Proposed Replacement Page for Tech Spec 4.1-2 Re Min Equipment Test Frequency
ML19316A650
Person / Time
Site: Oconee 
Issue date: 06/22/1978
From:
DUKE POWER CO.
To:
Shared Package
ML19316A649 List:
References
NUDOCS 8001130193
Download: ML19316A650 (1)


Text

c.

Tcblo 4.1-2 MINIMUM EQUIPMENT TEST FREQUENCY Item Test Frequency 1.

Control Rod Movement Movement of Each Rod Bi-Weekly 2.

Pressurizer Safety Valves Setpoint 50% Annually 3

Main Steam Safety Valves Setpoint 25% Annually 4

Refueling System Interlocks Functional Prior to Refueling III 5

Main Steam Stop Valves Movement of Each Stop Valve Monthly 6.

Reactor Coolant System (

Evaluate Daily Leakage 7.

Condenser Cooling Water Functional Annually System Gravi ty Flow Test 8.

High Pressure Service Functional Monthly Water Pumps and Power Supplies 9

Spent Fuel Cooling System Functional Prior to Refueling

10. High Pressure and Low (

Vent Pump Casings Monthly and Prior To Testing Pressure injection System (1)

Appilcable only when the reactor is critical (2)

Applicable only when the reactor coolant is above 200 F and at a steady-state temperature and pressure.

(3)

Operating pumps excluded.

(4)

In the movement test of rod 6 of safety group 4 of the Unlt 2 control rod system due June 27, 1978, an extension period of seven days to the maximum allowable interval between surveillances is allowed.

This seven-day extension period shall expire on July 4,1978.