Rev.

CNS PCP, Rev. _,

This reviston hos been reviewed ogainst Technical SpecticoMons, and applicobre NRC guidance documents and found to be acceptable.

Prepored By:% % .h WLt y

. q-

Title:

6%N v Rooweite Processing and Management Dote: 3/d4/T3 __

General Of!1ce Review Station Review By: M e!~e- By:bM f /. l

Title:

~

C L_

Title:

h.u hd Q

Date: __ J /24A7 Date; p3/;;l5,/73 This revision is opproved for use of hWec- Nuclear Stotton.

/24L14~ fataqtCw NuOlear Techn! col Services Monoget Oconee Chefnistry Monocer Date: 'l-12 -9 3 _

Date: Afif9_5

/ M /L== =- ..

Oconee Station Monoger Date: M7/M MBV:JI.012 9307060377 930630 3

_fj PDR ADOCK 05000269 P PDR (lj

DUKE POWER COMPAMY OCONEE NUCLEAR STATION PROCESS CONTROL PROGRAM l

1.0 PURPOSE The purpose of the Oconee Nuclear Station Process. Control Program is to ensure all requirements of the DPC Corperate Process Control Program have been met for each container of solidified radioactive or mixed waste and dewatered radioactive waste shipped for burial at a licensed burial facility. This PCP is applicable only to the solidification or dewatering of liquid or wet solid radioactive waste.

2.0 COMPOSITION 2.1 The Oconee Nuclear Station Process Control Program shall consist of: ,

2.1.1 The Duke Power Company Corporate Process Control Program.

2.1.2 A list of all station-specific procedures that implement the requirements of the Corporate Process Control Program.

2.1.3 Oconee Nuclear Station diagrams, drawings or drawing numbers showing interfaces between ONS radwaste systems and solidification and dewatering equipment.

2.1.4 Documentation of Nuclear Technical-Services Manager, ONS Chemistry Manager and ONS Station Manager approval of all changes to the Oconee Process Control Program.

3.0 EXCEPTIONS 3.1 The Oconee Nuclear Station Process Control Program takes the following exceptions with the DPC Corporate Process Control Program:

3.1.1 For Corporate PCP section 3.1.3, station review and Station Manager approval are not required. Corporate review and approval of vendor solidification and dewatering services are sufficient.

O-1 Rev. 9 r t.

i SECTION 2.1.2 )

Imolementino Procedures CP/3/B/5200/08A " Unit 3 High Activity Spent Resin Storage Tank (HASRST) Resin Transfer to Disposable Liner" CP/0/B/5200/48 " Resin Recovery System Operation" CP/0/B/4002/25 " Solidification of Grit Waste Generated by

  • Wet Grit Blast Decon Unit" '

CP/0/B/5400/01 "CNSI Procedure for Dewatering of Ecodex Precoat/Powdex/ Diatomaceous Earth in CNSI 14-195 or Smaller Liners" CP/O/B/54 00/02 " Bead Dewatering Procedure for CNSI 14-195 or ,

Smaller Liners" i CP/0/B/5400/03 " Operating Guidelines for the use of CNSI High Integrity Containers" CP/O/B/5400/04 " Handling Procedure for CNSI High Integrity Overpack Containers" CP/0/ B/54 00/07 "PCP for CNSI Solidificdtion Unit" CP/0/B/54 00/10 " Dewatering Procedure for CNSI 24" diameter Vessels Containing Activated Carbon and Ion Exchange Resins" CP/0/B/5400/12 " Westinghouse Procedure for Dewatering of Resin and Similar Media in SEG Resin Express Liners" RP/0/B/1006/01/A " Procedure for the Preparation and Shipment of Radioactive Wastes" i

i i

0-2 Rev. 9 l

2 SECTION 2.1.3 Drawina Index All system interfaces are shown on diagrams or described in the applicable station procedure. jl

" j l

l i

J l

1 i

h i

ONSPCP.100 0-3 Rev. 9

,