ML19316A650

From kanterella
Jump to navigation Jump to search
Proposed Replacement Page for Tech Spec 4.1-2 Re Min Equipment Test Frequency
ML19316A650
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 06/22/1978
From:
DUKE POWER CO.
To:
Shared Package
ML19316A649 List:
References
NUDOCS 8001130193
Download: ML19316A650 (1)


Text

c.

Tcblo 4.1-2

. MINIMUM EQUIPMENT TEST FREQUENCY Test Frequency Item Movement of Each Rod Bi-Weekly

1. Control Rod Movement Pressurizer Safety Valves Setpoint 50% Annually 2.

25% Annually 3 Main Steam Safety Valves Setpoint Functional Prior to 4 Refueling System Interlocks Refueling 5 Main Steam Stop Valves III Movement of Each Stop Monthly Valve Reactor Coolant System ( Evaluate Daily 6.

Leakage Condenser Cooling Water Functional Annually 7.

System Gravi ty Flow Test Functional Monthly

8. High Pressure Service Water Pumps and Power '

Supplies Functional Prior to 9 Spent Fuel Cooling System Refueling

10. High Pressure and Low ( Vent Pump Casings Monthly and Prior Pressure injection System To Testing (1) Appilcable only when the reactor is critical (2) Applicable only when the reactor coolant is above 200 F and at a steady-state temperature and pressure.

(3) Operating pumps excluded.

(4) In the movement test of rod 6 of safety group 4 of the Unlt 2 control rod system due June 27, 1978, an extension period of seven days to the maximum allowable interval between surveillances is allowed. This seven-day extension period shall expire on July 4,1978.

8001130 / 7 3

- --