Text
c.
Tcblo 4.1-2 MINIMUM EQUIPMENT TEST FREQUENCY Item Test Frequency 1.
Control Rod Movement Movement of Each Rod Bi-Weekly 2.
Pressurizer Safety Valves Setpoint 50% Annually 3
Main Steam Safety Valves Setpoint 25% Annually 4
Refueling System Interlocks Functional Prior to Refueling III 5
Main Steam Stop Valves Movement of Each Stop Valve Monthly 6.
Evaluate Daily Leakage 7.
Condenser Cooling Water Functional Annually System Gravi ty Flow Test 8.
High Pressure Service Functional Monthly Water Pumps and Power Supplies 9
Spent Fuel Cooling System Functional Prior to Refueling
- 10. High Pressure and Low (
Vent Pump Casings Monthly and Prior To Testing Pressure injection System (1)
Appilcable only when the reactor is critical (2)
Applicable only when the reactor coolant is above 200 F and at a steady-state temperature and pressure.
(3)
Operating pumps excluded.
(4)
In the movement test of rod 6 of safety group 4 of the Unlt 2 control rod system due June 27, 1978, an extension period of seven days to the maximum allowable interval between surveillances is allowed.
This seven-day extension period shall expire on July 4,1978.
8001130 / 7 3
--