Proposed Tech Spec Table 4.1-2, Min Equipment Test Frequency.
ML16141A811
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 04/20/1994
From:
DUKE POWER CO.
To:
Shared Package
ML16141A812 List:
References
NUDOCS 9405050116
Download: ML16141A811 (4)


Text

DUKE POWER COMPANY.

OCONEE NUCLEAR STATION ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATIONS Remove Page Insert Page 4.1-9 4.1-9 9405050116 940420 PDR ADOCK 05000269 PD

Table 4.1-2 MINIMUM EQUIPMENT TEST FREQUENCY Item Test Frequency

1. Control Rod Movement a Movement of Each Rod Monthly
2. Pressurizer Safety Valves Setpoint Each Refueling(#)
3. Main Steam Safety Valves Setpoint Each Refueling("
4. Refueling System Interlocks"' Functional Prior to Refueling
5. Main Steam Stop Valves ( Movement of Each Stop Monthly Valve
6. Reactor Coolant System a Evaluate Daily Leakage
7. High Pressure Service Functional Monthly Water Pumps and Power Supplies
8. Spent Fuel Cooling System Functional Prior to Refueling
9. High Pressure and Low ( Vent Pump Casings Monthly and Prior Pressure Injection System to Testing
10. Emergency Feedwater Functional Each Refueling Pump Automatic Start and Automatic Valve Actuation Feature m Applicable only when the reactor is critical.

Applicable only when the reactor coolant is above 200*F and at a steady-state temperature and pressure.

(3) Operating pumps excluded.

(4) Number of safety valves to be tested each refueling shall be in accordance with ASME CodesSection XI, Article IWV-351 1, such that each valve is tested at least once every 5 years.

( Applicable only to the interlocks associated with the Reactor Building Purge System.

Oconee 1, 2, and 3 4.1-9

  • DUKE POWER COMPANY OCONEE NUCLEAR STATION ATTACHMENT 2 MARKUP OF CURRENT TECHNICAL SPECIFICATIONS

Table 4.,1-2 MINIMUM EQUIENT TEST hR.EQUENCY Test Frecuencv

1. Control Rod Movement (1) Movement of Each Rod Monthly
2. Pressurizer Safety Valves Setpoint Each Refueling( 4 )
3. Main Steam Safety Valves Setpoint Each Refueling (4)
4. Refueling System Interlocks(5) Functional Prior to Refueling
5. Main Steam Stop Valves (1) Movement of Each Stop Monthly Valve
6. Reactor Coolant System (2) Evaluate Daily Leakaze 7~~~~~~EW L * '~*** Qc iL 7

H igh Pressure Service Functional Monthly Water Pumps and Power Supplies A9. Spent Fuel Cooling System Functional Prior to Refueling

.3-e- High Pressure and Low Vent Pump Casings Pressure Injection System Monthly and Prior to Testing

/0 .t etn 4.< Emergency Feedwater Functional Each Refueling Pump Automatic Start and Automatic Valve Actuation Feature Applicable only when the reactor is critical.

(2)

Applicable only when the reactor coolant is above 200 0 F and at a steady state temperature and pressure.

(3)

Operating pumps excluded.

(4) Number of safety valves to be tested each refueling shall with ASL,! CodesSection XI, Article IWV-3511, be in accordance.

such that each valve is tested at least once every 5 years.

Applicable only to the interlocks associated with the Reactor Building Purge System.

OCONEE - UNITS 1, 2 & 3 4.1-9 Amendment No. 178 (Unit 1)

Amendment No. 178 (Unit 2)